Asphalt Sample Clauses

Asphalt. TS-355 Asphalt roofing and tanking shall be executed by an approved specialist using mastic asphalt to BS 988. TS-356 The asphalt shall be applied in the thickness and number of coats described in the in BOQ, with each successive coat breaking joints at least 300mm (12") and with properly formed angles, double angle fillets and fair edges. TS-357 Joints of blockwork shall be raked out and all vertical surfaces hacked for key.
Asphalt. Asphalt will be sampled in accordance with ASTM D 140 (Standard Practice of Sampling Bituminous Materials).
Asphalt brown silty sand - trace to with gravel Loose to compact reddish brown silty sand - trace gravel - trace organics Compact to dense reddish brown silty sand TILL - trace to with gravel SS 1 SS 2 SS 3 SS 4 SS 5 SS 6 SS 7 SS 8 SS 9 SS 10 SS 11 SS 12 SS 13 400 550 575 450 550 300 600 350 300 250 250 300 200 13 S 12-14-13- 13 E* (26) S S 10 20 30 40 50 60 70 80 Miniature Vane Penetrometer Field Vane Torvane UU Triaxial Unconfined Compression CLIENT: ▇▇▇▇▇▇ ▇▇▇▇▇▇ ISLAND TRANSPORTATION, INFRASTRUCTURE & ENERGY LOCATION: MCCANNEL ROAD BRIDGE (Q3-039), ROUTE 255, QUEENS CO., PE PROJECT No.: 173134 DATUM: GEODETIC DATES: BORING 2017-12-14 TO 2017-12-15 WATER LEVEL: - BH SIZE: HW/HQ ELEVATION (m) REC. SOIL (mm) BLOWS / 150 mm (N VALUE) UNDRAINED SHEAR STRENGTH - kPa DEPTH (m) 20 40 60 80 SOIL/BEDROCK DESCRIPTION W W W NUMBER OTHER TESTS P L WATER CONTENT & ATTERBERG LIMITS DYNAMIC PENETRATION TEST, BLOWS/0.3m STANDARD PENETRATION TEST, BLOWS/0.3m HARBOURSIDE GEOTECHNICAL CONSULTANTS, BOREHOLE RECORD 18-1-9 Compact to dense reddish brown silty sand TILL - trace to with gravel
Asphalt. CONCRETE a) Full-time inspection to evaluate compliance with the improvement plans of record, details, specifications, the SSPWC, and this chapter. b) Inspection at the plant may be required by the RTC Administrator or the EOR to monitor oil content, aggregate grading, mineral filler content and temperature.
Asphalt a. No changes to any existing asphalt pavement are proposed, except such cutting, removal and repair as may be necessary for the installation of the new recessed truck well at the SW corner of the building.
Asphalt. FILL: Reddish ▇▇▇▇▇ silty sand - trace to with gravel Very loose to loose reddish ▇▇▇▇▇ silty SAND with gravel - trace to some wood fibers Compact reddish ▇▇▇▇▇ silty sand with gravel: TILL - trace clay End of Borehole SS 1 SS 2 SS 3 SS 4 SS 5 SS 6 SS 7 SS 8 75 450 500 450 150 25 50 500
Asphalt. Provide Asphalt materials that comply with DIVISION 1200.
Asphalt. 9.1. Substantial completion of this project may occur outside of the paving window. Therefore, the contractor will complete paving operations once the asphalt plants open. The City project manager will issue a Stop Work Order until the asphalt plant is opened. Once the asphalt plant is opened, the City project manager will then issue a Resume Work Order and a time extension will be given. The contractor will then apply the final pavement surface course and request final acceptance. Payment for the associated paving items will not be paid until final acceptance is issued by the City project manager. The Contractor will not be reimbursed for remobilization due to the asphalt plant being closed.
Asphalt. Tenant acknowledges that the asphalt surface applied at the Facility is of high quality and repairs thereto are very costly. ▇▇▇▇▇▇ agrees to so advise the Participants, and will monitor and control all activities which may result in damage to asphalt surfaces. Tenant will further take such reasonable steps as are necessary to protect and maintain these asphalt surfaces. Such steps may include requiring Participants: to place flat boards under jack stands in order to spread loads, especially during high temperature conditions; to refrain from driving pegs such as those retaining tents and awnings into asphalt surfaces; and ensuring prompt clean- up of all gas, oil, hydraulic, brake, and other fluids. Tenant will pay the Company an amount equal to $100.00 per square foot for all asphalt damage sustained during the Event.
Asphalt full-depth asphalt paving in the automobile parking stalls south of the north building line.