Approval of Change Orders. Developer shall not be required to obtain Authority Executive Director approval of any change orders or other revisions or modifications to the Construction Drawings, so long as each change order, revision, or modification is consistent with the approved Basic Concept Drawings does not cause any value engineering not previously authorized by Authority and does not affect materially the design, materials, and architectural quality and integrity of Phase I, except that Developer shall be required to obtain Authority Executive Director approval to the extent such change order, revision, or modification will result in a cost adjustment which, cumulatively with all other change orders, revisions, and modifications, exceeds the amount set forth as the contingency line item in the approved Final Budget for Phase I. Notwithstanding the immediately preceding sentence, Authority shall have the right to review any and all material changes, revisions or modifications to the Construction Drawings and/or any and all material change orders to the Construction Contract with the General Contractor which are approved by Developer.
Appears in 1 contract
Sources: Affordable Housing Agreement
Approval of Change Orders. Developer shall not be required to obtain Authority Executive Director approval of any change orders or other revisions or modifications to the Construction Drawings, so long as each change order, revision, or modification is consistent with the approved Basic Concept Drawings does not cause any value engineering not previously authorized by Authority and does not affect materially the design, materials, and architectural quality and integrity of Phase III, except that Developer shall be required to obtain Authority Executive Director approval to the extent such change order, revision, or modification will result in a cost adjustment which, cumulatively with all other change orders, revisions, and modifications, exceeds the amount set forth as the contingency line item in the approved Final Budget for Phase I. II. Notwithstanding the immediately preceding sentence, Authority shall have the right to review any and all material changes, revisions or modifications to the Construction Drawings and/or any and all material change orders to the Construction Contract with the General Contractor which are approved by Developer.
Appears in 1 contract
Sources: Affordable Housing Agreement