Common use of CLEC to CLEC Conversions for Unbundled Loops Clause in Contracts

CLEC to CLEC Conversions for Unbundled Loops. 2.1.10.1 The CLEC to CLEC conversion process for unbundled Loops may be used by Lightyear when converting an existing unbundled Loop from another CLEC for the same end user. The Loop type being converted must be included in Lightyear’s Interconnection Agreement before requesting a conversion. 2.1.10.2 To utilize the CLEC to CLEC conversion process, the Loop being converted must be the same Loop type with no requested changes to the Loop, must serve the same end user location from the same serving wire center, and must not require an outside dispatch to provision. 2.1.10.3 The Loops converted to Lightyear pursuant to the CLEC to CLEC conversion process shall be provisioned in the same manner and with the same functionality and options as described in this Attachment for the specific Loop type. Order Coordination (OC) Order Coordination – Time Specific (OC-TS) Test Points DLR Charge for Dispatch and Testing if No Trouble Found SL-1 (Non- Designed) Chargeable Option Chargeable Option Not available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office UCL-ND (Non- Designed) Chargeable Option Not Available Not Available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office Unbundled Voice Loops - SL-2 (including 2- and 4-wire UVL) (Designed) Included Chargeable Option Included Included Charged for Dispatch outside Central Office Unbundled Digital Loop (Designed) Included Chargeable Option (except on Universal Digital Channel) Included (where appropriate) Included Charged for Dispatch outside Central Office Unbundled Copper Loop (Designed) Chargeable in accordance with Section 2 Not available Included Included Charged for Dispatch outside Central Office For UVL-SL1 and UCLs, Lightyear must order and will be billed for both OC and OC-TS if requesting OC-TS.

Appears in 3 contracts

Sources: Clec Agreement, Clec Agreement, Clec Agreement

CLEC to CLEC Conversions for Unbundled Loops. 2.1.10.1 The CLEC to CLEC conversion process for unbundled Loops may be used by Lightyear Louisville Telephone when converting an existing unbundled Loop from another CLEC for the same end user. The Loop type being converted must be included in LightyearLouisville Telephone’s Interconnection Agreement before requesting a conversion. 2.1.10.2 To utilize the CLEC to CLEC conversion process, the Loop being converted must be the same Loop type with no requested changes to the Loop, must serve the same end user location from the same serving wire center, and must not require an outside dispatch to provision. 2.1.10.3 The Loops converted to Lightyear Louisville Telephone pursuant to the CLEC to CLEC conversion process shall be provisioned in the same manner and with the same functionality and options as described in this Attachment for the specific Loop type. Order Coordination (OC) Order Coordination – Time Specific (OC-TS) Test Points DLR Charge for Dispatch and Testing if No Trouble Found SL-1 (Non- Designed) Chargeable Option Chargeable Option Not available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office UCL-ND (Non- Designed) Chargeable Option Not Available Not Available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office Unbundled Voice Loops - SL-2 (including 2- and 4-wire UVL) (Designed) Included Chargeable Option Included Included Charged for Dispatch outside Central Office Unbundled Digital Loop (Designed) Included Chargeable Option (except on Universal Digital Channel) Included (where appropriate) Included Charged for Dispatch outside Central Office Unbundled Copper Loop (Designed) Chargeable in accordance with Section 2 Not available Included Included Charged for Dispatch outside Central Office For UVL-SL1 and UCLs, Lightyear Louisville Telephone must order and will be billed for both OC and OC-TS if requesting OC-TS.

Appears in 3 contracts

Sources: Interconnection Agreement, Interconnection Agreement, Interconnection Agreement

