Retest Date definition

Retest Date means July 15, 2021 and every 3 months thereafter so long as the Advance Rate Increase Condition was not met on the prior Retest Date.
Retest Date means the date when an active substance used as a starting material in veterinary medicinal products should be re-examined to ensure that it is still suitable for use;
Retest Date means for each lot of the Codexis Enzyme the required retest date as specified on the CoA of such lot, and "Retest Period" shall mean the period from delivery of the Enzyme until the first Retest Date and subsequent to the first Retest Date the period between Retest Dates.

Examples of Retest Date in a sentence

  • If, as of any such Retest Date, the Minimum Required Debt Yield is then satisfied, Borrower shall have no further obligation to deposit Excess Cash Flow into the Borrower’s Funds Account during such Excess Cash Flow Collection Period and all amounts then on deposit in the Borrower’s Funds Account shall be promptly released to Borrower.

  • Except with the prior written consent of Pfizer, Codexis shall not make any delivery of Codexis Enzyme (i) [***] prior to the delivery date of the Codexis Enzyme to Pfizer, its Affiliates or Pfizer Designees, and (ii) for which the Retest Date is less than [***] after the delivery date of the Codexis Enzyme to Pfizer, its Affiliates or Pfizer Designees.

  • Date of Mfg: October 2006 Retest Date: April 2006 Expiration Date: October 2007 Lot No.: [***] [***] [***] Confidential treatment has been requested for portions of this exhibit.

  • In the event that at any time amounts are retained in the Distribution Reserve Account pursuant to this clause (A), Borrower shall perform, pursuant to Section 5.22 of the Financing Agreement, quarterly retests (the date of such quarterly retest, the “Quarterly Retest Date”) of the Average Annual Debt Service Coverage Ratio as of the Quarterly Retest Date to determine if the Distribution Reserve Requirement shall have been satisfied.

  • Not later than five (5) Banking Days after each Repayment Date (and if amounts are on deposit in the Distribution Reserve Account, on each Quarterly Retest Date), Borrower shall calculate and deliver to Administrative Agent the Average Annual Debt Service Coverage Ratio for the year ending on such Repayment Date.

  • By: /s/ ▇▇▇▇▇▇ ▇▇▇▇▇▇ By: /s/ ▇▇▇▇ ▇▇▇▇▇▇ Name: ▇▇▇▇▇▇ ▇▇▇▇▇▇ Name: ▇▇▇▇ ▇▇▇▇▇▇ Title: President Title: Chief Executive Officer By: /s/ ▇▇▇▇▇ ▇▇▇▇▇▇▇▇▇ Name: ▇▇▇▇▇ ▇▇▇▇▇▇▇▇▇ Title: CFO Page 1 Product Name: Calcitriol Order No.: Control No.: [*] Customer Name/No.: Drug Master File Lab Record No.: - Quantity: Manufacturing Site: [*] Analysis Date: Manufacturing Date: Re-test Date: ************** Packaging and Storage: Store under [*], in [*], [*], Temp.


More Definitions of Retest Date

Retest Date is defined in Section 8.1.10.
Retest Date means each anniversary of a Reamortization Failure.

Related to Retest Date

  • LCA Test Date has the meaning specified in Section 1.03(e).

  • Test Date means, with respect to any Start Date, the last day of the most recent fiscal quarter of the Borrower ended immediately prior to such Start Date.

  • LCT Test Date shall have the meaning provided in Section 1.12(b).

  • Plant Test Date or "PTD" means the date acceptance testing is performed with CLEC. "Point of Interface", "Point of Interconnection," or "POI" is a demarcation between the networks of two (2) LECs (including a LEC and CLEC). The POI is that point where the exchange of traffic takes place.