Test 3 definition
Examples of Test 3 in a sentence
Return to Duty Test 3, Follow-up Testing, Subject to disciplinary action except where substantial mitigating circumstances exist.
Test 3 cylinders, 1 cylinder from each of the 3 groups of cylinders (i.e. 1A, 2A, 3A) prior to stripping.
Test 3: The food and/or beverages provided are not related directly to amusement and/or social events.
ISO 148-1983 Steel – Charpy Impact Test (v-notch) ISO 188:2011 Rubber, volcanized or thermoplastic – Accelerated ageing and heat resistance tests ISO 306:2004 Plastics - Thermoplastic Materials – Determination of Vicat Softening Temperature ISO 527-2:2012 Plastics – Determination of tensile properties – Part 2: Test conditions for moulding and extrusion plastics ISO 642:1999 Steel-Hardenability Test by End Quenching (Jominy Test) 3 British Standards Institution.
After such testing (Test #3), if the results are still in dispute by either Party, part #4 of such sample shall be analyzed by an independent third party testing laboratory agreed upon by Producer and SSS (the “Alternate Testing Lab”) in accordance with ASTM standards.
ISO 148-1983 Steel – Charpy Impact Test (v-notch) ISO 188 Rubber, volcanized or thermoplastic – Accelerated ageing and heat resistance tests ISO 306-1987 Plastics - Thermoplastic Materials – Determination of Vicat Softening Temperature ISO 527 Pt 1-93 Plastics - Determination of Tensile Properties – Part I: General principles ISO 642-79 Steel-Hardenability Test by End Quenching (Jominy Test) 3 British Standards Institution.
Test # 1Date: Test #1 Time: Entered in Calendar (initial) Test # 2 Date: Test # 2 Time: Entered in Calendar (initial) Test # 3 Date: Test #3 Time: Entered in Calendar (initial) • There is no charge for proctoring.
After such testing (Test #3), if the results are still in dispute by either Party, part #4 of such sample shall be analyzed by an independent third party testing laboratory agreed upon by Seller and SSS (the “Alternate Testing Lab”) in accordance with ASTM standards.
OTHER SERVICES AVAILABLE TO BOSCH FOR PURCHASE ON AN "AS REQUESTED" BASIS Item: ----- 1) Process/Test Engineering 2) Prototype Assembly and Test 3) Supplier Quality Engineering (Mechanical) 4) Unique Test/Process Equipment 5) Mechanical and Test Equipment Calibration Schedule 12.5(b) REAL PROPERTY SUBLEASE THIS SUBLEASE is made as of this 8th day of June, 1998, by and between Broadband Technologies, Inc.
The release of ammonia occurred in roughly the same concentration as previously described in Test 3 – ND3/H2 for the 0.624 wt% Pt/5A (PB-00382-20) sample (Figure 3-6).