Additional test Clause Samples

Additional test. 2.5.1. If the power-driven vehicle is equipped with one or more energy storage devices for auxiliary equipment having a total capacity exceeding 20 per cent of the total capacity of the braking energy storage devices, an additional test shall be performed during which no irregularity shall occur in the operation of the valves controlling the filling of the energy storage device(s) for auxiliary equipment. 2.5.2. It shall be verified during the aforesaid test that the time t3 necessary to raise the pressure from 0 to p2 in the least-favoured braking energy storage device is less than:
Additional test. 2.5.1. If the power-driven vehicle is equipped with one or more energy storage devices for auxiliary equipment having a total capacity exceeding 20 per cent of the total capacity of the braking energy storage devices, an additional test shall be performed during which no irregularity shall occur in the operation of the valves controlling the filling of the energy storage device(s) for auxiliary equipment. 2.5.2. It shall be verified during the aforesaid test that the time t3 necessary to raise the pressure from 0 to p2 in the least-favoured braking energy storage device is less than: 2.5.2.1. Eight minutes in the case of vehicles to which the coupling of a trailer is not authorized; or 2.5.2.2. Eleven minutes in the case of vehicles to which the coupling of a trailer is authorized. 2.5.3. The test shall be performed in the conditions prescribed in paragraphs 2.3.1. and 2.3.3. above.
Additional test. One detector of each type will be disconnected and subjected to slow dust build - up by means as desired by the Consultant/client and again connected in the circuit. Any part of the Loop shall be short circuited. The FACP shall indicate the communication failure of all the devices connected in the short circuited segment. After the short circuit is corrected, the Fault Isolator shall return to its normal status automatically, this being reflected in the FACP. The Loop shall then be in normal operation again. Any part of the Loop shall be de wired and tested as given above for open fault. All other tests as required by the client at the time of handing over shall also to be conducted
Additional test. 2.5.1. If the power-driven vehicle is equipped with one or more energy storage devices for auxiliary equipment having a total capacity exceeding 20 per cent of the total capacity of the braking energy storage devices, an additional test shall be performed during which no irregularity shall occur in the operation of the valves E/ECE/324 Rev.1/Add.12/Rev.4 Regulation No. 13 page 86 Annex 7 controlling the filling of the energy storage device(s) for auxiliary equipment. 2.5.2. It shall be verified during the aforesaid test that the time t3 necessary to raise the pressure from 0 to p2 in the least-favoured braking energy storage device is less than: 2.5.2.1. Eight minutes in the case of vehicles to which the coupling of a trailer is not authorized; or 2.5.2.2. Eleven minutes in the case of vehicles to which the coupling of a trailer is authorized. 2.5.3. The test shall be performed in the conditions prescribed in paragraphs 2.3.1. and 2.3.3. above.

Related to Additional test

  • Additional Terms & Conditions Acknowledged and Agreed:

  • Listing Period Extension The Commission shall be due if the Property is sold, conveyed, exchanged, optioned, or otherwise transferred within _ _ days (“Extension Period”) after the expiration of the Listing Period to anyone with whom the Broker or Agency has negotiated unless the Property is listed, in good faith, with another real estate agency. The term “negotiation” shall include providing information about the Property, showing the Property, or presenting an offer on the Property. All rights under this Section shall terminate upon the expiration of the Extension Period.

  • Acceptance Tests 11.1 If the Contract provides acceptance tests for Goods and/or the result of Services after their completion and/or delivery to the Purchaser, the acceptance shall only be considered as definitive when such tests have demonstrated the compliance of the Goods and/or the result of the Services to the requirements in the Contract. 11.2 Where the Contract provides for an acceptance procedure in the presence of both parties, at the successful completion of such procedure, the Purchaser shall issue the Supplier with an acceptance certificate which shall authorise the Supplier to invoice the Purchaser for any payment due on such acceptance. 11.3 The Purchaser shall at its discretion be entitled to issue and acceptancecertificate with reserves. The Supplier shall be obliged to remedy any non-conformities within the period set out in the acceptance certificate. Any payment which would otherwise have been due on acceptance may be withheld by the Purchaser in whole or part until the non- conformities underlying the reserves have been remedied.

  • Additional Compliance If any Proposed Key Holder Transfer is not consummated within forty-five (45) days after receipt of the Proposed Transfer Notice by the Company, the Key Holders proposing the Proposed Key Holder Transfer may not sell any Transfer Stock unless they first comply in full with each provision of this Section 2. The exercise or election not to exercise any right by any Investor hereunder shall not adversely affect its right to participate in any other sales of Transfer Stock subject to this Section 2.2.

  • Acceptance Criteria The Services and Deliverables must meet the following acceptance criteria or the JBE may reject the applicable Services or Deliverables. The JBE may use the attached Acceptance and Signoff Form to notify Contractor of the acceptance or rejection of the Services and Deliverables. Contractor will not be paid for any rejected Services or Deliverables.