Operational Installed Capacity definition

Operational Installed Capacity. The gross generating capacity, in MW, of the Selected Project that has achieved Commercial Operation and for which an Independent Engineer’s report has been submitted to NYSERDA pursuant to Section 2.01(c) of this Agreement.

Examples of Operational Installed Capacity in a sentence

  • Every twelve (12) months thereafter, Seller shall provide incremental additional Contract Security in an amount equal to the product of the Uncompleted Offer Capacity (in MW) (less any Offer Capacity Reduction as defined in Section 15.07(b)) and ten-thousand dollars ($10,000), until such time as the Operational Installed Capacity equals or exceeds the product of 0.95 and the Offer Capacity (less any Offer Capacity Reduction as defined in Section 15.07(b)).

  • A licensed professional engineer with expertise in the development of offshore wind energy projects, reasonably selected by and retained by Seller in order to determine the Operational Installed Capacity of the Selected Project as provided in Section 2.01(c) of this Agreement.

  • As a condition precedent to NYSERDA’s purchase obligation in Section 2.01(a), Seller shall deliver to NYSERDA the report of an Independent Engineer demonstrating that the Operational Installed Capacity of the Selected Project is no greater than the Maximum Project Capacity.

  • The Contract Tenor under this Agreement shall be [20/25] years; provided that, once the Contract Delivery Term has begun, if a Force Majeure causes the cessation of production or delivery of at least fifty percent (50%) of the Operational Installed Capacity, the Contract Tenor for such portion of the Selected Project affected by such Force Majeure shall be extended on a day-for-day basis for the duration of such cessation of production or delivery.

  • For clarity, the cumulative total amount of Contract Security returned to Seller under this Section 15.06(b) at any point in time shall not exceed the amount equal to the Contract Security multiplied by the Operational Installed Capacity at that point in time divided by the product of 0.95 and the Offer Capacity.

  • On a prorated basis, expressed as a fraction of the Contract Security equal to the Operational Installed Capacity divided by the product of 0.95 and the Offer Capacity, within thirty (30) Business Days of NYSERDA’s receipt of an attestation from the appropriate representative of Seller that the Operational Installed Capacity is greater than zero and less than the product of 0.95 and the Offer Capacity.

  • Amounts required by Seller as Contract Security will be reduced and refunded by NYSERDA to Seller as follows: Within thirty (30) Business Days of ▇▇▇▇▇▇▇’s receipt of an Independent Engineer’s report (which may be the same report submitted for purposes of Section 2.01(c) of this Agreement) demonstrating that the Operational Installed Capacity equals or exceeds the product of 0.95 and the Offer Capacity.

  • For clarity, the cumulative total amount of Contract Security returned to Seller under this Subsection 15.05(b) at any point in time shall not exceed the amount equal to the Contract Security multiplied by the Operational Installed Capacity at that point in time divided by the product of 0.95 and the Offer Capacity.

  • Every twelve (12) months thereafter, Seller shall provide incremental additional Contract Security in an amount equal to the product of the Uncompleted Offer Capacity (in MW) and ten-thousand dollars ($10,000.00), until such times as the Operational Installed Capacity equals to or exceeds the product of 0.95 multiplied by the Offer Capacity.

  • A licensed professional engineer with expertise in the development of offshore wind energy projects, reasonably selected by and retained by Seller in order to determine the Operational Installed Capacity of the Selected Project as provided in Section 2.01(b) of this Agreement.

Related to Operational Installed Capacity

  • Installed Capacity or 'IC’ means the summation of the name plate capacities of all the units of the generating station or the capacity of the generating station (reckoned at the generator terminals), approved by the Commission from time to time;

  • Contracted Capacity means the capacity (in MW AC) contracted with MSEDCL for supply by the successful bidder at the Delivery Point from the Solar Power Project.

  • Licensed capacity means the number of children the Department has determined the day care home can care for at any one time in addition to any children living in the home who are under the age of 12 years. Children age 12 and over on the premises are not considered in determining licensed capacity.

  • Reserved Capacity means the maximum amount of capacity and energy that the Transmission Provider agrees to transmit for the Transmission Customer over the Transmission Provider’s Transmission System between the Point(s) of Receipt and the Point(s) of Delivery under Tariff, Part II. Reserved Capacity shall be expressed in terms of whole megawatts on a sixty (60) minute interval (commencing on the clock hour) basis.

  • Potential electrical output capacity means thirty-three percent (33%) of a unit's maximum design heat input, divided by three thousand four hundred thirteen (3,413) Btu/kilowatt hour, divided by one thousand (1,000) kilowatt hour/megawatt hour, and multiplied by eight thousand seven hundred sixty (8,760) hours/year.