A321 Propulsion Systems Clause Samples

The 'A321 Propulsion Systems' clause defines the requirements, specifications, and responsibilities related to the engines and associated propulsion components for the Airbus A321 aircraft. This clause typically outlines the technical standards the propulsion systems must meet, the parties responsible for maintenance and support, and any warranties or performance guarantees. For example, it may specify the type of engine to be used, maintenance intervals, and procedures for addressing defects or failures. Its core practical function is to ensure that both parties have a clear understanding of the expectations and obligations regarding the aircraft's propulsion systems, thereby minimizing disputes and ensuring operational reliability.
A321 Propulsion Systems. The Base Price of the IAEV2533-A5 Propulsion Systems for the A321 Aircraft, at delivery conditions prevailing in January 2003, is: ***** Said Base Price has been calculated from the Reference Price for the A321 Propulsion Systems indicated by International Aero Engines of US $***** in accordance with delivery conditions January 2001. ***** Confidential portions of the material have been omitted and filed separately with the Securities and Exchange Commission. Spirit Airlines - A320 FAMILY – PA 13

Related to A321 Propulsion Systems

  • Engines POSITION SERIAL NO. TOTAL HOURS TOTAL CYCLES HRS/CYCLES SINCE LAST SHOP VISIT Time Remaining to Next LIFE LIMITED PART REMOVAL PART NAME HOURS CYCLES MSN MSN

  • Engine A. Any internal repairs or replacement of internal components, or replacement of engine assembly.

  • AIRCRAFT CONFIGURATION The guarantees defined below ("the Guarantees") are applicable to the A330-200 Aircraft as described in the Technical Specification ***, as amended by the Specification Change Notices ("SCN's") for:

  • Aircraft This peril includes self-propelled missiles and spacecraft.

  • Spares The Contractor shall ensure that the Contractor’s operational base at the Site is at all times stocked with spare parts for the Contractor's Equipment that meet the requirements of the Contract, together with all necessary or desirable packing and marking for that purpose and that such spare parts are sufficient to ensure that the Work /services can continue in the event of failure of the Contractor’s Equipment.