Amendment to Connection Point data Sample Clauses

Amendment to Connection Point data. (a) Unless the Parties otherwise agree, Western Power must, as soon as reasonably practicable, record the information referred to in Part 1 of Schedule 3, with respect to each Connection Point, in the Connection Point Database. (b) Subject to clauses 3.7(g) and 3.7(h), Western Power must, as soon as reasonably practicable, update the information contained in a Connection Point Database following any variation made under this clause 3. (c) Upon request by the User for information referred to in the Connection Point Database, Western Power will, as soon as reasonably practicable, provide to the User the most up‐to‐ date version of that information. (d) The Parties acknowledge that if the User is a Metering Code Participant, for each Connection Point Western Power must also record and update the relevant information required under Part 1 of Schedule 3 in the Metering Database in accordance with the provisions of the Metering Code and, to the extent that a timeframe is not specified in the Metering Code or a service level agreement in force between the User and Western Power, Western Power must do so as soon as is reasonably practicable. (e) Nothing in this Contract restricts or prohibits Western Power from maintaining and updating the Metering Database in accordance with the Metering Code. (f) Western Power will provide the User with access to the information in the Metering Database in accordance with the Build Pack. (g) Subject to clause 3.7(h), where Western Power causes a Permanent Reconfiguration of the Network which results in the information contained in the Contract Database having to be updated: (i) Western Power is not required to update the information contained in the Connection Point Database before the next 1 July following the Permanent Reconfiguration of the Network; and (ii) Western Power must update the information contained in the Connection Point Database before the next 21 July following the Permanent Reconfiguration of the Network. (h) Where a Permanent Reconfiguration of the Network occurs as a result of, or arising from, a notice or application by the User under clauses 3.4, 3.5 or 3.6 which results in the information contained in the Contract Database having to be updated: (i) clause 3.7(g) does not apply; (ii) Western Power must update the information contained in the Connection Point Database as soon as reasonably practicable after the Permanent Reconfiguration of the Network; and (iii) where the information to be updated is contain...
Amendment to Connection Point data. Unless the Parties otherwise agree, where information is referred to in Part 1 of Schedule 3, Horizon Power Pilbara Network must, as soon as reasonably practicable after the Commencement Date, record as much of that information with respect to each Connection Point as it is reasonably able to in an electronic database. For the avoidance of doubt, the electronic database referred to in this clause 4.7(a) will form part of the Connection Point Database. Subject to clauses 4.7(h) and 4.7(i), Horizon Power Pilbara Network must, as soon as reasonably practicable, update the information contained in the Connection Point Database following any variation made under this clause 4. Where, under this Contract, the Connection Point Database consists of Part 1 of Schedule 3 (either partially or wholly), the User acknowledges and agrees that Horizon Power Pilbara Network may, following any: (1) variation made under this clause 4; or (2) requirement under this clause 4 to update the Connection Point Database, update the information contained in Part 1 of Schedule 3 by written notice to the User. Upon request by the User for information referred to in the Connection Point Database, Horizon Power Pilbara Network will, as soon as reasonably practicable, provide to the User the most up-to-date version of that information. The Parties acknowledge that if the User is a Metering Code Participant, for each Connection Point Horizon Power Pilbara Network must record and update as much of the information required under Part 1 of Schedule 3 as it is reasonably able to in the Metering Database in accordance with the provisions of the Metering Code and, to the extent that a timeframe is not specified in the Metering Code or the Model Service Level Agreement in force between the User and Horizon Power Pilbara Network, Horizon Power Pilbara Network must do so as soon as is reasonably practicable. Nothing in this Contract restricts or prohibits Horizon Power Pilbara Network from maintaining and updating the Metering Database in accordance with the Metering Code. Horizon Power Pilbara Network will provide the User with access to the information in the Metering Database relating to each Connection Point in accordance with the Communication Rules and the Metering Code. Subject to clause 4.7(i), where Horizon Power Pilbara Network causes a Permanent Reconfiguration of the Network which results in the information contained in the Connection Point Database having to be updated, Horizon Power P...
Amendment to Connection Point data. Formatted: Bullets and Numbering Formatted: Level (a)-numbered clause, No bullets or numbering, Don't keep lines together (a) Unless the Parties* otherwise agree, Western Power must record the information referred to in Part 1 of Schedule 3, with respect to each Connection Point*, in the Connection Point Database*. (a) (b) Subject to clauses 3.7(g) and 3.7(h), Western Power* must update the information contained in a Connection Point Database* following any variation made under this clause 3. (c) Upon request by the User* for information referred to in the Connection Point Database*, Western Power* will provide to the User* the most up-to-date version of that information.
Amendment to Connection Point data. Unless the Parties otherwise agree, the Microgrid Operator must, as soon as reasonably practicable, record the information referred to in Part 1 of Schedule 2, with respect to each Connection Point, in the Connection Point Database.
Amendment to Connection Point data. Unless the Parties* otherwise agree, Western Power must record the information referred to in Part 1 of Schedule 3, with respect to each Connection Point*, in the Connection Point Database*.

Related to Amendment to Connection Point data

  • Interconnection Agreement Seller shall comply with the terms and conditions of the Interconnection Agreement.

  • Nyiso and Connecting Transmission Owner Authority General.‌‌ NYISO or Connecting Transmission Owner may take whatever actions with regard to the New York State Transmission System or the Connecting Transmission Owner’s Attachment Facilities it deems necessary during an Emergency State in order to (i) preserve public health and safety, (ii) preserve the reliability of the New York State Transmission System or the Connecting Transmission Owner’s Attachment Facilities, (iii) limit or prevent damage, and (iv) expedite restoration of service. NYISO and Connecting Transmission Owner shall use Reasonable Efforts to minimize the effect of such actions or inactions on the Large Generating Facility or the Developer’s Attachment Facilities. NYISO or Connecting Transmission Owner may, on the basis of technical considerations, require the Large Generating Facility to mitigate an Emergency State by taking actions necessary and limited in scope to remedy the Emergency State, including, but not limited to, directing Developer to shut-down, start-up, increase or decrease the real or reactive power output of the Large Generating Facility; implementing a reduction or disconnection pursuant to Article 13.4.2; directing the Developer to assist with blackstart (if available) or restoration efforts; or altering the outage schedules of the Large Generating Facility and the Developer’s Attachment Facilities. Developer shall comply with all of the NYISO and Connecting Transmission Owner’s operating instructions concerning Large Generating Facility real power and reactive power output within the manufacturer’s design limitations of the Large Generating Facility’s equipment that is in service and physically available for operation at the time, in compliance with Applicable Laws and Regulations.

  • Interconnection Customer Provided Services The services provided by Interconnection Customer under this LGIA are set forth in Article 9.6 and Article 13.5. 1. Interconnection Customer shall be paid for such services in accordance with Article 11.6.

  • Capacity Interconnection Rights Pursuant to and subject to the applicable terms of the Tariff, the Interconnection Customer shall have Capacity Interconnection Rights at the Point(s) of Interconnection specified in this Interconnection Service Agreement in the amount of 33.6

  • NYISO and Connecting Transmission Owner Obligations Connecting Transmission Owner and NYISO shall cause the New York State Transmission System and the Connecting Transmission Owner’s Attachment Facilities to be operated, maintained and controlled in a safe and reliable manner in accordance with this Agreement and the NYISO Tariffs. Connecting Transmission Owner and NYISO may provide operating instructions to Developer consistent with this Agreement, NYISO procedures and Connecting Transmission Owner’s operating protocols and procedures as they may change from time to time. Connecting Transmission Owner and NYISO will consider changes to their respective operating protocols and procedures proposed by Developer.