Project Base Scope definition

Project Base Scope means the elements of the Project identified in sections 1 through 5 of Section 2.3 of the Draft RFQ.
Project Base Scope means the elements of the Project identified in Ssections 1.4.2(a) through (f)5 of the Instructions to Offerors that comprise a portion of the Definitive RFPSection 2.3 of the Draft RFQ.
Project Base Scope means the elements of the Project identified in Ssections 1.4.2(a) through (f)5 of the Instructions to Offerors that comprise a portion of the Definitive RFPSection 2.3 of the Draft RFQ. 1.2.22.1 2.23. “Project Direct Costs” means the costs that will be covered by the availability payment structure generally described in Sections 6.1 and

Examples of Project Base Scope in a sentence

  • The Joint Board will conduct the Procurement in a manner that invites Short-Listed Offerors to submit proposals on both the Project Base Scope and the Project Enhanced Scope, utilizing the scope ladder as they deem necessary or appropriate to identify those Project elements that they propose to deliver within the Affordability Cap.

  • The Parties acknowledge that the costs associated with preparing for, designing, constructing, financing, and performing a programmed level of operations and maintenance on the Project Base Scope over the Project Term are currently estimated to be approximately $60 millionexpected to be within the Affordability Cap.

  • The RFP will thus provide that Short-Listed Offerors may: (a) remove one or more elements of Project Base Scope if necessary to stay within the Affordability Cap, or (b) add one or more elements of the Project Enhanced Scope if possible while staying within the Affordability Cap.

  • The Joint Board will, in the course of the RFP process, develop a ranking and prioritization of the elements of Project Base Scope and Project Enhanced Scope through the use of a “scope ladder” schedule, which will be made available to the Short-Listed Offerors.

  • The Definitive RFP will thus provide that Short-Listed Offerors may: (a) remove one or more elements of Project Base Scope if necessary to stay within the Affordability Cap, or (b) add one or more elements of the Project Enhanced Scope if possible while staying within the Affordability Cap.

  • The Parties acknowledge that the costs associated with preparing for, designing, constructing, and performing a programmed level of operations and maintenance on the Project Base Scope over the Project Term are currently estimated to be approximately $60 million.

  • The Joint Board will, in the course of the Procurement RFP process, develop a ranking and prioritization of the elements of Project Base Scope and Project Enhanced Scope through the use of a “scope ladder” schedule, which will be made available to the Short-Listed Offerors.

Related to Project Base Scope

  • Project Scope means the description or activity of work to be accomplished on the project.

  • Project Year means the 12 month period beginning from the Effective Date and ending 12 months thereafter and each successive 12 month period following thereafter;

  • Baseline area means any intrastate area (and every part thereof) designated as attainment or unclassifiable under section 107(d)(1) (A)(ii) or (iii) of the Act in which the major source or major modification establishing the minor source baseline date would construct or would have an air quality impact for the pollutant for which the baseline date is established, as follows: equal to or greater than one (1) microgram per cubic meter (annual average) for SO2, NO2, or PM10 ; or equal to or greater than 0.3 micrograms per cubic meter (annual average) for PM2.5.

  • Project Work means the work required to complete the Project.

  • Commissioning Tests means all of the procedures and tests which, in accordance with the Reasonable and Prudent Standard, and in compliance with industry guidelines, practices and standards, are: