Availability Control Personal Data will be protected against accidental or unauthorized destruction or loss.
Interim Measures 6.1 The Parties acknowledge that the British Columbia Claims Task Force made the following recommendation concerning Interim Measures:
Majority Control Except as expressly provided herein, any action that may be taken by the Certificateholders under this Trust Agreement may be taken by the Holders of Certificates evidencing not less than a majority Percentage Interest of the Certificates. Except as expressly provided herein, any written notice of the Certificateholders delivered pursuant to this Trust Agreement shall be effective if signed by Holders of Certificates evidencing not less than a majority Percentage Interest of the Certificates at the time of the delivery of such notice.
EVENTS OUTSIDE OUR CONTROL 10.1 We will not be liable or responsible for any failure to perform, or delay in performance of, any of our obligations under this ▇▇▇▇ that is caused by any act or event beyond our reasonable control, including failure of public or private telecommunications networks (Event Outside Our Control). 10.2 If an Event Outside Our Control takes place that affects the performance of our obligations under this ▇▇▇▇: (a) our obligations under this ▇▇▇▇ will be suspended and the time for performance of our obligations will be extended for the duration of the Event Outside Our Control; and (b) we will use our reasonable endeavours to find a solution by which our obligations under this ▇▇▇▇ may be performed despite the Event Outside Our Control.
Quality control system (i) The Contractor shall establish a quality control mechanism to ensure compliance with the provisions of this Agreement (the “Quality Assurance Plan” or “QAP”). (ii) The Contractor shall, within 30 (thirty) days of the Appointed Date, submit to the Authority’s Engineer its Quality Assurance Plan which shall include the following: (a) organisation, duties and responsibilities, procedures, inspections and documentation; (b) quality control mechanism including sampling and testing of Materials, test frequencies, standards, acceptance criteria, testing facilities, reporting, recording and interpretation of test results, approvals, check list for site activities, and proforma for testing and calibration in accordance with the Specifications for Road and Bridge Works issued by MORTH, relevant IRC specifications and Good Industry Practice; and (c) internal quality audit system. The Authority’s Engineer shall convey its approval to the Contractor within a period of 21 (twenty-one) days of receipt of the QAP stating the modifications, if any, required, and the Contractor shall incorporate those in the QAP to the extent required for conforming with the provisions of this Clause 11.2. (iii) The Contractor shall procure all documents, apparatus and instruments, fuel, consumables, water, electricity, labour, Materials, samples, and qualified personnel as are necessary for examining and testing the Project Assets and workmanship in accordance with the Quality Assurance Plan. (iv) The cost of testing of Construction, Materials and workmanship under this Article 11 shall be borne by the Contractor.