Primary Terminals definition
Examples of Primary Terminals in a sentence
Signifies terminals where some terminal data is not complete, but which will be treated as Primary Terminals so long as, in order for the Vessel to be accepted by the terminal, no changes are required to the principal dimensions of the Vessel, including: length, breadth, draft, displacement, location of cargo manifolds and lay-out of cargo manifolds (pipe size, layout of liquid and vapour lines, manifold dimensions, etc).
Once Owners are reasonably satisfied that a Terminal Under Construction is in all material respects compatible with the Vessel so as to allow safe navigation, loading and/or discharge, and the Terminal Under Construction has confirmed to Owners that they are prepared to accept the vessel to call and carry out cargo operations at their terminal (once completed), Owners agree to add such Terminal Under Construction to the list of Primary Terminals.
Signifies terminals that are under construction at the date of signing the Charter party and are not Primary Terminals (“Terminals Under Construction”).
Once Owners are reasonably satisfied that an Pending Terminal is in all material respects compatible with the Vessel so as to allow safe navigation, loading and/or discharge, and the Pending Terminal has confirmed to Owners that they are prepared to accept the vessel to call and carry out cargo operations at their terminal (once completed), Owners agree to add such Pending Terminals to the list of Primary Terminals.
Signifies terminals which have identified compatibility issues and are not Primary Terminals.
If following such compatibility studies, Owners deem a terminal compatible; such terminal shall be added to the Primary Terminals list in Appendix A.
All costs incurred in relation to such testing and recalibration under (i), (ii) and (iii) above shall be for Owner’s account, unless such costs are incurred at Charterer’s request in order to enable the Vessel to be utilized to provide transportation between ports other than the Primary Terminals.
If following such compatibility studies, Owners deem a terminal compatible, such terminal shall be added to the Primary Terminals list in Appendix A.
If Charterer directs the Vessel to any LNG loading or receiving facilities other than Class 1 Primary Terminals, Charterer shall give notice to Owner sufficiently in advance thereof so as to enable Owner to comply with health, safety, environmental or other similar regulations applicable to such other terminals including any alteration or modification required to the Vessel to meet the interface requirements of such other terminals.
Upon completing such modifications, the terminal in respect of which such modifications are made, and/or any terminal where a compatibility study has been successfully completed in respect of the Vessel, shall be considered a Class 1 Primary Terminal and shall be added to the list of Class 1 Primary Terminals in Appendix I to Schedule I.