Site Constraints definition

Site Constraints means the extract from the Design Code reflecting the site constraints applicable to the Property and annexed to the Contract of Sale and marked Annexure “E”;
Site Constraints means any constraints or asset protection issues relating to the Railway which may affect the Site as communicated in writing by Network Rail to the Customer from time to time;

Examples of Site Constraints in a sentence

  • Confirm pipe sizing for the new Lincoln High BPS Continued Site Layout ✓ Site Constraints and Alternatives ✓ Stormwater Control ✓ Infiltration Systems ✓ Piping Layouts ✓ Landscape Restoration/Protection Concept Site Layout P&ID ✓ Facility P&ID Process Review Architecture ✓ Facility Sketches Architectural Approach Resourcing materials and responsible building features for gaining Envision certification.

  • Site Constraints Allowance 102,098 Total Estimated Construction Cost 3,505,365 See Preliminary Design Report – Facility Condition Assessment and Recommendations DRAFT, dated 9/ 14/ 2020 for further details.

  • Site Constraints Map, First Constraints Map Amendment and Second Constraints Map Amendment.

  • At each Design Consultant submittal (Schematic, Design Development, 50% C D.‟s and 100% CD‟s), Construction Project Manager shall review the in-progress design documents for adherence to the Program Requirements, Constructability, Sustainability, Energy Efficiency, Appropriate Technology, Engineering and Design Specialty, Site Constraints, Functional Analysis, Best Practices, Schedule and Cost.

  • If the Property is identified on the Site Constraints Map furnished to Buyer as part of the Inspection Documents as being potentially exposed to geohazard conditions (“Geohazard Lot”), Buyer shall adhere to and comply with the geohazard standards, requirements and procedures set forth in Section 4.1 of the Declaration and in the Resolutions.

  • Delivery milestones 2012: grant planning permission 2013: start implementation on site 2023: completion Planning guidance E arl’s Court and West Kensington Opportunity Area Joint Supplementary Planning Document (adopted 2012) Site Constraints Part of the site falls within Flood Zones 2 and 3.

  • Site Constraints The existing facility is located in the Sammamish River Buffer zone.

  • N/A Staffing One visit per day would occur at the site N/A Site Constraints Structures should be aesthetically pleasing N/A Flooding of the channel would provide a natural release to the system.

  • Site Constraints  Brompton Cemetery is designated Grade I on English Heritage's Register of Parks and Gardens is adjacent to the site  Philbeach Gardens Conservation Area surrounds the site to the east.

Related to Site Constraints

  • Pre-Construction Phase Services means the participation, documentation and execution of Contractor’s Pre-Construction Phase deliverables as required by this Agreement and further defined in Article 5.

  • Pipeline Construction means a substantial disturbance to agricultural land associated with installation, replacement, removal, operation or maintenance of a pipeline, but shall not include work performed during an emergency. Emergency means a condition where there is clear and immediate danger to life or health, or essential services, or a potentially significant loss of property. When the emergency condition ends, pipeline construction will be in accordance with these rules.

  • Environmentally constrained area means the following areas where the physical alteration of the land is in some way restricted, either through regulation, easement, deed restriction or ownership such as: wetlands, floodplains, threatened and endangered species sites or designated habitats, and parks and preserves. Habitats of endangered or threatened species are identified using the Department's Landscape Project as approved by the Department's Endangered and Nongame Species Program.

  • The constructional plant means all appliances, tools, plants or machinery or whatsoever nature required in or about the execution, completion or maintenance of the works but does not include materials or other things intended to form part of the permanent work.