Time Extension definition

Time Extension shall have the meaning set forth in Clause 10.5;
Time Extension means any time extension as defined in section “Extensions and Reciprocal Inspections.” of these rules and issued by EPD, the Management Contractor or an authorized agent of EPD to the owner of a responsible motor vehicle certifying that such owner and vehicle have met the requirements in the Act and this Chapter for extending the time to comply with the emission inspection requirement.
Time Extension means an increase in the length of time specified in a contract resulting in a revised contract completion date.

Examples of Time Extension in a sentence

  • Provided further that notwithstanding anything to the contrary contained in this Agreement, Time Extension shall be due and applicable only for the Works which are affected by the aforesaid events or circumstances and shall not in any manner affect the Project Completion Schedule for and in respect of the Works which are not affected hereunder.

  • Provided that when determining each extension of time under this Clause 10.5, the Authority’s Engineer shall review previous determinations and may increase, but shall not decrease, the total Time Extension.

  • The Authority’s Engineer shall, within a period of 30 (thirty) days from the date of receipt of such clarifications, forward in writing to the Contractor its determination of Time Extension.

  • In the event of any delay in dismantling of structures thereof for reasons beyond the control of the Contractor, the Contractor shall be entitled to Damages in a sum calculated in accordance with the formula specified in Clause 8.3 (i) for the period of delay, and to the Time Extension in accordance with Clause 10.5 for and in respect of the part(s) of the Works affected by such delay; provided that if the delays involve any time overlaps, the overlaps shall not be additive.

  • In the event the Contractor fails to complete the Works in accordance with the Project Completion Schedule, including any Time Extension granted under this Agreement, the Contractor shall endeavour to complete the balance work expeditiously and shall pay Damages to the Authority in accordance with the provisions of Clause 10.3 (ii) for delay of each day until the Works are completed in accordance with the provisions of this Agreement.


More Definitions of Time Extension

Time Extension means the grant by Seller to Buyer of additional time to complete the Work or
Time Extension means extension of time to complete the construction of building to be sanctioned by the Board under section 183-A of the Cantonments Act 1924.
Time Extension shall have the meaning set forth in Clause 10.5; “User” means a person who travels or intends to travel on the Project Highway or any part thereof in/on any vehicle; “Valuation of Unpaid works” shall have the meaning set forth in Clause 23.5; “Works” means all works including survey and investigation, design, engineering, procurement, construction, Plant, Materials, maintenance, temporary works and other things necessary to complete the Project Highway in accordance with this Agreement; and “WPI” means the wholesale price index for various commodities as published by the Ministry of Commerce and Industry, GOI and shall include any index which substitutes the WPI, and any reference to WPI shall, unless the context otherwise requires, be construed as a reference to the WPI published for the period ending with the precedingmonth. Contract AgreementPage 26 of 153 “Widening / Improvement to 4 (Four) Lane with Paved Shoulder configuration of existing single lane road from Kachukhana Harichara Paglagaunj to Dhubri - Phulbari Bridge approach (Package-II) of Srirampur - Dhubri Section of NH-127B from existing Km 28.050 to Km 55.060 (Design Km 27.650 to Km 54.154), (Design Length=26.504 Km) on EPC Mode in the State of Assam under JICA - ODA loan assistance.” Mar 2022
Time Extension shall have the meaning set forth in Clause 10.5; “User” means a person who travels or intends to travel on the Project Highway or any part thereof in/on any vehicle; “Valuation of Unpaid works” shall have the meaning set forth in Clause 23.5; “Works” means all works including survey and investigation, design, engineering, procurement, construction, Plant, Materials, maintenance, temporary works and other things necessary to complete the Project Highway in accordance with this Agreement; and “WPI” means the wholesale price index for various commodities as published by the Ministry of Commerce and Industry, GOI and shall include any index which substitutes the WPI, and any reference to WPI shall, unless the context otherwise requires, be construed as a reference to the WPI published for the period ending with the preceding month. Contract AgreementPage 25 of 152 “Construction of Four Lane Panchgram Bypass from Design Chainage km 15+500 on NH- 37 (Old NH-53) at Kalinagar Pt.-II Village to Design Chainage km 27+300 at crossing with NH-6 (Old NH-44) Near ▇▇▇▇▇▇▇▇▇ Pt.-I Village in the State of Assam on EPC Mode under Bharatmala Pariyojana in Economic Corridors (Project Length – 11.8 km)” (2nd Call) Feb 2023 1.2
Time Extension shall have the meaning set forth in Clause 10.5; “User” means a person who travels or intends to travel on the Project Highway or any part thereof in/on any vehicle; “Valuation of Unpaid works” shall have the meaning set forth in Clause 23.5; “Works” means all works including survey and investigation, design, engineering, procurement, construction, Plant, Materials, maintenance, temporary works and other things necessary to complete the Project Highway in accordance with this Agreement; and “WPI” means the wholesale price index for various commodities as published by the Ministry of Commerce and Industry, GOI and shall include any index which substitutes the WPI, and any reference to WPI shall, unless the context otherwise requires, be construed as a reference to the WPI published for the period ending with the preceding month. Draft Concession AgreementPage 25 of 155 Construction of Balance Work of 2 Lane with Paved Shoulders of Joram-Koloriang road (NH 713) on EPC basis from existing Km 138.00 to Km 158.000 (Design Km 122.353 to Km 138.389)[Design length-16.036 Km] in the State of Arunachal Pradesh under SARDP-NE Aug. 2021 1.2
Time Extension shall have the meaning set forth in Clause 10.5; “User” means a person who travels or intends to travel on the Project Highway or any part thereof in/on any vehicle; “Valuation of Unpaid works” shall have the meaning set forth in Clause 23.5; “Works” means all works including survey and investigation, design, engineering, procurement, construction, Plant, Materials, maintenance, temporary works and other things necessary to complete the Project Highway in accordance with this Agreement; and “WPI” means the wholesale price index for various commodities as published by the Ministry of Commerce and Industry, GOI and shall include any index which substitutes the WPI, and any reference to WPI shall, unless the context otherwise requires, be construed as a reference to the WPI published for the period ending with the preceding month. Draft Contract AgreementPage 24 of 261 S-D Tunnel 2022 1.2
Time Extension shall have the meaning set forth in Clause 10.4.1 of the Draft Contract Agreement;