Bag-in-Box Line Specifications Sample Clauses

Bag-in-Box Line Specifications. The parties agree that the Bag-in-Box System has been installed and includes: (i) a new Bepex/SSOE processing system, substantially similar to the processing systems currently in place on Lines 1 through 4 at the Toledo Plant; (ii) two twin filler/baggers manufactured by Rovema USA; and (iii) a pouch recycling system consistent with the existing pouch recycling systems currently operating on Lines 1 through 4 at the Toledo Plant (the new line that includes the Bag-in-Box System shall be hereinafter referred to as the “Turbo Line”). General ▇▇▇▇▇ will cancel, or cause to be cancelled, any existing purchase or work orders relating to the purchase and/or installation of the ▇▇▇▇▇ model PK 4000 “Pouch King” filler/bagger and associated equipment to have been provided by ▇. ▇. ▇▇▇▇▇ & Company, Inc. and the processing system to have been provided by AZO, Inc. General ▇▇▇▇▇ has caused the Turbo Line to be built to leave space for the addition of a side-seam gluer by Buyer upon or after the Conversion Date and Buyer will be solely responsible for purchasing and, after the Conversion Date, installing, at its own cost and expense (collectively, the “Side Seam Costs and Expenses”) and at its sole discretion, a side-seam gluer for the Turbo Line.”

Related to Bag-in-Box Line Specifications

  • DAF Specifications Developer shall submit initial specifications for the DAF, including System Protection Facilities, to Connecting Transmission Owner and NYISO at least one hundred eighty (180) Calendar Days prior to the Initial Synchronization Date; and final specifications for review and comment at least ninety (90) Calendar Days prior to the Initial Synchronization Date. Connecting Transmission Owner and NYISO shall review such specifications to ensure that the DAF are compatible with the technical specifications, operational control, and safety requirements of the Connecting Transmission Owner and NYISO and comment on such specifications within thirty (30) Calendar Days of Developer’s submission. All specifications provided hereunder shall be deemed to be Confidential Information.

  • Technical Specifications The purpose of the Technical Specifications (TS), is to define the technical characteristics of the Goods and Related Services required by the Procuring Entity. The Procuring Entity shall prepare the detailed TS consider that:

  • ODUF Packing Specifications 6.3.1 A pack will contain a minimum of one message record or a maximum of 99,999 message records plus a pack header record and a pack trailer record. One transmission can contain a maximum of 99 packs and a minimum of one pack.

  • Equipment Specifications All equipment must meet the contract specifications and all federal and State safety codes and regulations in effect at the date of manufacture. All equipment must be Original Equipment Manufacturer (OEM) equipment unless otherwise stated in the contract. All products, materials, supplies, replacement parts, and equipment offered and furnished must be new, of current manufacturer production, and must have been formally announced by the manufacturer as being commercially available, unless otherwise stated in this Contract.

  • General specifications For the purpose of this Regulation, the vehicle shall fulfil the following requirements: