Common use of Building Over Clause in Contracts

Building Over. The Developer shall not build plant or place anything over or within three metres measured horizontally from the centreline of any Sewer (or such other distance as may be reasonably specified by ▇▇▇ ▇▇▇▇▇▇▇▇▇▇) without the written consent of ▇▇▇ ▇▇▇▇▇▇▇▇▇▇ PROVIDED THAT consent shall be deemed to be refused if consent is not given within ten days PROVIDED ALSO THAT this condition shall not apply to anything shown on the Drawings or the Layout Plan within the Protected Strip.

Appears in 2 contracts

Sources: Water Industry Agreement, Water Industry Agreement

Building Over. The Developer shall not build plant or place anything over or within three [ ] metres measured horizontally from the centreline of any Sewer or Lateral Drain which are to be included in the Vesting Declaration (or such other distance as may be reasonably specified by ▇▇▇ ▇▇▇▇▇▇▇▇▇▇) without the written consent of ▇▇▇ ▇▇▇▇▇▇▇▇▇▇ PROVIDED THAT consent shall be deemed to be refused if consent is not given within ten days PROVIDED ALSO THAT this condition shall not apply to anything shown on the Drawings or the Layout Plan within the Protected Strip.

Appears in 1 contract

Sources: Model Agreement Under Section 104 of the Water Industry Act 1991

Building Over. S.6 The Developer shall not build plant or place anything over or within three 2.5 metres measured horizontally from the centreline of any Sewer or Lateral Drain which are to be included in the Vesting Declaration (or such other distance as may be reasonably specified by ▇▇▇ ▇▇▇▇▇▇▇▇▇▇) without the written consent of ▇▇▇ ▇▇▇▇▇▇▇▇▇▇ PROVIDED THAT consent shall be deemed to be refused if consent is not given within ten 10 days PROVIDED ALSO THAT this condition shall not apply to anything shown on the Drawings or the Layout Plan within the Protected StripStrip .

Appears in 1 contract

Sources: Section 104 Agreement

Building Over. The Developer shall not build plant or place anything over or within three 3 metres measured horizontally from the centreline of any Sewer or Lateral Drain which are to be included in the Vesting Declaration (or such other distance as may be reasonably specified by ▇▇▇ ▇▇▇▇▇▇▇▇▇▇) without the written consent of ▇▇▇ ▇▇▇▇▇▇▇▇▇▇ PROVIDED THAT provided that consent shall be deemed to be refused if consent is not given within ten days PROVIDED ALSO THAT provided also that this condition shall not apply to anything shown on the Drawings or the Layout Plan within the Protected Strip.

Appears in 1 contract

Sources: Agreement Under Section 104 of the Water Industry Act 1991

Building Over. The Developer shall not build plant or place anything over or within three 3 metres measured horizontally from the centreline of any Sewer or Lateral Drain which are to be included in the Vesting Declaration (or such other distance as may be reasonably specified by ▇▇▇ ▇▇▇▇▇▇▇▇▇▇) without the written consent of ▇▇▇ ▇▇▇▇▇▇▇▇▇▇ PROVIDED THAT consent shall be deemed to be refused if consent is not given within ten days PROVIDED ALSO THAT this condition shall not apply to anything shown on the Drawings or the Layout Plan within the Protected Strip.

Appears in 1 contract

Sources: Sewers for Adoption Agreement

Building Over. 6.1 The Developer shall not build plant or place anything over or within three 3 metres measured horizontally from the centreline of any Sewer sewer (or such other distance as may be reasonably specified by ▇▇▇ ▇▇▇▇▇▇▇▇▇▇the Authority) without the prior written consent of ▇▇▇ ▇▇▇▇▇▇▇▇▇▇ PROVIDED THAT consent the Authority 6.2 Consent under paragraph 6.1 shall be deemed to be refused if consent it is not given within ten days PROVIDED ALSO THAT this condition shall 10 days 6.3 Paragraph 6.1 does not apply to anything shown on the Drawings or the Layout Plan within the Protected Strip.

Appears in 1 contract

Sources: Sewerage Agreement