Common use of Bypasses Clause in Contracts

Bypasses. The details of the existing road sections proposed to be bypassed are as follows: 1 Panchgram Bypass From Km 22+680 of NH-37 to NH-6 (Old NH-44) near ▇▇▇▇▇▇▇▇▇ Pt.-I Village. Km 16+330 to Km 27+300 10.970 (vi) Nil The dates on which the Authority shall provide Right of Way of Construction Zone to the Contractor on different stretches of the Site are stated below: (1) (2) (3) (4) (5) (i) Full Right of Way (full width) 16+300 to 16+960 16+960 to 17+050 17+050 to 17+450 17+450 to 18+580 18+580 to 27+300 0+660 0+090 0+400 1+130 8+720 6050603560 90% ROW ofConstruction Zone to be handed over on Appointed Date and balance within 150 days from Appointed date (a) Stretch (b) Stretch (c) Stretch (d) Stretch (e) Stretch (ii) Part Right of Way (part width) (a) Stretch 15+500 to 15+700 0+200 30 On appointed date (b) Stretch 15+700 to 16+300 0+600 30 (Average) (iii) Balance Right of Way (width) 90% ROW of (a) Stretch 15+500 to 15+700 0+200 15 Construction Zone to be (b) Stretch 15+700 to 16+300 0+600 30(Average) handed over on Appointed Date and balance within 150 days from Appointed date Annex – III (Schedule-A) Alignment Plans The existing alignment of the Project Highway shall be modified in the following sections as per the alignment plan indicated below: (i) The alignment of the Project Highway is enclosed in alignment plan. Finished road level indicated in the alignment plan shall be followed by the contractor as minimum FRL. In any case, the finished road level of the project highway shall not be less than those indicated in the alignment plan. The contractor shall, however, improve/upgrade the Road profile as indicated in Annex-III based on site/design requirement. (ii) Traffic Signage plan of the Project Highway showing numbers & location of traffic signs is enclosed. The contractor shall, however, improve/upgrade upon the traffic signage plan as indicated in Annex-III based on site/design requirement as per the relevant specifications/IRC Codes/Manual.

Appears in 2 contracts

Sources: Engineering Procurement and Construction (Epc) Agreement, Engineering Procurement and Construction (Epc) Agreement