Area Delivery Network Upgrades Clause Samples

Area Delivery Network Upgrades. The Interconnection Customer shall not be entitled to repayment of the amount paid to the Distribution Provider for the costs of Area Delivery Network Upgrades. However, the Interconnection Customer may be entitled to receive Congestion Revenue Rights from the ISO in accordance with the ISO Tariff for the costs of Area Delivery Network Upgrades that are not covered by cash repayment.
Area Delivery Network Upgrades. If the Interconnection Customer has an Option (A) Generating Facility, the Interconnection Customer will not be responsible for funding the costs of any Area Delivery Network Upgrades. If the Interconnection Customer has an Option (B) Generating Facility and did not select the Merchant Option for the Area Delivery Network Upgrades, then the Interconnection Customer shall be responsible for funding the costs of Area Delivery Network Upgrades. The costs set forth in Appendices A and G are advisory estimates only and will not establish any cap or maximum cost responsibility limit on the cost responsibility of the Interconnection Customer for Area Delivery Network Upgrades. The Interconnection Customer shall be responsible for the actual costs of Area Delivery Network Upgrades. The Interconnection Customer will not be entitled to repayment for the costs it funded for Area Delivery Network Upgrades in accordance with Article 11.4.1.
Area Delivery Network Upgrades. None identified in the Phase II Interconnection Study.
Area Delivery Network Upgrades. If the Interconnection Customer has an Option (A) Generating Facility, the Interconnection Customer will not be
Area Delivery Network Upgrades. Because the Project elected to proceed under Option A, no Area Delivery Network Upgrades were identified for the Project in the Phase II Interconnection Study.
Area Delivery Network Upgrades. The Interconnection Customer shall not be entitled to repayment of the amount paid to the Distribution Provider for

Related to Area Delivery Network Upgrades

  • Network Upgrades The Transmission Owner shall design, procure, construct, install, and own the Network Upgrades described in Attachment 6 of this Agreement. If the Transmission Owner and the Interconnection Customer agree, the Interconnection Customer may construct Network Upgrades that are located on land owned by the Interconnection Customer. Unless the Transmission Owner elects to pay for Network Upgrades, the actual cost of the Network Upgrades, including overheads, shall be borne initially by the Interconnection Customer.

  • Network Interconnection Architecture Each Party will plan, design, construct and maintain the facilities within their respective systems as are necessary and proper for the provision of traffic covered by this Agreement. These facilities include but are not limited to, a sufficient number of trunks to the point of interconnection with the tandem company, and sufficient interoffice and interexchange facilities and trunks between its own central offices to adequately handle traffic between all central offices within the service areas at a P.01 grade of service or better. The provisioning and engineering of such services and facilities will comply with generally accepted industry methods and practices, and will observe the rules and regulations of the lawfully established tariffs applicable to the services provided.

  • System Upgrade Facilities and System Deliverability Upgrades Connecting Transmission Owner shall design, procure, construct, install, and own the System Upgrade Facilities and System Deliverability Upgrades described in Appendix A hereto. The responsibility of the Developer for costs related to System Upgrade Facilities and System Deliverability Upgrades shall be determined in accordance with the provisions of Attachment S to the ISO OATT.

  • Network Interconnection Methods 3.1 The Interconnection provided herein may not be used solely for the purpose of originating a Party’s own interexchange traffic.

  • System Upgrades The Connecting Transmission Owner shall procure, construct, install, and own the System Upgrade Facilities and System Deliverability Upgrades described in Attachment 6 of this Agreement. To the extent that design work is necessary in addition to that already accomplished in the Class Year Interconnection Facilities Study for the Interconnection Customer, the Connecting Transmission Owner shall perform or cause to be performed such work. If all the Parties agree, the Interconnection Customer may construct System Upgrade Facilities and System Deliverability Upgrades. 5.2.1 As described in Section 32.3.5.3 of the SGIP in Attachment Z of the ISO OATT, the responsibility of the Interconnection Customer for the cost of the System Upgrade Facilities and System Deliverability Upgrades described in Attachment 6 of this Agreement shall be determined in accordance with Attachment S of the ISO OATT, as required by Section 32.3.5.3.2