RE System definition

RE System means the grid connected or off grid system to generate electricity from such source(s), which are recognized as RE source(s) by Ministry of New and Renewable Energy (MNRE), Government of India or any other agency, as may be notified by the Government/Commission;
RE System means the electrical energy generating portion of the CBRE Facility to be located at the CBRE Facility, together with all materials, equipment systems, structures, features and improvements.
RE System means the renewable energy system installed by the Customer (including any equipment that is not provided by the Company connecting the RE System to the Network) described in Schedule 1. It carries the same meaning as the Renewable Energy Power System (REPS) as defined in the Technical Guidelines on Grid Connection of Renewable Energy Power Systems issued by the Electrical and Mechanical Services Department (EMSD).

Examples of RE System in a sentence

  • The limitations under this section 6.3 also apply to you if the total generation capacity of the RE System is at or below 200kW.

  • The RE System [and ▇▇▇▇] shall be located at the CBRE Facility as shown in its application at all times during the Term.

  • Except with respect to any claim by Borrower against Lender, Borrower shall cooperate fully with Lender with respect to any proceedings before any court, board or other Governmental Authority which may in any way affect the rights of Lender hereunder or any rights obtained by Lender under any of the Note, the Pledge Agreement or the other Loan Documents and, in connection therewith, permit Lender, at Lender’s election, to participate in any such proceedings.

  • If Substantial Progress has been achieved, but the Commercial Operations Date has not been achieved by the Commercial Operations Date Deadline, and Subscriber Organization still intends to complete its CBRE Facility, then the Subscriber Organization shall pay a “late fee” to Company of $200/day/MW nameplate capacity of the RE System until the CBRE Facility achieves the Commercial Operations Date.

  • CEIG Approval for the PPA Capacity, if applicable; (In compliance with section 162 of Electricity Act, 2003 installation of Grid Connected RE System up to 100 kW capacity is exempt from Chief Electrical Inspector to Government (CEIG) approval, Further, Grid Connected RE System up to 500 kVA capacity as per MOP notification no 1204, May 2016 would be exempt from obtaining approval from Chief Electrical Inspector to Government (CEIG)).

  • The RE System must not be built or previously interconnected at the time of application to the CBRE Program.

Related to RE System

  • E-System means any electronic system approved by Agent, including Intralinks® and ClearPar® and any other Internet or extranet-based site, whether such electronic system is owned, operated or hosted by Agent, any of its Related Persons or any other Person, providing for access to data protected by passcodes or other security system.

  • Levee system means a flood protection system which consists of a levee, or levees, and associated structures, such as closure and drainage devices, which are constructed and operated in accordance with sound engineering practices.

  • Capture system means all equipment (including, but not limited to, hoods, ducts, fans, booths, ovens, dryers, etc.) that contains, collects, and transports an air pollutant to a control device.

  • Sewage system means the entire sewage treatment and subsurface disposal system;

  • Health care system means any public or private entity whose function or purpose is the management of, processing of, enrollment of individuals for or payment for, in full or in part, health care services or health care data or health care information for its participants;