APS Control Surface and Pole Placement Sample Clauses

APS Control Surface and Pole Placement. 2.3.1. Where two or more APS serving two or more crosswalks are installed on a single street corner or other pedestrian crossing location, they shall be installed such that the APS Control Surfaces and associated speakers are separated by a horizontal distance of at least 10 feet unless it is structurally impracticable or technically infeasible to do so. If the City believes that the APS Control Surfaces and associated speakers cannot be placed ten feet apart because of structural impracticability or technical infeasibility, it shall provide Claimants with the factual basis for the City’s position in writing, including the identity of the intersection where the poles are located. The City shall also inform Claimants whether the APS will be installed on a single pole or on two poles separated by less than 10 feet (and, if the latter, the distance between the two APS Control Surfaces and the distance between the associated speakers). The City shall also inform Claimants of the means by which it will ensure that these APS provide unambiguous information regarding which crosswalk is in the Walk Interval, including the Speech Message(s) to be used, if any. The APS pushbutton shall be located approximately 42 inches above the adjacent walking surface. 2.3.2. All APS Control Surfaces shall be placed so that the Control Surface is within five feet of the extended crosswalk lines, and not more than 10 feet from the edge of the curb unless the curb ramp is longer than 10 feet. The Control Surface of the Accessible Pedestrian Signals shall be oriented to be parallel to the crosswalk to be used. In addition, the poles on which Accessible Pedestrian Signals are placed in new or altered Intersections where new poles are installed, where feasible shall be located 10 inches or less to a level, firm, stable, slip-resistant, all-weather surface no less than 36 inches by 48 inches and on an accessible route to the curb ramp. (All dimensions are horizontally measured.)
APS Control Surface and Pole Placement. 2.3.1. Where two or more APS serving two or more crosswalks are 2.3.2. All APS Control Surfaces shall be placed so that the Control

Related to APS Control Surface and Pole Placement

  • ADDITIONAL SPECIAL CONTRACT CONDITIONS Special Contract Conditions revisions: the corresponding subsections of the Special Contract Conditions referenced below are replaced in their entirety with the following:

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • Provisioning Line Splitting and Splitter Space 3.8.1 The Data LEC, Voice CLEC or BellSouth may provide the splitter. When Utility USA or its authorized agent owns the splitter, Line Splitting requires the following: a non-designed analog Loop from the serving wire center to the NID at the End User’s location; a collocation cross connection connecting the Loop to the collocation space; a second collocation cross connection from the collocation space connected to a voice port; the high frequency spectrum line activation, and a splitter. The Loop and port cannot be a Loop and port combination (i.e. UNE-P), but must be individual stand-alone Network Elements. When BellSouth owns the splitter, Line Splitting requires the following: a non designed analog Loop from the serving wire center to the NID at the End User’s location with CFA and splitter port assignments, and a collocation cross connection from the collocation space connected to a voice port. 3.8.2 An unloaded 2-wire copper Loop must serve the End User. The meet point for the Voice CLEC and the Data LEC is the point of termination on the MDF for the Data LEC's cable and pairs. 3.8.3 The foregoing procedures are applicable to migration to Line Splitting Service from a UNE-P arrangement, BellSouth Retail Voice Service, BellSouth High Frequency Spectrum (CO Based) Line Sharing. 3.8.4 For other migration scenarios to line splitting, BellSouth will work cooperatively with CLECs to develop methods and procedures to develop a process whereby a Voice CLEC and a Data LEC may provide services over the same Loop.

  • Heating, Ventilating and Air Conditioning General Office Area: The building shall be equipped with a combination heating, ventilation and air conditioning system. The system shall have ducted supply and return air. The space above the ceiling shall not be used as a supply or return plenum. The systems shall be sized in accordance with the

  • Heating, Ventilation and Air Conditioning Landlord shall furnish to the Premises heating, ventilation and air-conditioning (“HVAC”) in accordance with the Design Standards set forth in Exhibit E during Ordinary Business Hours. Landlord shall have access to all air-cooling, fan, ventilating and machine rooms and electrical closets and all other mechanical installations of Landlord (collectively, “Mechanical Installations”), and Tenant shall not construct partitions or other obstructions which may interfere with Landlord’s access thereto or the moving of Landlord’s equipment to and from the Mechanical Installations. No Tenant Party shall at any time enter the Mechanical Installations or tamper with, adjust, or otherwise affect such Mechanical Installations. Landlord shall not be responsible if the HVAC System fails to provide cooled or heated air, as the case may be, to the Premises in accordance with the Design Standards by reason of (i) any equipment installed by, for or on behalf of Tenant, which has an electrical load in excess of the average electrical load and human occupancy factors for the HVAC System as designed, or (ii) any rearrangement of partitioning or other Alterations made or performed by, for or on behalf of Tenant. Tenant shall install, if missing, blinds or shades on all windows, which blinds and shades shall be subject to Landlord’s approval, and shall keep all of the operable windows in the Premises closed, and lower the blinds when necessary because of the sun’s position, whenever the HVAC System is in operation or as and when required by any Requirement. Tenant shall cooperate with Landlord and shall abide by the rules and regulations which Landlord may reasonably prescribe for the proper functioning and protection of the HVAC System.