Bad Calibrations Sample Clauses

Bad Calibrations. If the DeltaE Tracking graph shows a bad calibration (DeltaE value of four or greater any place in the graph), it is probably from a bad dark current calibration. Repeat calibration with the sensor in the darkest possible location (covered with an opaque cloth or material, if possible) during the Measure Dark Current step. The following specifications refer to measurement of a CRT display with EBU or P22 phosphor set at D6500 and a luminance of 90 candela/m2 when compared to measurement by a PhotoResearch-650 spectrophotometer: Accuracy Chrominance Luminance x, y: +/- .002 Y: +/- 2% Repeatability (same instrument, same patch) x, y: +/- .001 Y: +/- .5% Repeatability x, y: +/- .002 (inter-instrument) Y: +/- 2% Screen Refresh 30hz-120hz Measurement speed {three channels (R,G,B)} 200 ms This license agreement(“License”) is a legal agreement between you and NEC-Mitsubishi Electronics Display of America, Inc.(hereinafter “NMD-A”) granting you certain rights to access and use the software contained in this envelope. YOU HEREBY AGREE, BOTH ON YOUR OWN BEHALF AND AS AN AUTHORIZED REPRESENTATIVE OF ANY ORGANIZATION FOR WHICH YOU ARE USING THE SOFTWARE (“EMPLOYER”), THAT YOU AND YOUR EM- PLOYER WILL USE THE SOFTWARE ONLY IN ACCORDANCE WITH THE FOLLOWING TERMS:

Related to Bad Calibrations

  • Calibration The comparison of a measurement system or device of unverified accuracy with a measurement system of known and greater accuracy to detect deviation of the unverified measurement system from required performance specifications (of the unverified measurement system or device) and to quantify all measured values to applicable units of the international system of units.

  • Outputs Analogue and digital outputs of protected content are allowed if they meet the requirements in this section and if they are not forbidden elsewhere in this Agreement..

  • System Upgrades The Connecting Transmission Owner shall procure, construct, install, and own the System Upgrade Facilities and System Deliverability Upgrades described in Attachment 6 of this Agreement. To the extent that design work is necessary in addition to that already accomplished in the Class Year Interconnection Facilities Study for the Interconnection Customer, the Connecting Transmission Owner shall perform or cause to be performed such work. If all the Parties agree, the Interconnection Customer may construct System Upgrade Facilities and System Deliverability Upgrades. 5.2.1 As described in Section 32.3.5.3 of the SGIP in Attachment Z of the ISO OATT, the responsibility of the Interconnection Customer for the cost of the System Upgrade Facilities and System Deliverability Upgrades described in Attachment 6 of this Agreement shall be determined in accordance with Attachment S of the ISO OATT, as required by Section 32.3.5.3.2

  • Technical Specifications The purpose of the Technical Specifications (TS), is to define the technical characteristics of the Goods and Related Services required by the Procuring Entity. The Procuring Entity shall prepare the detailed TS consider that:

  • Tests 7.7.1 If the Contract Documents, laws, ordinances, rules, regulations or orders of any public authority having jurisdiction require any portion of the Work to be inspected, tested or approved, the Contractor shall give the Architect timely notice of its readiness so the Architect may observe such inspection, testing or approval. The Contractor shall bear all costs of such inspections, tests or approvals conducted by public authorities. 7.7.2 If the Architect determines that any Work requires special inspection, testing, or approval which Subparagraph 7.7.1 does not include, he or she will, upon written authorization from the State, instruct the Contractor to order such special inspection, testing or approval, and the Contractor shall give notice as provided in Subparagraph 7.7.1. If such special inspection or testing reveals a failure of the Work to comply with the requirements of the Contract Documents, the Contractor shall bear all costs thereof, including compensation for the Architect's additional services made necessary by such failure; otherwise the State shall bear such costs, and an appropriate Change Order shall be issued. 7.7.3 Required certificates of inspection, testing or approval shall be secured by the Contractor and promptly delivered by him to the Architect. 7.7.4 If the Architect is to observe inspections, tests or approvals required by the Contract Documents, he will do so promptly.