Additional Drainage Clause Samples

Additional Drainage. No party to this Agreement will drain any additional drainage volume into the storm sewer facilities constructed under the construction contract that was not included in the drainage for which the storm sewer facilities were designed, without first obtaining written permission to do so from the other party.
Additional Drainage. No party to this Agreement will drain any additional drainage volume into the storm sewer facilities constructed under the design-build contract that was not included in the drainage for which the storm sewer facilities were designed, without first obtaining written permission to do so from the other party. The drainage areas served by the storm sewer facilities constructed under the design-build contract are shown in a drainage area map, Exhibit "Drainage Area", which is on file in the office of the State's District Hydraulics Unit at Roseville and is incorporated into this Agreement by reference.
Additional Drainage. VCTC hereby authorizes Developer to fill the Temporary Drainage Facilities upon completion by Developer of the Drainage Structures, as demonstrated by a document showing that a final inspection has been conducted and approved by either City or the County, and as authorized by CDFW in correspondence attached as Exhibit C. The right of Developer to fill the Temporary Drainage Facilities and the obligations of VCTC set forth in Section 20 shall continue in perpetuity, notwithstanding the termination of this Agreement, upon completion by Developer and approval by City or County of the permanent drainage culvert and provision by Developer to VCTC of the documentation described in the first sentence of this Section 3, Developer shall have the right to carry out the Work described in this Section 3 pursuant to the Construction Easement.

Related to Additional Drainage

  • Drainage ▪ Prevent silt bearing road surface and ditch runoff from delivering sediment to any streams or wetlands. ▪ Maintain rolling dips and drivable waterbars as needed to keep them functioning as intended. ▪ Maintain headwalls to the road shoulder level with material that will resist erosion. ▪ Maintain energy dissipaters at culvert outlets with non-erodible material or rock. ▪ Keep ditches, culverts, and other drainage structures clear of obstructions and functioning as intended. ▪ Inspect and clean culverts at least monthly, with additional inspections during storms and periods of high runoff. This shall be done even during periods of inactivity. ▪ Perform preventative maintenance work to safeguard against storm damage, such as blading to ensure correct runoff, ditch and culvert cleaning, and waterbar maintenance.

  • Additional Facilities If any structural additions or change in use shall be made to the buildings or other improvements included in the Project Facility subsequent to the date hereof (other than the initial construction of the Building contemplated by the Project), or if any additional buildings or improvements shall be constructed on the Land other than the Building (such change of use, new structures, structural additions, buildings and improvements being referred to hereinafter as “Additional Facilities”), the Obligor agrees that its PILOT Obligations hereunder shall be increased by an amount, as determined by the Agency or a tax assessor selected by the Agency, equal to the increased tax payments, if any, that would have been payable on such increase if this Agreement were not in effect. Nothing herein shall constitute the Agency’s consent to the construction of any such additions or additional buildings or improvements or to such change of use.

  • Unbundled Loop Modifications (Line Conditioning 2.5.1 Line Conditioning is defined as routine network modification that BellSouth regularly undertakes to provide xDSL services to its own customers. This may include the removal of any device, from a copper Loop or copper Subloop that may diminish the capability of the Loop or Subloop to deliver high-speed switched wireline telecommunications capability, including xDSL service. Such devices include, load coils, excessive bridged taps, low pass filters, and range extenders. Excessive bridged taps are bridged taps that serves no network design purpose and that are beyond the limits set according to industry standards and/or the BellSouth’s TR 73600 Unbundled Local Loop Technical Specification. 2.5.2 BellSouth will remove load coils only on copper Loops and Subloops that are less than eighteen thousand (18,000) feet in length. 2.5.3 For any copper loop being ordered by NewPhone which has over six thousand (6,000) feet of combined bridged tap will be modified, upon request from NewPhone, so that the loop will have a maximum of six thousand (6,000) feet of bridged tap. This modification will be performed at no additional charge to NewPhone. Loop conditioning orders that require the removal of bridged tap that serves no network design purpose on a copper Loop that will result in a combined total of bridged tap between two thousand five hundred (2,500) and six thousand (6,000) feet will be performed at the rates set forth in Exhibit A. 2.5.4 NewPhone may request removal of any unnecessary and non-excessive bridged tap (bridged tap between zero (0) and two thousand five hundred (2,500) feet which serves no network design purpose), at rates pursuant to BellSouth’s SC Process as mutually agreed to by the Parties. 2.5.5 Rates for ULM are as set forth in Exhibit A. 2.5.6 BellSouth will not modify a Loop in such a way that it no longer meets the technical parameters of the original Loop type (e.g., voice grade, ADSL, etc.) being ordered. 2.5.7 If NewPhone requests ULM on a reserved facility for a new Loop order, BellSouth may perform a pair change and provision a different Loop facility in lieu of the reserved facility with ULM if feasible. The Loop provisioned will meet or exceed specifications of the requested Loop facility as modified. NewPhone will not be charged for ULM if a different Loop is provisioned. For Loops that require a DLR or its equivalent, BellSouth will provide LMU detail of the Loop provisioned. 2.5.8 NewPhone shall request Loop make up information pursuant to this Attachment prior to submitting a service inquiry and/or a LSR for the Loop type that NewPhone desires BellSouth to condition. 2.5.9 When requesting ULM for a Loop that BellSouth has previously provisioned for NewPhone, NewPhone will submit a SI to BellSouth. If a spare Loop facility that meets the Loop modification specifications requested by NewPhone is available at the location for which the ULM was requested, NewPhone will have the option to change the Loop facility to the qualifying spare facility rather than to provide ULM. In the event that BellSouth changes the Loop facility in lieu of providing ULM, NewPhone will not be charged for ULM but will only be charged the service order charges for submitting an order.