CLEC to CLEC Conversions for Unbundled Loops. 2.1.10.1 The CLEC to CLEC conversion process for unbundled Loops may be used by Lightyear Global Connection when converting an existing unbundled Loop from another CLEC for the same end user. The Loop type being converted must be included in LightyearGlobal Connection’s Interconnection Agreement before requesting a conversion. 2.1.10.2 To utilize the CLEC to CLEC conversion process, the Loop being converted must be the same Loop type with no requested changes to the Loop, must serve the same end user location from the same serving wire center, and must not require an outside dispatch to provision. 2.1.10.3 The Loops converted to Lightyear Global Connection pursuant to the CLEC to CLEC conversion process shall be provisioned in the same manner and with the same functionality and options as described in this Attachment for the specific Loop type. Order Coordination (OC) Order Coordination – Time Specific (OC-TS) Test Points DLR Charge for Dispatch and Testing if No Trouble Found SL-1 (Non- Designed) Chargeable Option Chargeable Option Not available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office UCL-ND (Non- Designed) Chargeable Option Not Available Not Available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office Unbundled Voice Loops - SL-2 (including 2- and 4-wire UVL) (Designed) Included Chargeable Option Included Included Charged for Dispatch outside Central Office Unbundled Digital Loop (Designed) Included Chargeable Option (except on Universal Digital Channel) Included (where appropriate) Included Charged for Dispatch outside Central Office Unbundled Copper Loop (Designed) Chargeable in accordance with Section 2 Not available Included Included Charged for Dispatch outside Central Office For UVL-SL1 and UCLs, Lightyear Global Connection must order and will be billed for both OC and OC-OC- TS if requesting OC-TS.

Appears in 3 contracts

Sources: Clec Agreement, Clec Agreement, Clec Agreement

CLEC to CLEC Conversions for Unbundled Loops. 2.1.10.1 The CLEC to CLEC conversion process for unbundled Loops may be used by Lightyear Budget Phone when converting an existing unbundled Loop from another CLEC for the same end user. The Loop type being converted must be included in LightyearBudget Phone’s Interconnection Agreement before requesting a conversion. 2.1.10.2 To utilize the CLEC to CLEC conversion process, the Loop being converted must be the same Loop type with no requested changes to the Loop, must serve the same end user location from the same serving wire center, and must not require an outside dispatch to provision. 2.1.10.3 The Loops converted to Lightyear Budget Phone pursuant to the CLEC to CLEC conversion process shall be provisioned in the same manner and with the same functionality and options as described in this Attachment for the specific Loop type. Order Coordination (OC) Order Coordination – Time Specific (OC-TS) Test Points DLR Charge for Dispatch and Testing if No Trouble Found SL-1 (Non- Designed) Chargeable Option Chargeable Option Not available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office UCL-ND (Non- Designed) Chargeable Option Not Available Not Available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office Unbundled Voice Loops - SL-2 (including 2- and 4-wire UVL) (Designed) Included Chargeable Option Included Included Charged for Dispatch outside Central Office Unbundled Digital Loop (Designed) Included Chargeable Option (except on Universal Digital Channel) Included (where appropriate) Included Charged for Dispatch outside Central Office Unbundled Copper Loop (Designed) Chargeable in accordance with Section 2 Not available Included Included Charged for Dispatch outside Central Office For UVL-SL1 and UCLs, Lightyear Budget Phone must order and will be billed for both OC and OC-TS if requesting OC-TS.

Appears in 2 contracts

Sources: Clec Agreement, Clec Agreement

CLEC to CLEC Conversions for Unbundled Loops. 2.1.10.1 The CLEC to CLEC conversion process for unbundled Loops may be used by Lightyear Comm South when converting an existing unbundled Loop from another CLEC for the same end user. The Loop type being converted must be included in LightyearComm South’s Interconnection Agreement before requesting a conversion. 2.1.10.2 To utilize the CLEC to CLEC conversion process, the Loop being converted must be the same Loop type with no requested changes to the Loop, must serve the same end user location from the same serving wire center, and must not require an outside dispatch to provision. 2.1.10.3 The Loops converted to Lightyear Comm South pursuant to the CLEC to CLEC conversion process shall be provisioned in the same manner and with the same functionality and options as described in this Attachment for the specific Loop type. Order Coordination (OC) Order Coordination – Time Specific (OC-TS) Test Points DLR Charge for Dispatch and Testing if No Trouble Found SL-1 (Non- Designed) Chargeable Option Chargeable Option Not available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office UCL-ND (Non- Designed) Chargeable Option Not Available Not Available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office Unbundled Voice Loops - SL-2 (including 2- and 4-wire UVL) (Designed) Included Chargeable Option Included Included Charged for Dispatch outside Central Office Unbundled Digital Loop (Designed) Included Chargeable Option (except on Universal Digital Channel) Included (where appropriate) Included Charged for Dispatch outside Central Office Unbundled Copper Loop (Designed) Chargeable in accordance with Section 2 Not available Included Included Charged for Dispatch outside Central Office For UVL-SL1 and UCLs, Lightyear Comm South must order and will be billed for both OC and OC-TS if requesting OC-TS.

