Project Control Plan definition

Project Control Plan means the project control plan if any approved by the Superintendent pursuant to clause 21.
Project Control Plan means the procedures document for the Project agreed by the Project Manager and the Architect pursuant to Clause 2.2 as the same may be amended from time to time by agreement between the parties;

Examples of Project Control Plan in a sentence

  • Project Management will include the development of a Project Control Plan (Work Plan), which includes scope, schedule, and budget controls.

  • The proposed Detailed Design Plan shall consist of such activities as development and design, manufacture, assembly, integration, inspection, QA, Project Control Plan, testing, acceptance of the FACILITY, detailed design, delivery schedule of training and technical documents and any other obligation in accordance with the terms and the conditions of this Agreement and/or the Technical Specifications.

  • The Contractor shall provide the City a Project Control Plan delineating objectives, resources, time, tasks and sub tasks, organization and deliverables.

  • Baselining FFD Project Control Plan and Safety and Mission Assurance Plan.

  • The proposed Detailed Design Plan shall consist of such activities as development and design, manufacture, assembly, integration, inspection, QA, Project Control Plan, testing, acceptance of the MSRS, detailed design, delivery schedule of training Optional On Site Support and technical documents and any other obligation in accordance with the terms and the conditions of this Agreement and/or the Technical Specifications.

  • A meeting held before work begins on a project in which the Project Control Plan is discussed by the project manager, the lead technical professionals, the quality control reviewers, and others as appropriate.

  • Upon such approval, the Licensor shall perform the following: o develop and review with the Licensee, a realistic Project Control Plan (PCP) defining the project timeline, tasks, responsibilities of parties, deliverables and time frame for each individual task and project duration.

  • Contractor shall develop a Project Control Plan document as described in Task 0, which shall be reviewed and approved by the VSAP Program Manager.

  • Each party acknowledges that changes to a Statement of Work may be necessary and may occur as a result of a Conference Room Pilot, modification design session(s), and/or Change Order(s), and may result in a change to the Project Control Plan.

  • Engineering documentation and analysis, component testing, unmanned and manned high fidelity tests, and processes, closely adhere to NASA standards, especially the NPR 8705.2B, STD 6016, STD 3001, and NPR-7120.5, as reflected in our FFD Project Control Plan document.

Related to Project Control Plan

  • Traffic Control Plan means a specific plan that includes but is not limited to signing; application and removal of pavement markings; construction sequencing and scheduling; methods and devices for delineation and channelization; placement and maintenance of devices; traffic regulation; and inspection.

  • Erosion and sediment control plan or "plan" means a document containing material for the conservation of soil and water resources of a unit or group of units of land. It may include appropriate maps, an appropriate soil and water plan inventory and management information with needed interpretations, and a record of decisions contributing to conservation treatment. The plan shall contain all major conservation decisions to ensure that the entire unit or units of land will be so treated to achieve the conservation objectives.

  • Transition Plan means a transition plan, acceptable to the LHIN that indicates how the needs of the HSP’s clients will be met following the termination of this Agreement and how the transition of the clients to new service providers will be effected in a timely manner; and

  • Project Implementation Plan means the detail plan submitted by the Developer with regard to development of Project Facilities and its operation and management thereof in accordance with this Agreement and to be appended as Schedule 9 to this Agreement.

  • Virginia Erosion and Sediment Control Program or "VESCP" means a program approved by the