ARCHITECTURAL CONTROL. No building or other improvements of any character shall be erected, placed or altered on any lot until two (2) copies of the building plans and specifications and a site plan showing the location of the structure or structures shall have been submitted to and approved by the Architectural Control Committee as hereinafter provided for, as to compliance with these Restrictive Covenants and as to use, quality of workmanship and materials, harmony or exterior design with existing structures, and location with respect to topography and grade elevation. No fence or walls shall be erected, placed or altered on any lot nearer to the street than the minimum building setback line unless similarly approved. Approval shall be as provided in this Paragraph 27 hereof. The term “improvements” as used herein shall include, but not be limited to, any structure, the addition or alteration to any structure, including the dwelling storage buildings, tool sheds, greenhouses and/or other buildings. The plans and specifications and site plan herein provided to be submitted to the Architectural Control Committee shall be submitted for approval not less than fourteen (14) days prior to the commencement of construction or alteration of any such improvements. All construction shall be in accordance with the approved plans and specifications. The Architectural Control Committee shall retain one copy of the said building plans and specifications and the site plan until such time as the said Committee ceases to exist as provided for in this paragraph, and if approved, said Committee shall mail a letter of approval to the owner of the lot. In the event said Architectural Control Committee fails to approve or disapprove such plans within fourteen
Appears in 1 contract
Sources: Restrictive Covenants
ARCHITECTURAL CONTROL. No building or other improvements of any character shall be erected, placed or altered on any lot until two (2) copies of the building plans and specifications and a site plan showing the location of the structure or structures shall have been submitted to and approved by the Architectural Control Committee as hereinafter provided for, as to compliance with these Restrictive Covenants and as to use, quality of workmanship and materials, harmony or exterior design with existing structures, and location with respect to topography and grade elevation. No fence or walls shall be erected, placed or altered on any lot nearer to the street than the minimum building setback line unless similarly approved. Approval shall be as provided in this Paragraph 27 hereof. The term “improvements” as used herein shall include, but not be limited to, any structure, the addition or alteration to any structure, including the dwelling storage buildings, tool sheds, greenhouses and/or other buildings. The plans and specifications and site plan herein provided to be submitted to the Architectural Control Committee shall be submitted for approval not less than fourteen (14) days prior to the commencement of construction or alteration of any such improvements. All construction shall be in accordance with the approved plans and specifications. The Architectural Control Committee shall retain one copy of the said building plans and specifications and the site plan until such time as the said Committee ceases to exist as provided for in this paragraph, and if approved, said Committee shall mail a letter of approval to the owner of the lot. In the event said Architectural Control Committee fails to approve or disapprove such plans within fourteen
Appears in 1 contract
Sources: Restrictive Covenants