Bids Exceeding Cost Estimate. If all bids exceed Consulting Engineer/Architect's Final Cost Estimate, Consulting Engineer/Architect, at the request of City and for no additional cost, will prepare a report for City identifying why all the bids exceed the estimate. The City has four (4) options if all bids exceed Consulting Engineer/Architect's estimate. The City may: (1) give written approval of an increase in the Project cost up to a maximum of 7% of the authorized total; (2) authorize rebidding of the Project; (3) terminate the Project and this Agreement; or (4) cooperate in revising the Project scope or specifications, or both, as necessary to reduce the Construction Cost. In the case of (4), Consulting Engineer/Architect, without additional charge to City, shall consult with City and shall revise and modify the drawings and specifications as necessary to achieve compliance with the Consulting Engineer/Architect's Estimate.
Bids Exceeding Cost Estimate. If all bids exceed Consulting Engineer/Architect's Final Cost Estimate, Consulting Engineer/Architect, at the request of City and for no additional cost, will prepare a report for City identifying why all the bids exceed the estimate. The City has four (4) options if all bids exceed Consulting Engineer/Architect's estimate. The City may: (1) give written approval of an increase in the project cost up to a maximum of 7% of the authorized total; (2) authorize rebidding of the project; (3) terminate the project and this Agreement; or
Bids Exceeding Cost Estimate. If all bids exceed Consultant's Final Cost Estimate, Consultant, at the request of City and for no additional cost, will prepare a report for City identifying why all the bids exceed the estimate. City has four (4) options if all bids exceed Consultant's estimate. City may: (1) give written approval of an increase in the Project cost up to a maximum of 7% above the authorized total; (2) authorize rebidding of the Project; (3) terminate the Project and this Agreement; or (4) cooperate in revising the Project scope or specifications, or both, as necessary to reduce the construction cost.
Bids Exceeding Cost Estimate. If all bids exceed Consulting Architect's Final Cost Estimate, Consulting Architect, at the request of City and for no additional cost, will prepare a report for City identifying why all the bids exceed the estimate. The City has four (4) options if all bids exceed Consulting Architect's estimate. The City may: (1) give written approval of an increase in the project cost up to a maximum of 7% of the authorized total; (2) authorize rebidding of the project; (3) terminate the project and this Agreement; or (4) cooperate in revising the Project scope or specifications, or both, as necessary to reduce the construction cost. In the case of (4), Consulting Architect, without additional charge to City, shall consult with City and shall revise and modify the drawings and specifications as necessary to achieve compliance with the Consulting Architect's estimate.
Bids Exceeding Cost Estimate. If all bids exceed Final Cost Estimate, Golf Course Designer, Engineer and Architect, at the request of City and for no additional cost, will prepare a report for City identifying why all the bids exceed the estimate. The City has four
Bids Exceeding Cost Estimate. If all bids exceed Golf Course Architect's Final Cost Estimate, Golf Course Architect, at the request of City and for no additional cost, will prepare a report for City identifying why all the bids exceed the estimate. The City has four (4) options if all bids exceed Golf Course Architect's estimate. The City may: (1) give written approval of an increase in the project cost up to a maximum of 7% of the authorized total; (2) authorize rebidding of the project; (3) terminate the project and this Agreement; or (4) cooperate in revising the Project scope or specifications, or both, as necessary to reduce the construction cost. In the case of (4), Golf Course Architect, without additional charge to City, shall consult with City and shall revise and modify the drawings and specifications as necessary to achieve compliance with the Golf Course Architect's estimate.

Related to Bids Exceeding Cost Estimate

  • Project Cost An updated cost spreadsheet reflecting the current forecasted cost vs. the latest approved budget vs. the baseline budget should be included in this section. One way to track project cost is to show: (1) Baseline Budget, (2) Latest Approved Budget, (3) Current Forecasted Cost Estimate, (4) Expenditures or Commitments to Date, and (5) Variance between Current Forecasted Cost and Latest Approved Budget. Line items should include all significant cost centers, such as prior costs, right-of-way, preliminary engineering, environmental mitigation, general engineering consultant, section design contracts, construction administration, utilities, construction packages, force accounts/task orders, wrap-up insurance, construction contingencies, management contingencies, and other contingencies. The line items can be broken-up in enough detail such that specific areas of cost change can be sufficiently tracked and future improvements made to the overall cost estimating methodology. A Program Total line should be included at the bottom of the spreadsheet. Narratives, tables, and/or graphs should accompany the updated cost spreadsheet, basically detailing the current cost status, reasons for cost deviations, impacts of cost overruns, and efforts to mitigate cost overruns. The following information should be provided: