BUTTED AND BOUNDED BY. North : …………….. South : …………….. East : ……………. West : ………………. SCHEDULE „C‟ - PAYMENT PLAN Down Payment (Booking / Agreement) upto 20% of the Total Price of the Flat and Car Parking. Next 30 % on Completion of Plinth Ground level of the Total Price of the Flat and Car Parking. Next 10 % on Completion of 1st floor slab, of the Total Price of the Flat and Car Parking. nd Next 10 % on Completion of 2 floor slab, of the Total Price of the Flat and Car Parking. Next 7.5 % on Completion of top slab of the Total Price of the Flat and Car Parking. Next 10 % on Brick Work/ Plaster/ of the Total Price of the Flat and Car Parking. Next 7.5 % on Flooring/ Plumbing of the Total Price of the Flat and Car Parking. Balance before 7 Days of Possession of the Total Price of the Flat and Car Parking. Balance Amount RCC Frame Internal: All internal walls of 125 mm thick red brick finished with reputed brand putty, External: All walls of 200 mm thick red brick finished with Weather proof exterior finishing paint of reputed brand. Flooring: Vitrified tiles flooring in bed room, leaving room and balcony, Toilet and Kitchen – Tiles. Concealed ISI copper conductor flexible wire and modular switches of reputed brand. Internet point in Living room. Geyser connecting provision in one toilet, micro oven, aqua guard connecting provision. Generator connecting power backup provision, A.C. point in one bedroom and living room. Cooking Platform with Black Stone structure, granite top table, Stainless Steel sink, reputed brand glazed tiling up to 3‟-0 inch” height from cooking table.
Appears in 1 contract
Sources: Sale Agreement
BUTTED AND BOUNDED BY. North : …………….. South : …………….. East : ……………. West : ………………One Car Parking Space/Garage having covered area of Sq.ft. SCHEDULE „C‟ - PAYMENT PLAN in the Ground Floor Block No: One Car Parking Space/Garage No. Down Payment (Booking / Agreement) upto 20% of the Total Price of the Flat and Car ParkingParking space. Next 30 % on Completion of Plinth Ground level of the Total Price of the Flat and Car ParkingParking space. Next 10 % on Completion of 1st floor slab, of the Total Price of the Flat and Car ParkingParking space. nd Next 10 % on Completion of 2 floor slab, of the Total Price of the Flat and Car ParkingParking space. Next 7.5 % on Completion of top slab of the Total Price of the Flat and Car ParkingParking space. Next 10 % on Brick Work/ Plaster/ of the Total Price of the Flat and Car ParkingParking space. Next 7.5 % on Flooring/ Plumbing of the Total Price of the Flat and Car ParkingParking space. Balance before 7 Days of Possession of the Total Price of the Flat and Car ParkingParking space. Balance Amount RCC Frame Internal: All internal walls of 125 mm thick red brick finished with reputed brand putty, External: All walls of 200 mm thick red brick finished with Weather proof exterior finishing paint of reputed brand. Flooring: Vitrified tiles flooring in bed room, leaving room and balcony, Toilet and Kitchen – Tiles. Concealed ISI copper conductor flexible wire and modular switches of reputed brand. Internet point in Living room. Geyser connecting provision in one toiletGeyser, micro oven, aqua guard connecting provision. Generator connecting power backup provision, A.C. point in one bedroom and living room. Cooking Platform with Black Stone structure, granite top table, Stainless Steel sink, reputed brand glazed tiling up to 3‟-0 3’-0 inch” height from cooking table.
Appears in 1 contract
Sources: Sale Agreement