Appears in 2 contracts

Sources: Clec Agreement, Clec Agreement

CLEC to CLEC Conversions for Unbundled Loops. 2.1.10.1 The CLEC to CLEC conversion process for unbundled Loops may be used by Lightyear CCI when converting an existing unbundled Loop from another CLEC for the same end user. The Loop type being converted must be included in LightyearCCI’s Interconnection Agreement before requesting a conversion. 2.1.10.2 To utilize the CLEC to CLEC conversion process, the Loop being converted must be the same Loop type with no requested changes to the Loop, must serve the same end user location from the same serving wire center, and must not require an outside dispatch to provision. 2.1.10.3 The Loops converted to Lightyear CCI pursuant to the CLEC to CLEC conversion process shall be provisioned in the same manner and with the same functionality and options as described in this Attachment for the specific Loop type. Order Coordination (OC) Order Coordination – Time Specific (OC-TS) Test Points DLR Charge for Dispatch and Testing if No Trouble Found SL-1 (Non- Designed) Chargeable Option Chargeable Option Not available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office Document UCL-ND (Non- Designed) Chargeable Option Not Available Not Available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office Unbundled Voice Loops - SL-2 (including 2- and 4-wire UVL) (Designed) Included Chargeable Option Included Included Charged for Dispatch outside Central Office Unbundled Digital Loop (Designed) Included Chargeable Option (except on Universal Digital Channel) Included (where appropriate) Included Charged for Dispatch outside Central Office Unbundled Copper Loop (Designed) Chargeable in accordance with Section 2 Not available Included Included Charged for Dispatch outside Central Office For UVL-SL1 and UCLs, Lightyear CCI must order and will be billed for both OC and OC-TS if requesting OC-TS.

Appears in 2 contracts

Sources: Interconnection Agreement, Interconnection Agreement

CLEC to CLEC Conversions for Unbundled Loops. 2.1.10.1 The CLEC to CLEC conversion process for unbundled Loops may be used by Lightyear Granite when converting an existing unbundled Loop from another CLEC for the same end user. The Loop type being converted must be included in LightyearGranite’s Interconnection Agreement before requesting a conversion. 2.1.10.2 To utilize the CLEC to CLEC conversion process, the Loop being converted must be the same Loop type with no requested changes to the Loop, must serve the same end user location from the same serving wire center, and must not require an outside dispatch to provision. 2.1.10.3 The Loops converted to Lightyear Granite pursuant to the CLEC to CLEC conversion process shall be provisioned in the same manner and with the same functionality and options as described in this Attachment for the specific Loop type. Order Coordination (OC) Order Coordination – Time Specific (OC-TS) Test Points DLR Charge for Dispatch and Testing if No Trouble Found SL-1 (Non- Designed) Chargeable Option Chargeable Option Not available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office UCL-ND (Non- Designed) Chargeable Option Not Available Not Available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office Unbundled Voice Loops - SL-2 (including 2- and 4-wire UVL) (Designed) Included Chargeable Option Included Included Charged for Dispatch outside Central Office Unbundled Digital Loop (Designed) Included Chargeable Option (except on Universal Digital Channel) Included (where appropriate) Included Charged for Dispatch outside Central Office Unbundled Copper Loop (Designed) Chargeable in accordance with Section 2 Not available Included Included Charged for Dispatch outside Central Office For UVL-SL1 and UCLs, Lightyear Granite must order and will be billed for both OC and OC-TS if requesting OC-TS.

