Basic Installation Clause Samples
Basic Installation. Basic Installation may be ordered for new or existing Unbundled Loops. Upon completion, Qwest will call CLEC to notify CLEC that the Qwest work has been completed.
9.2.2.9.1.1 For an existing End User, the Basic Installation option is a "lift and lay" procedure. The Central Office Technician (COT) "lifts" the Loop from its current termination and "lays" it on a new termination connecting to CLEC. There is no associated circuit testing performed.
Basic Installation. Basic Installation may be ordered for new or existing Unbundled Loops. Upon completion, CenturyLink will call CLEC to notify CLEC that the CenturyLink work has been completed.
9.2.2.9.1.1 For an existing End User Customer, the Basic Installation option is a "lift and lay" procedure. The Central Office Technician (COT) "lifts" the Loop from its current termination and "lays" it on a new termination connecting to CLEC. There is no associated circuit testing performed.
Basic Installation. Basic installation includes inside delivery, uncrating, assembly, installation, removal of all debris from premises, installation documents and the ▇▇▇▇ of materials per the purchaser’s approved plan and specifications.
Basic Installation. Basic Installation may be ordered for new or existing Unbundled Loops. Upon completion, Qwest will call CLEC to notify CLEC that the Qwest work has been completed.
Basic Installation. All flooring installations require foam underlay. Run the foam underlay in the same direction as the laminate panels. Underlay should be butted side by side with no overlap. Tape seams together. Diagram 1.
Basic Installation. Basic Installation may be ordered for new or existing Unbundled Loops.
Basic Installation. First Loop $ 152.75/1/ ----------------------------------------------------------------------------------------------------------------------------------- Each Additional Loop $ 120.10/1/ -----------------------------------------------------------------------------------------------------------------------------------
Basic Installation. All Equipment must be installed by a qualified installer. If you are a New Customer, then at the time of your initial installation only you will be entitled to basic installation for each Receiver you rent up to a maximum of four (4); provided however, that if you are renting a dual tuner Receiver, such Receiver shall be considered the equivalent of two (2) single tuner receivers for the purpose of this Section 3. Upon entering into this Agreement, you may also be required to sign an installation work order (“Work Order”) for the installation work to be performed in connection with this Agreement, which may stipulate additional installation charges, if any, for any additional work needed to install the Equipment, which is not covered under the terms of “Professional Basic Installation”. These charges, if any, will be disclosed to you prior to signing the Work Order and entering into this Agreement. You will, at your cost (a) grant ExpressVu and its agents safe access to your premises to install and activate the Equipment, (b) obtain all permits, consents and approvals for the installation, and (c) pay any installation fees disclosed to you prior to entering into this Agreement, if applicable. See information packaged with your Agreement for more information and a description of what is included in “Professional Basic Installation” and “Additional Receiver Installation”.
Basic Installation. NetApp ASE will connect NetApp-provided Product to existing networks, and configure one initial file service for each NAS protocol and/or logical disk units (“LUNs”) to a maximum of 2 hosts, including NetApp- provided host bus adapters (“HBAs”)/drivers, subject to the limitations stated below. Any Software purchased which runs on Data ONTAP (ie. Snapmirror or Snaplock) will be installed and enabled.
Basic Installation. Basic Installation may be ordered for new or existing Unbundled Loops. Upon completion, CenturyLink will call CLEC to notify CLEC that the CenturyLink work has been completed.
9.2.2.9.1.1 For an existing End User Customer, the Basic Installation option is a "lift and lay" procedure. The Central Office Technician (COT) "lifts" the Loop from its current termination and "lays" it on a new termination connecting to CLEC. There is no associated circuit testing performed.
9.2.2.9.1.2 For new End User Customer service, the Basic Installation option involves the COT and Field Technician (CST/NT) completing circuit wiring and performing the required performance tests to ensure the new circuit meets the required parameter limits. The test results are NOT provided to CLEC.
9.2.2.9.1.3 For basic installation of existing 2/4 wire analog Loops, CenturyLink provides a Quick Loop with or without Local Number Portability (LNP) option, that enables CLEC to receive the Quick Loop installation interval as set forth in Exhibit C. Quick Loop installation without LNP includes only a simple lift and lay procedure. Quick Loop with LNP installation provides a lift and lay, and the LNP functions. Quick Loop is not available with cooperative testing, coordinated installation, or when unbundling from an IDLC to a copper alternative.