Activation of Irrigation System Sample Clauses

Activation of Irrigation System. Each Spring on a date to be determined by the Contractor to be after the last hard freeze, the irrigation system shall be activated. Any system damages which have resulted from improper shutdown the previous fall shall be repaired at the expense of the Contractor. System damages caused by other than system shutdown will be brought to the attention of the District and approved before initiating work.
Activation of Irrigation System. Each spring, on a date to be determined by CDI in consultation with the Board and notice thereto, the irrigation system shall be activated. CDI shall immediately notify the District of any system damages which have resulted from improper shutdown the previous fall. Any such damages that were the result of CDI’s actions shall be repaired immediately at the expense of CDI. Any such damage that was the result of a prior provider’s improper shutdown or system damages caused by actions other than the system shutdown will be brought to the immediate attention of the District with details, including photographs, of such cause and/or extent of such damages, with an itemized estimate for any such repair. Any repair or initiation of such work will require prior Board approval. CDI shall at all times exercise its best efforts to operate the irrigation system in a manner that protects all components and equipment of such system and to conserve water resources.
Activation of Irrigation System. Each spring on a date to be determined by the Consultant to be after the last hard freeze, the irrigation system shall be activated. Any system damages which have resulted from improper shutdown the previous fall shall be repaired at the expense of the Consultant. System damages caused by other than system shutdown will be brought to the attention of the District and approved before initiating work. Consultant shall at all times endeavor to operate the irrigation system in a manner to conserve the water resources of the District.

Related to Activation of Irrigation System

  • Irrigation An irrigation reduced pressure zone (hereinafter referred to as “RPZ”) is required for any irrigation systems and must be installed by the Developer and/or eventual lot owner and tested in accordance with the Minnesota Department of Health Guidelines for Designing Backflow Prevention Assembly Installations (hereinafter referred to as “Guidelines”). The initial test results and certification shall be submitted to the City of Maple Grove Public Works Department. Subsequently, the RPZ must be tested, per the Guidelines, at least annually by a certified tester with the results reported to the City of Maple Grove Building Department and the RPZ must be rebuilt as needed in accordance with the Guidelines. Test/rebuilt reports shall be mailed or faxed to the City of Maple Grove Building Department at (▇▇▇) ▇▇▇-▇▇▇▇. The irrigation system shall be designed and the Plans shall be modified accordingly, prior to the issuance of any permits for the development of the Property, to accommodate a 1-inch water meter and a maximum flow of 50 gallons per minute.

  • Protection of Improvements So far as practicable, Purchaser shall protect Specified Roads and other improvements (such as roads, trails, telephone lines, ditches, and fences): (a) Existing in the operating area, (b) Determined to have a continuing need or use, and

  • Distribution System The Transmission Owner’s facilities and equipment used to transmit electricity to ultimate usage points such as homes and industries directly from nearby generators or from interchanges with higher voltage transmission networks which transport bulk power over longer distances. The voltage levels at which Distribution Systems operate differ among areas. Distribution Upgrades – The additions, modifications, and upgrades to the Transmission Owner’s Distribution System at or beyond the Point of Interconnection to facilitate interconnection of the Small Generating Facility and render the transmission service necessary to effect the Interconnection Customer’s wholesale sale of electricity in interstate commerce.

  • MAINTENANCE OF THE SAID BUILDING APARTMENT / PROJECT

  • Heating, Ventilation and Air Conditioning Landlord shall furnish to the Premises heating, ventilation and air-conditioning (“HVAC”) in accordance with the Design Standards set forth in Exhibit E during Ordinary Business Hours. Landlord shall have access to all air-cooling, fan, ventilating and machine rooms and electrical closets and all other mechanical installations of Landlord (collectively, “Mechanical Installations”), and Tenant shall not construct partitions or other obstructions which may interfere with Landlord’s access thereto or the moving of Landlord’s equipment to and from the Mechanical Installations. No Tenant Party shall at any time enter the Mechanical Installations or tamper with, adjust, or otherwise affect such Mechanical Installations. Landlord shall not be responsible if the HVAC System fails to provide cooled or heated air, as the case may be, to the Premises in accordance with the Design Standards by reason of (i) any equipment installed by, for or on behalf of Tenant, which has an electrical load in excess of the average electrical load and human occupancy factors for the HVAC System as designed, or (ii) any rearrangement of partitioning or other Alterations made or performed by, for or on behalf of Tenant. Tenant shall install, if missing, blinds or shades on all windows, which blinds and shades shall be subject to Landlord’s approval, and shall keep all of the operable windows in the Premises closed, and lower the blinds when necessary because of the sun’s position, whenever the HVAC System is in operation or as and when required by any Requirement. Tenant shall cooperate with Landlord and shall abide by the rules and regulations which Landlord may reasonably prescribe for the proper functioning and protection of the HVAC System.