No Exceptions Taken definition

No Exceptions Taken means that fabrication, manufacture, or construction may proceed providing submittal complies with contract documents.
No Exceptions Taken. , which means reviewed for construction, fabrication or manufacturer, subject to the provision that the work shall be in accordance with the requirements of the contract documents. Final acceptance of the work shall be contingent upon such compliance.
No Exceptions Taken means that the shop drawing is correct as to performance, capacity, etc. and substantial conformance to the contract drawings and specifications. Fabrication and/or purchase may commence.

Examples of No Exceptions Taken in a sentence

  • Construction Manager will perform no Work requiring a Submittal until such Submittal is submitted and No Exceptions Taken by Owner and/or the Owner’s Architect-Engineer.

  • Services and other similar charges for the review of resubmissions of shop drawings that have been marked as "No Exceptions Taken" or "Make Corrections Noted".

  • Design Builder will perform no Work requiring a Submittal until such Submittal is submitted and No Exceptions Taken by Owner and/or the Project Design Criteria Professional.

  • Status of Submittal (No Exceptions Taken, Reviewed as Modified, Revise and Resubmit, Not Reviewed/Rejected).

  • When the Architect marks a submittal "No Exceptions Taken," the Work covered by the submittal may proceed provided it complies with requirements of the Contract Documents.

  • Contractor shall provide reproducible record drawings, made from final Shop Drawings marked "No Exceptions Taken" or "Approved as Noted." Contractor shall ▇▇▇▇ each section legibly to record manufacturer, trade name, catalog number, and supplier of each Product and item of equipment actually installed.

  • Up to three (3) copies of each submittal, except manuals, schedule of costs for progress payments, and as-built drawings will be returned to the Contractor marked "No Exceptions Taken," “Make Corrections Noted - Do Not Resubmit,” or “Make Corrections Noted - Resubmit.” Manuals, schedule of costs, and as-built drawings will be returned for re-submittal if incomplete or unacceptable.


More Definitions of No Exceptions Taken

No Exceptions Taken means that fabrication, manufacture or construction may proceed providing the submittal complies with the Contract Documents.
No Exceptions Taken means approved as submitted
No Exceptions Taken. : "No Exceptions Taken" means the submission is in general conformance with design concept. Construction, fabrication and/ or manufacture can proceed subject to the provision that the work shall be in accordance with the requirements of the Contract Documents. Final acceptance of the work shall be contingent upon such compliance.
No Exceptions Taken. If the Submittal is marked "NO EXCEPTIONS TAKEN," this means that the Contractor can immediately begin the work encompassed by the Submittal.

Related to No Exceptions Taken

  • Company’s Knowledge means the actual knowledge of the executive officers (as defined in Rule 405 under the ▇▇▇▇ ▇▇▇) of the Company, after due inquiry.

  • Knowledge of Seller means the actual knowledge after reasonable inquiry of ▇▇▇▇▇▇ ▇. ▇▇▇▇▇▇▇▇▇, ▇▇▇▇▇▇▇ ▇▇▇▇▇▇▇, ▇▇▇ ▇▇▇▇▇▇▇▇, ▇▇▇▇ ▇▇▇▇▇▇ and B. ▇▇▇▇▇▇ ▇▇▇▇▇ III.