Appears in 2 contracts

Sources: Clec Agreement, Bellsouth® / Clec Agreement

CLEC to CLEC Conversions for Unbundled Loops. 2.1.10.1 The CLEC to CLEC conversion process for unbundled Loops may be used by Lightyear Symtelco when converting an existing unbundled Loop from another CLEC for the same end user. The Loop type being converted must be included in LightyearSymtelco’s Interconnection Agreement before requesting a conversion. 2.1.10.2 To utilize the CLEC to CLEC conversion process, the Loop being converted must be the same Loop type with no requested changes to the Loop, must serve the same end user location from the same serving wire center, and must not require an outside dispatch to provision. 2.1.10.3 The Loops converted to Lightyear Symtelco pursuant to the CLEC to CLEC conversion process shall be provisioned in the same manner and with the same functionality and options as described in this Attachment for the specific Loop type. Order Coordination (OC) Order Coordination – Time Specific (OC-TS) Test Points DLR Charge for Dispatch and Testing if No Trouble Found SL-1 (Non- Designed) Chargeable Option Chargeable Option Not available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office Document UCL-ND (Non- Designed) Chargeable Option Not Available Not Available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office Unbundled Voice Loops - SL-2 (including 2- and 4-wire UVL) (Designed) Included Chargeable Option Included Included Charged for Dispatch outside Central Office Unbundled Digital Loop (Designed) Included Chargeable Option (except on Universal Digital Channel) Included (where appropriate) Included Charged for Dispatch outside Central Office Unbundled Copper Loop (Designed) Chargeable in accordance with Section 2 Not available Included Included Charged for Dispatch outside Central Office For UVL-SL1 and UCLs, Lightyear Symtelco must order and will be billed for both OC and OC-TS if requesting OC-TS.

Appears in 2 contracts

Sources: Interconnection Agreement, Interconnection Agreement

CLEC to CLEC Conversions for Unbundled Loops. 2.1.10.1 2.1.8.1 The CLEC to CLEC conversion process for unbundled Loops may be used by Lightyear Velocity when converting an existing unbundled Loop from another CLEC for the same end userEnd User. The Loop type being converted must be included in LightyearVelocity’s Interconnection Agreement before requesting a conversion. 2.1.10.2 2.1.8.2 To utilize the CLEC to CLEC conversion process, the Loop being converted must be the same Loop type with no requested changes to the Loop, must serve the same end user End User location from the same serving wire center, and must not require an outside dispatch to provision. 2.1.10.3 2.1.8.3 The Loops converted to Lightyear Velocity pursuant to the CLEC to CLEC conversion process shall be provisioned in the same manner and with the same functionality and options as described in this Attachment for the specific Loop type. Order Coordination (OC) Order Coordination – Time Specific (OC-TS) Test Points DLR Charge for Dispatch and Testing if No Trouble Found SL-1 (Non- Designed) Chargeable Option Chargeable Option Not available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office UCL-ND (Non- Designed) Chargeable Option Not Available Not Available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office Unbundled Voice Loops - SL-2 (including 2- and 4-wire UVL) (Designed) Included Chargeable Option Included Included Charged for Dispatch outside Central Office Unbundled Digital Loop (Designed) Included Chargeable Option (except on Universal Digital Channel) Included (where appropriate) Included Charged for Dispatch outside Central Office Unbundled Copper Loop (Designed) Chargeable in accordance with Section 2 Not available Included Included Charged for Dispatch outside Central Office For UVL-SL1 and UCLs, Lightyear Velocity must order and will be billed for both OC and OC-TS if requesting OC-TS.

Appears in 1 contract

Sources: Interconnection Agreement

CLEC to CLEC Conversions for Unbundled Loops. 2.1.10.1 2.1.8.1 The CLEC to CLEC conversion process for unbundled Loops may be used by Lightyear Budget Phone when converting an existing unbundled Loop from another CLEC for the same end userEnd User. The Loop type being converted must be included in LightyearBudget Phone’s Interconnection Agreement before requesting a conversion. 2.1.10.2 2.1.8.2 To utilize the CLEC to CLEC conversion process, the Loop being converted must be the same Loop type with no requested changes to the Loop, must serve the same end user End User location from the same serving wire center, and must not require an outside dispatch to provision. 2.1.10.3 2.1.8.3 The Loops converted to Lightyear Budget Phone pursuant to the CLEC to CLEC conversion process shall be provisioned in the same manner and with the same functionality and options as described in this Attachment for the specific Loop type. Order Coordination (OC) Order Coordination – Time Specific (OC-TS) Test Points DLR Charge for Dispatch and Testing if No Trouble Found SL-1 (Non- Designed) Chargeable Option Chargeable Option Not available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office UCL-ND (Non- Designed) Chargeable Option Not Available Not Available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office Unbundled Voice Loops - SL-2 (including 2- and 4-wire UVL) (Designed) Included Chargeable Option Included Included Charged for Dispatch outside Central Office Unbundled Digital Loop (Designed) Included Chargeable Option (except on Universal Digital Channel) Included (where appropriate) Included Charged for Dispatch outside Central Office Unbundled Copper Loop (Designed) Chargeable in accordance with Section 2 Not available Included Included Charged for Dispatch outside Central Office For UVL-SL1 and UCLs, Lightyear Budget Phone must order and will be billed for both OC and OC-TS if requesting OC-TS.

