Unit Rate Schedule definition

Unit Rate Schedule means the schedule of the Unit Rates for the year of this Agreement used in calculating cost recoveries identified herein for Infrastructure, or portions thereof, installed or constructed by the Developer or the City, which is attached hereto as Schedule “1”;

Examples of Unit Rate Schedule in a sentence

  • Where a roadway is required by the Manager, Urban Development to be a divided Major Road Standard in the case of residential roads and an undivided Major Road Standard in the case of industrial roads, then the City shall pay the cost of the additional width and depth or equivalent construction design from the Developer Funded Infrastructure Stabilization Fund – Major Road Standard Oversize to the Developer of Record the cost of such extra width and depth at prices in accordance with the Unit Rate Schedule.

  • The Developer, to the satisfaction of the Director, Roads, shall install the traffic control ducts, as shown on the Construction Drawings approved by the Manager, Urban Development, in accordance with the City’s Traffic Signal Construction Specifications, and the Developer of Record, shall be entitled to recover the full cost thereof, at prices in accordance with the Unit Rate Schedule, when the work has been certified as complete by the Consulting Engineer and acknowledged by the City.

  • The Developer, to the satisfaction of the Director, Roads, shall install the traffic control ducts, as shown on the Construction Drawings approved by the Senior Infrastructure Engineer, in accordance with the City’s Traffic Signal Construction Specifications, and the Developer of Record, shall be entitled to recover the full cost thereof, at prices in accordance with the Unit Rate Schedule, when the work has been certified as complete by the Consulting Engineer and acknowledged by the City.

  • The Developer, to the satisfaction of the Director, Mobility, shall install the traffic control ducts, as shown on the Construction Drawings approved by the Development Engineer, in accordance with the City’s Standard Specifications Street Lighting Construction, and the Developer of Record shall be entitled to recover the full cost thereof, at prices in accordance with the Unit Rate Schedule, when the work has been certified as complete by the Consulting Engineer and acknowledged by the City.

  • The Developer, to the satisfaction of the Director, Roads, shall install the traffic control ducts, as shown on the Construction Drawings approved by the Development Engineer, in accordance with the City’s Standard Specifications Street Lighting Construction, and the Developer of Record, shall be entitled to recover the full cost thereof, at prices in accordance with the Unit Rate Schedule, when the work has been certified as complete by the Consulting Engineer and acknowledged by the City.

  • The Contractor shall perform On-Call City-Wide Security Services for in accordance with Request for Proposals, as stipulated in the attached Scope of Services (Exhibit A) and Contractor's Unit Rate Schedule (Exhibit B) and as stipulated herein.

  • Where a roadway is required by the Manager, Growth Management to be a divided Major Road Standard in the case of residential roads and an undivided Major Road Standard in the case of industrial roads, then the City shall pay the cost of the additional width and depth or equivalent construction design from the Developer Funded Infrastructure Stabilization Fund – Major Road Standard Oversize to the Developer of Record the cost of such extra width and depth at prices in accordance with the Unit Rate Schedule.

  • The Developer, to the satisfaction of the Director, Roads, shall install the traffic control ducts, as shown on the Construction Drawings approved by the Coordinator, Development Servicing, in accordance with the City’s Traffic Signal Construction Specifications, and the Developer of Record, shall be entitled to recover the full cost thereof, at prices in accordance with the Unit Rate Schedule, when the work has been certified as complete by the Consulting Engineer and acknowledged by the City.

  • Payment for equipment rental used in conjunction with the unit labor plus material pricing stated in paragraph 6.3.1 above (as such unit rates are established in the Equipment Unit Rate Schedule) is for all Contractor-owned construction equipment with a new value of One Thousand Dollars ($1,000.00) or more, authorized for use in the work.

  • Labor and equipment to be paid by Client shall be according to the attached annual budget estimate, and WETs Standard Unit Rate Schedule.

Related to Unit Rate Schedule

  • Rate Schedule or “Rider” means the rate or charge for a particular classification of service, including all special terms and conditions under which that service is furnished at the prescribed rate or charge.

  • Rate Schedules means the schedules of EDTI’s Distribution Tariff that set out charges;

  • Unit Rate means as set out in the Quotation Document;

  • Prices & Rates Schedule means the Schedule containing details of the Contract Price.

  • Current Unit Rates are Forest Service estimates of the unit rates for doing the work at the time the adjustment is approved.