Batching and Mixing. The location and preparation of the sites for the stock pilling of aggregates the maximum size of stock piles and the method adopted to prevent segregation of coarse and fine material shall be subject to the approval of the Superintending Engineer. Each separate size of coarse aggregates shall be stock piled separately.
Appears in 3 contracts
Sources: Contract, Contract, Construction Contract