Bituminous constructions Clause Samples

Bituminous constructions. (a) For Bituminous constructions other than wearing course, where the surface is low, the deficiency shall be corrected by the adding fresh material and recompacting specifications, where the surface is high the full depth of the layer shal bo removed and replaced with fresh material and compacted . to specifications. (b) For wearing course, where the surface is nigh or low the full depth of the layer shall be removed and replaced with fresh material and compacted to specifications. In all case where the removal and replacement of a bituminous layer is involved, the area treated shall not be less than 5 metre and less than 1 land wide
Bituminous constructions. (a) For Bituminous constructions other than wearing course, where the surface is low, the deficiency shall be corrected by the adding fresh material and recompacting specifications, where the surface is high the full depth of the layer shal bo removed and replaced with fresh material and compacted . to specifications. (b) For wearing course, where the surface is nigh or low the full depth of the layer shall be removed and replaced with fresh material and compacted to specifications. In all case where the removal and replacement of a bituminous layer is involved, the area treated shall not be less than 5 metre and less than 1 land wide 8-25 TRAFFIC REGULATIONS (a) Clause 112 of the SSRB shall apply to the whole works Tippers, trucks, Water Lorries to which when not in actual ▇▇▇▇ Shall be drawn ~Iear off thl? ro3rl. the c;afpt~1 to thp rllhlic an prpcal.ltionary meRsures shall be taken by way of lighting with bright red light and warnig boards. The contractor shall maintain watchman on the works and control and regulate traffic. If an where necessary. Notice boards shall be placed in suitable locations bearing in large letters in conspicuous columns. Warning notices shall be placed at the points in the neighbourhood of the work where other roads join and across the road and at such other places and points as may be directed to enable the motoists cyclists. . or other vehicular traffic, avoid the obstructed road by taking alternative routes. Extra payment will not be made for any such incidental items. . (b) penalty for not arranging traffic regulations: If the contractor fails to make arrarigements for traffic regulations as described in condition 8- 25 (a) a penalty of Rs500- day will be imposed on the contractor. 8-26 Cement and steel M.S./R.T.S will be supplied to the Contractor by the Corporation, (If and when available) at the rate of Rs /- per tonne, M.S. Rs /- per Tonne R.T.S. Rs /- per tonne, respectively and the cost recovered from the bills of the contractor for the work. The contractor wjll have to arrange for carting from the specified Corporation store yard at their own cost for car1ing the same to work site. The contractor's rate for the respective items involving cement. and steel should inclusive the cost of conveyance from the sources of departmental supply to the Workspot. The contractor shall not claim any compensation for non-supply of cement and steel by the departments.

Related to Bituminous constructions

  • Law; Construction This Agreement and any claim, counterclaim or dispute of any kind or nature whatsoever arising out of or in any way relating to this Agreement (“Claim”), directly or indirectly, shall be governed by, and construed in accordance with, the internal laws of the State of New York.

  • General Construction 20.2.1. Binding Nature.............................................. 20.2.2. Entire Agreement............................................ 20.2.3. Governing Law............................................... 20.2.4. Indulgences Not Waivers..................................... 20.2.5. Titles Not to Affect Interpretation......................... 20.2.6.

  • New Construction If this contract is for a Property that is newly constructed and the new construction option is selected, coverage begins on day one (1) of month thirteen

  • ICIF Construction The ICIF shall be designed and constructed in accordance with Good Utility Practice. Within one hundred twenty (120) Calendar Days after the Commercial Operation Date, unless the Parties agree on another mutually acceptable deadline, Interconnection Customer shall deliver to Transmission Provider and Transmission Owner “as-built” drawings, information and documents for the ICIF, such as: a one-line diagram, a site plan showing the Generating Facility and the ICIF, plan and elevation drawings showing the layout of the ICIF, a relay functional diagram, relaying AC and DC schematic wiring diagrams and relay settings for all facilities associated with the Interconnection Customer’s step-up transformers, the facilities connecting the Generating Facility to the step-up transformers and the ICIF, and the impedances (determined by factory tests) for the associated step-up transformers and the Generating Facility. Interconnection Customer shall provide Transmission Provider and Transmission Owner with Interconnection Customer’s specifications for the excitation system, automatic voltage regulator, Generating Facility control and protection settings, transformer tap settings, and communications, if applicable.

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.