km/h Sample Clauses

km/h. In no case the vehicle test speed shall be reduced to a vehicle speed below 40 km/h, or
km/h. In no case the vehicle test speed shall be reduced to a vehicle speed below 40 km/h, or (ii) The engine load is reduced to avoid a downshift to a gear ratio where nMAX is exceeded. If possible, the manufacturer shall take measures to avoid an acceleration value awot_test greater than 2.0 m/s2. If possible, the manufacturer shall take measures to avoid an engine speed higher than nMAX. Table 1 in Appendix 1 to Annex 3 provides examples for valid measures to enable a test condition within the above specified boundaries. Any measure used by manufacturer for the above-mentioned purposes shall be documented in the test report. The achieved acceleration awot_test is then used for the calculation of the partial power factor kP (see paragraph 3.1.2.1.3.) instead awot_ref."
km/h. The test shall comprise of three phases B-D, if the fuel is at least at temperature of 20 °C. Otherwise the test shall comprise four phases A–D.
km/h. The dummy shall cross line A (Figure 1 of Appendix 1) with a tolerance of ±0.5 m at the same time as the vehicle cross line B (Figure 1 of Appendix 1) with a tolerance of ±0.5 m. If the acceleration distance cannot be achieved, adjust bicycle starting position and vehicle corridor length by the same amount. 3 See ECE/TRANS/196, para. 91 on the Convention on Road Signs and Signals of 1968 European Agreement Supplementing the Convention and Protocol on Road Markings, Additional to the European Agreement. The lateral deviation of the dummy with respect to a straight line connecting initial starting position and theoretical collision point (as defined in Figure 1 of Appendix 1) shall be maximum ±0.2 m.
km/h. At reasonable noise and out-of-cluster interference levels at the RS positions, Kalman predictors can provide sufficient channel prediction accuracy for these “pedestrian” UEs. In our setting, the use of prediction instead of using outdated CSI almost triples the prediction horizon for which acceptable accuracy is obtained on average. The useful range e.g. corresponds to prediction horizons (feedback loop latencies) of 15 ms for 5km/h users at 2.66 GHz and to horizons of 5 ms for velocities of 57 km/h at 700 MHz.
km/h. This Regulation should therefore not apply to mobile machinery with a maximum design speed not exceeding 6 km/h or exceeding 40 km/h. 7 Regulation (EU) 2023/1230 of the European Parliament and of the Council of 14 June 2023 on machinery and repealing Directive 2006/42/EC of the European Parliament and of the Council and Council Directive 73/361/EEC (OJ L 165 29.6.2023, p. 1).
km/h. The translation engine
km/h. Time shall be measured with an accuracy of +/- 1%.

Related to km/h

  • Landlord and Storage Agreements Upon request, provide Agent with copies of all existing agreements, and promptly after execution thereof provide Agent with copies of all future agreements, between an Obligor and any landlord, warehouseman, processor, shipper, bailee or other Person that owns any premises at which any Collateral may be kept or that otherwise may possess or handle any Collateral.

  • Project Number The project number has been assigned by the Commission as the unique identifier for your project, and it cannot be changed. The project number should appear on each page of the grant agreement preparation documents to prevent errors during its handling.

  • Air and Water The Subrecipient agrees to comply with the following requirements insofar as they apply to the performance of this Agreement: - Clean Air Act, 42 U.S.C. , 7401, et seq.; - Federal Water Pollution Control Act, as amended, 33 U.S.C., 1251, et seq., as amended, 1318 relating to inspection, monitoring, entry, reports, and information, as well as other requirements specified in said Section 114 and Section 308, and all regulations and guidelines issued thereunder; - Environmental Protection Agency (EPA) regulations pursuant to 40 CFR Part 50, as amended.

  • Přetrvající platnost This Section 3 “

  • Mobile Sierra Notwithstanding any provision of this Agreement, neither Party shall seek, nor shall they support any third party seeking, to prospectively or retroactively revise the rates, terms or conditions of service of this Agreement through application or complaint to the FERC pursuant to the provisions of the Federal Power Act, absent prior written agreement of the Parties. Further, absent the prior written agreement in writing by both Parties, the standard of review for changes to the rates, terms or conditions of service of this Agreement proposed by a Party, a non-Party, or the FERC acting sua sponte shall be the “public interest” standard of review set forth in United States Gas Pipe Line Co. v.