Alternative 3 – Improve Levees and Deep Water Ship Channel Closure Structure Sample Clauses

Alternative 3 – Improve Levees and Deep Water Ship Channel Closure Structure. Alternative 3 would include all of the levee improvements discussed in Alternative 1, except that levee repairs on the Port north and Port south levees and portions of the DWSC east and west levees would be replaced by the construction of a closure structure in the DWSC, as shown on Plate 2-5. The levee improvement measures for Alternative 3 would be consistent with Alternative 1. The Sacramento River, Yolo Bypass, and South Cross levees would be improved to address identified seepage, slope stability, erosion, and height concerns. The adjacent levee would be constructed where there are fewer real estate constraints, the existing levee does not meets or exceed minimum levee standards, and/or vegetation and erosion are considerations. The levee remediation measures proposed under Alternative 3 are summarized in Table 3-5 below. Port North* Closure Structure Closure Structure Closure Structure Closure Structure South Basin Levee Reach Seepage Measures Stability Measures Overtopping Measures Erosion Protection Measures Sacramento River South Cutoff Wall, Seepage Berm Cutoff Wall --- Bank Protection South Cross Relief ▇▇▇▇▇ Stability Berm Levee Raise --- Deep Water Ship Channel East * Cutoff Wall Cutoff Wall Levee Raise --- Deep Water Ship Channel West* Cutoff Wall, Closure Structure Cutoff Wall, Closure Structure Levee Raise, Closure Structure Bank Protection Port South* Closure Structure Closure Structure Closure Structure Closure Structure * The entire levee reach does not need remediation, only specific sections. It is estimated that a maximum of 5 million cy of borrow material could be needed to construct the project. Construction of Alternative 3 is proposed to take approximately 17 years if each reach is constructed sequentially. The tentative schedule of construction is shown in Table 3-6. Sacramento River South Levee 4 years DWSC Closure Structure 3.5 years Sacramento Bypass Training Levee 1 year Sacramento River North Levee 2 years Yolo Bypass 1 year Deep Water Ship Channel West 2 year Port South No construction Deep Water Ship Channel East 1 year South Cross 2 year Port North No construction Table 3-7. Alternative 3 – Construction Lengths and Measures by North Basin Levee Reach Levee Reach Length of Reach (feet) Length of Measure (feet) Improvement Measure Sacramento River North Levee 30,700 30,000 Erosion Protection Bank Protection 11,000 Seepage 30 Foot Deep Slurry Wall 1,500 Seepage 80 Foot Deep Slurry Wall 500 Seepage 45 Foot Deep Slurry Wall 5,...

Related to Alternative 3 – Improve Levees and Deep Water Ship Channel Closure Structure

  • Completion of Concrete Pours and Emergency Work (a) Except as provided in this sub-clause an Employee shall nor work or be required to work in the rain. (b) Employees shall not be required to start a concrete pour in Inclement Weather. (c) Where a concrete pour has been commenced prior to the commencement of a period of Inclement Weather Employees may be required to complete such concrete pour to a practical stage and for such work shall be paid at the rate of double time calculated to the next hour, and in the case of wet weather shall be provided with adequate wet weather gear. (d) If an Employee’s clothes become wet as a result of working in the rain during a concrete pour the Employee shall, unless the Employee has a change of dry working clothes available, be allowed to go home without loss of pay. (e) The provisions of clauses 32.7(c) and 32.7(d) hereof shall also apply in the case of emergency work where the Employees concerned and their delegates agree that the work is of an emergency nature and can start and/or proceed.

  • Please see the current Washtenaw Community College catalog for up-to-date program requirements Conditions & Requirements

  • Framework Management Structure The Supplier shall provide a suitably qualified nominated contact (the “Supplier Framework Manager”) who will take overall responsibility for delivering the Goods and/or Services required within this Framework Agreement, as well as a suitably qualified deputy to act in their absence. The Supplier shall put in place a structure to manage the Framework in accordance with Framework Schedule 2 (Goods and/or Services and Key Performance Indicators). A full governance structure for the Framework will be agreed between the Parties during the Framework Agreement implementation stage. Following discussions between the Parties following the Framework Commencement Date, the Authority shall produce and issue to the Supplier a draft Supplier Action Plan. The Supplier shall not unreasonably withhold its agreement to the draft Supplier Action Plan. The Supplier Action Plan shall, unless the Authority otherwise Approves, be agreed between the Parties and come into effect within two weeks from receipt by the Supplier of the draft Supplier Action Plan. The Supplier Action Plan shall be maintained and updated on an ongoing basis by the Authority. Any changes to the Supplier Action Plan shall be notified by the Authority to the Supplier. The Supplier shall not unreasonably withhold its agreement to any changes to the Supplier Action Plan. Any such changes shall, unless the Authority otherwise Approves, be agreed between the Parties and come into effect within two weeks from receipt by the Supplier of the Authority’s notification. Regular performance review meetings will take place at the Authority’s premises throughout the Framework Period and thereafter until the Framework Expiry Date (“Supplier Review Meetings”). The exact timings and frequencies of such Supplier Review Meetings will be determined by the Authority following the conclusion of the Framework Agreement. It is anticipated that the frequency of the Supplier Review Meetings will be once every month or less. The Parties shall be flexible about the timings of these meetings. The purpose of the Supplier Review Meetings will be to review the Supplier’s performance under this Framework Agreement and, where applicable, the Supplier’s adherence to the Supplier Action Plan. The agenda for each Supplier Review Meeting shall be set by the Authority and communicated to the Supplier in advance of that meeting. The Supplier Review Meetings shall be attended, as a minimum, by the Authority Representative(s) and the Supplier Framework Manager.

  • Master Feeder Structure If permitted by the 1940 Act, the Board of Trustees, by vote of a majority of the Trustees, and without a Shareholder vote, may cause the Trust or any one or more Series to convert to a master feeder structure (a structure in which a feeder fund invests all of its assets in a master fund, rather than making investments in securities directly) and thereby cause existing Series of the Trust to either become feeders in a master fund, or to become master funds in which other funds are feeders.

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.