Appears in 1 contract

Sources: Interconnection Agreement

CLEC to CLEC Conversions for Unbundled Loops. 2.1.10.1 The CLEC to CLEC conversion process for unbundled Loops may be used by Lightyear A- Tech Telecom when converting an existing unbundled Loop from another CLEC for the same end user. The Loop type being converted must be included in LightyearA-Tech Telecom’s Interconnection Agreement before requesting a conversion. 2.1.10.2 To utilize the CLEC to CLEC conversion process, the Loop being converted must be the same Loop type with no requested changes to the Loop, must serve the same end user location from the same serving wire center, and must not require an outside dispatch to provision. 2.1.10.3 The Loops converted to Lightyear A-Tech Telecom pursuant to the CLEC to CLEC conversion process shall be provisioned in the same manner and with the same functionality and options as described in this Attachment for the specific Loop type. Order Coordination (OC) Order Coordination – Time Specific (OC-TS) Test Points DLR Charge for Dispatch and Testing if No Trouble Found SL-1 Chargeable Chargeable Option Not Chargeable Charged for Dispatch (Non- Designed) Chargeable Option Chargeable Option Not available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office UCL-ND (Non- Designed) Chargeable Option Not Available Not Available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office Unbundled Voice Loops - SL-2 (including 2- and 4-wire UVL) (Designed) Included Chargeable Option Included Included Charged for Dispatch outside Central Office Unbundled Digital Loop (Designed) Included Chargeable Option (except on Universal Digital Channel) Included (where appropriate) Included Charged for Dispatch outside Central Office Unbundled Copper Loop (Designed) Chargeable in accordance with Section 2 Not available Included Included Charged for Dispatch outside Central Office For UVL-SL1 and UCLs, Lightyear A-Tech Telecom must order and will be billed for both OC and OC-TS if requesting OC-TS.

Appears in 1 contract

Sources: Clec Agreement

CLEC to CLEC Conversions for Unbundled Loops. 2.1.10.1 The CLEC to CLEC conversion process for unbundled Loops may be used by Lightyear Spectrotel when converting an existing unbundled Loop from another CLEC for the same end user. The Loop type being converted must be included in LightyearSpectrotel’s Interconnection Agreement before requesting a conversion. 2.1.10.2 To utilize the CLEC to CLEC conversion process, the Loop being converted must be the same Loop type with no requested changes to the Loop, must serve the same end user location from the same serving wire center, and must not require an outside dispatch to provision. 2.1.10.3 The Loops converted to Lightyear Spectrotel pursuant to the CLEC to CLEC conversion process shall be provisioned in the same manner and with the same functionality and options as described in this Attachment for the specific Loop type. Order Coordination (OC) Order Coordination – Time Specific (OC-TS) Test Points DLR Charge for Dispatch and Testing if No Trouble Found SL-1 (Non- Designed) Chargeable Option Chargeable Option Not available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office UCL-ND (Non- Designed) Chargeable Option Not Available Not Available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office Unbundled Voice Loops - SL-2 (including 2- and 4-wire UVL) (Designed) Included Chargeable Option Included Included Charged for Dispatch outside Central Office Unbundled Digital Loop (Designed) Included Chargeable Option (except on Universal Digital Channel) Included (where appropriate) Included Charged for Dispatch outside Central Office Unbundled Copper Loop (Designed) Chargeable in accordance with Section 2 Not available Included Included Charged for Dispatch outside Central Office For UVL-SL1 and UCLs, Lightyear Spectrotel must order and will be billed for both OC and OC-TS if requesting OC-TS.

