Ramping Capability definition

Ramping Capability means the sustained rate of change of generator output, in megawatts per minute.
Ramping Capability means the sustained rate of change of generator output, in megawatts per minute. “Real-time Congestion Price” shall mean the Congestion Price resulting from the Office of the Interconnection’s dispatch of the PJM Interchange Energy Market in the Operating Day.

Related to Ramping Capability

  • Available Flowgate Capability or “AFC” shall mean the rating of the applicable Flowgate less the projected loading across the applicable Flowgate less TRM and CBM. The firm AFC is calculated with only the appropriate Firm Transmission Service reservations (or interchange schedules) in the model, including recognition of all roll-over Transmission Service rights. Non- firm AFC is determined with appropriate firm and non-firm reservations (or interchange schedules) modeled.

  • Operating Capacity means the effective storage capacity of a tank, taking into account accepted engineering principles, industry standards, API guidelines and Applicable Law, only as to Products that each tank is capable of storing, within the requirements of applicable permit requirements and under actual conditions as they may exist at any time. The Operating Capacity of each tank is listed on the applicable Terminal Service Order as of the date of such Terminal Service Order.

  • Alternate Fuel Capability means a situation where an alternate fuel could have been utilized whether or not the facilities for such use have actually been installed; provided however, where the use of natural gas is for plant protection, feedstock or process uses and the only alternate fuel is propane or other gaseous fuel, then the Buyer will be treated as if he had no alternate fuel capability.

  • Generating Facility Capacity means the net seasonal capacity of the Generating Facility and the aggregate net seasonal capacity of the Generating Facility where it includes multiple energy production devices. Good Utility Practice shall mean any of the practices, methods and acts engaged in or approved by a significant portion of the electric industry during the relevant time period, or any of the practices, methods and acts which, in the exercise of reasonable judgment in light of the facts known at the time the decision was made, could have been expected to accomplish the desired result at a reasonable cost consistent with good business practices, reliability, safety and expedition. Good Utility Practice is not intended to be limited to the optimum practice, method, or act to the exclusion of all others, but rather to delineate acceptable practices, methods, or acts generally accepted in the region. Governmental Authority shall mean any federal, state, local or other governmental regulatory or administrative agency, court, commission, department, board, or other governmental subdivision, legislature, rulemaking board, tribunal, or other governmental authority having jurisdiction over any of the Parties, their respective facilities, or the respective services they provide, and exercising or entitled to exercise any administrative, executive, police, or taxing authority or power; provided, however, that such term does not include Developer, NYISO, Affected Transmission Owner, Connecting Transmission Owner, or any Affiliate thereof. Hazardous Substances shall mean any chemicals, materials or substances defined as or Highway shall mean 115 kV and higher transmission facilities that comprise the following NYCA interfaces: ▇▇▇▇▇▇▇▇ East, West Central, ▇▇▇▇▇▇ East, ▇▇▇▇▇ South, Central East/Total East, and UPNY-ConEd, and their immediately connected, in series, bulk power system facilities in New York State. Each interface shall be evaluated to determine additional “in series” facilities, defined as any transmission facility higher than 115 kV that (a) is located in an upstream or downstream zone adjacent to the interface and (b) has a power transfer distribution factor (DFAX) equal to or greater than five percent when the aggregate of generation in zones or systems adjacent to the upstream zone or zones that define the interface is shifted to the aggregate of generation in zones or systems adjacent to the downstream zone or zones that define the interface. In determining “in series” facilities for ▇▇▇▇▇▇▇▇ East and West Central interfaces, the 115 kV and 230 kV tie lines between NYCA and PJM located in LBMP Zones A and B shall not participate in the transfer. Highway transmission facilities are listed in ISO Procedures. Initial Synchronization Date shall mean the date upon which the Large Generating Facility is initially synchronized and upon which Trial Operation begins, notice of which must be provided to the NYISO in the form of Appendix E-1. In-Service Date shall mean the date upon which the Developer reasonably expects it will be ready to begin use of the Connecting Transmission Owner’s Attachment Facilities to obtain back feed power. Interconnection Facilities Study shall mean a study conducted by NYISO or a third party consultant for the Developer to determine a list of facilities (including Connecting Transmission Owner’s Attachment Facilities, Distribution Upgrades, System Upgrade Facilities and System Deliverability Upgrades as identified in the Interconnection System Reliability Impact Study), the cost of those facilities, and the time required to interconnect the Large Generating Facility with the New York State Transmission System or with the Distribution System. The scope of the study is defined in Section 30.8 of the Standard Large Facility Interconnection Procedures.

  • Nameplate Capacity Rating means the maximum capacity of the Facility as stated by the manufacturer, expressed in kW, which shall not exceed 10,000 kW.