System Developer definition
Examples of System Developer in a sentence
Whenever the Large Generating Facility is operated in parallel with the New York State Transmission System, Developer shall operate the Large Generating Facility with its governor or equivalent controls in service and responsive to frequency.
Once Developer has synchronized the Large Generating Facility with the New York State Transmission System, Developer shall operate the Large Generating Facility consistent with the provisions specified in Articles 9.5.5.1 and 9.5.5.2 of this Agreement.
Once the Developer has synchronized the Large Generating Facility with the New York State Transmission System, Developer is required to operate the Large Generating Facility to produce or absorb reactive power within the design capability of the Large Generating Facility set forth in Article 9.5.1 (Power Factor Design Criteria).
The Consumer/ Prosumer/Solar Power System Developer under third party sale shall bear all costs related to setting up of Rooftop Solar Photovoltaic System including metering and inter-connection.
The Consumer/Prosumer/Solar Power System Developer under third party sale shall obtain all the necessary statutory approvals and clearances (environmental and grid connection related) before connecting the photovoltaic system to the distribution system.
The Consumer/Prosumer/Solar Power System Developer under third party sale agrees to pay the actual cost of modifications and upgrades to the service line, cost of up gradation of transformer to connect photovoltaic system to the grid in case it is required.
Prior to the installation of said System, Developer shall, at no cost or expense to Xcel Energy, grant such easement rights as Xcel Energy may require for the installation, operation, and maintenance of said System, will provide permanent access to said System and grants Xcel Energy the right to install, operate and maintain said System on the Development Property.
If any mechanic’s, laborer’s or materialman’s lien shall at any time be filed against the Property, the Premises or the PV System, Developer, within ten (10) days after notice to Developer of the filing thereof, shall cause such lien to be discharged of record by payment, deposit, bond, insurance, order of court of competent jurisdiction or otherwise.
The System Developer will be responsible for meeting the requirements of the FDA and other governing regulatory agencies that are applicable during the development stage.
If Developer, thereafter, desires to transfer ownership and/or control of the Stormwater Control System, Developer and the proposed transferee shall first request that the Permit be re-issued to the proposed transferee.