Additional Callers Sample Clauses

Additional Callers. Additional telephone assistance callers can be purchased as desired at rates in Exhibit A. However, to be designated a telephone assistance caller; the name of each authorized caller must be identified and must have been trained in the same manner as the original System Manager. Persons assigned to a specific customer support ticket are not considered additional callers.

Related to Additional Callers

  • Additional CPV code(s 80000000 - Education and training services 80100000 - Primary education services 80110000 - Pre-school education services 80200000 - Secondary education services 80212000 - Vocational secondary education services 80310000 - Youth education services 80340000 - Special education services 85000000 - Health and social work services 85300000 - Social work and related services

  • ADDITIONAL COVERAGES We cover the following in addition to the limits of liability: A. Claim Expenses 1. Expenses we incur and costs taxed against an "insured" in any suit we defend;

  • Additional Coverage To the extent that insurance coverage provided by Consultant maintains higher limits than the minimums appearing in Exhibit B, City requires and shall be entitled to coverage for higher limits maintained.

  • Additional Conditions As a condition to any such assignment or subletting, whether or not Landlord’s consent is required, Landlord may require: (i) that any assignee or subtenant agree, in writing at the time of such assignment or subletting, that if Landlord gives such party notice that Tenant is in default under this Lease, such party shall thereafter make all payments otherwise due Tenant directly to Landlord, which payments will be received by Landlord without any liability except to credit such payment against those due under the Lease, and any such third party shall agree to attorn to Landlord or its successors and assigns should this Lease be terminated for any reason; provided, however, in no event shall Landlord or its successors or assigns be obligated to accept such attornment; and (ii) A list of Hazardous Materials, certified by the proposed assignee or sublessee to be true and correct, which the proposed assignee or sublessee intends to use, store, handle, treat, generate in or release or dispose of from the Premises, together with copies of all documents relating to such use, storage, handling, treatment, generation, release or disposal of Hazardous Materials by the proposed assignee or subtenant in the Premises or on the Project, prior to the proposed assignment or subletting, including, without limitation: permits; approvals; reports and correspondence; storage and management plans; plans relating to the installation of any storage tanks to be installed in or under the Project (provided, said installation of tanks shall only be permitted after Landlord has given its written consent to do so, which consent may be withheld in Landlord’s sole and absolute discretion); and all closure plans or any other documents required by any and all federal, state and local Governmental Authorities for any storage tanks installed in, on or under the Project for the closure of any such tanks. Neither Tenant nor any such proposed assignee or subtenant is required, however, to provide Landlord with any portion(s) of the such documents containing information of a proprietary nature which, in and of themselves, do not contain a reference to any Hazardous Materials or hazardous activities.

  • Review Periods Owner shall have up to ten (10) Business Days from its receipt of the documents listed in Sections 1.3 and 1.4 above, to issue to Contractor written comments on such documents, Drawings and Specifications. The Owner’s approval rights only apply to documents listed in Section 1.3. If comments are not received for items listed in Section 1.3 in ten (10) Business Days, the Contractor may proceed with the development of the Drawings and Specifications with the design reflected in the uncommented document. Owner will annotate the Drawings and Specifications as appropriate and return to Contractor. In the event that Owner disapproves the Drawings or Specifications, Owner shall provide Contractor with a written statement of the reasons for such rejection within the time period required for Owner’s response, and Contractor shall provide Owner with agreed to revised and corrected Drawings and Specifications as soon as possible thereafter.