Common use of Bridge Layout Clause in Contracts

Bridge Layout. The Engineer shall prepare a bridge layout plan sheet for each bridge and bridge class culvert. The Engineer shall determine the location of each soil boring needed for foundation design in accordance with the Geotechnical Manual. Following is the list of anticipated bridges and bridge class culverts:

Appears in 1 contract

Sources: Contract for Engineering Services

Bridge Layout. The Engineer shall prepare a bridge layout plan sheet for each bridge and bridge class culvert. The Engineer shall determine the location of each soil boring needed for foundation design in accordance with the Geotechnical Manual. Following is Prior to preparation of each bridge layout, the list Engineer shall prepare a comparative cost analysis of anticipated bridges and bridge class culverts:structures to determine: (1) the optimum bridge beams for vertical clearance over railroads, roadway, or waterways, and

Appears in 1 contract

Sources: Contract for Engineering Services