Appears in 1 contract

Sources: Clec Agreement

CLEC to CLEC Conversions for Unbundled Loops. 2.1.10.1 The CLEC to CLEC conversion process for unbundled Loops may be used by Lightyear BTI when converting an existing unbundled Loop from another CLEC for the same end user. The Loop type being converted must be included in LightyearBTI’s Interconnection Agreement before requesting a conversion. 2.1.10.2 To utilize the CLEC to CLEC conversion process, the Loop being converted must be the same Loop type with no requested changes to the Loop, must serve the same end user location from the same serving wire center, and must not require an outside dispatch to provision. 2.1.10.3 The Loops converted to Lightyear BTI pursuant to the CLEC to CLEC conversion process shall be provisioned in the same manner and with the same functionality and options as described in this Attachment for the specific Loop type. Order Coordination (OC) Order Coordination – Time Specific (OC-TS) Test Points DLR Charge for Dispatch and Testing if No Trouble Found SL-1 (Non- Designed) Chargeable Option Chargeable Option Not available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office UCL-ND (Non- Designed) Chargeable Option Not Available Not Available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office Unbundled Voice Loops - SL-2 (including 2- and 4-wire UVL) (Designed) Included Chargeable Option Included Included Charged for Dispatch outside Central Office Unbundled Digital Loop (Designed) Included Chargeable Option (except on Universal Digital Channel) Included (where appropriate) Included Charged for Dispatch outside Central Office Unbundled Copper Loop (Designed) Chargeable in accordance with Section 2 Not available Included Included Charged for Dispatch outside Central Office For UVL-SL1 and UCLs, Lightyear BTI must order and will be billed for both OC and OC-TS if requesting OC-TS.

Appears in 1 contract

Sources: Clec Agreement

CLEC to CLEC Conversions for Unbundled Loops. 2.1.10.1 The CLEC to CLEC conversion process for unbundled Loops may be used by Lightyear FTS when converting an existing unbundled Loop from another CLEC for the same end user. The Loop type being converted must be included in LightyearFTS’s Interconnection Agreement before requesting a conversion. 2.1.10.2 To utilize the CLEC to CLEC conversion process, the Loop being converted must be the same Loop type with no requested changes to the Loop, must serve the same end user location from the same serving wire center, and must not require an outside dispatch to provision. 2.1.10.3 The Loops converted to Lightyear FTS pursuant to the CLEC to CLEC conversion process shall be provisioned in the same manner and with the same functionality and options as described in this Attachment for the specific Loop type. Order Coordination (OC) Order Coordination – Time Specific (OC-TS) Test Points DLR Charge for Dispatch and Testing if No Trouble Found SL-1 (Non- Designed) Chargeable Option Chargeable Option Not available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office UCL-ND (Non- Designed) Chargeable Option Not Available Not Available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office Unbundled Voice Loops - SL-2 (including 2- and 4-wire UVL) (Designed) Included Chargeable Option Included Included Charged for Dispatch outside Central Office Unbundled Digital Loop (Designed) Included Chargeable Option (except on Universal Digital Channel) Included (where appropriate) Included Charged for Dispatch outside Central Office Unbundled Copper Loop (Designed) Chargeable in accordance with Section 2 Not available Included Included Charged for Dispatch outside Central Office For UVL-SL1 and UCLs, Lightyear FTS must order and will be billed for both OC and OC-TS if requesting OC-TS.

Appears in 1 contract

Sources: Bellsouth® / Clec Agreement

CLEC to CLEC Conversions for Unbundled Loops. 2.1.10.1 2.1.8.1 The CLEC to CLEC conversion process for unbundled Loops may be used by Lightyear AT&T AND TC SYSTEMS when converting an existing unbundled Loop from another CLEC for the same end userEnd User. The Loop type being converted must be included in LightyearAT&T AND TC SYSTEMS’s Interconnection Agreement before requesting a conversion. 2.1.10.2 2.1.8.2 To utilize the CLEC to CLEC conversion process, the Loop being converted must be the same Loop type with no requested changes to the Loop, must serve the same end user End User location from the same serving wire center, and must not require an outside dispatch to provision. 2.1.10.3 2.1.8.3 The Loops converted to Lightyear AT&T AND TC SYSTEMS pursuant to the CLEC to CLEC conversion process shall be provisioned in the same manner and with the same functionality and options as described in this Attachment for the specific Loop type, with the exception of LNP, over which BellSouth has no control in a CLEC to CLEC loop conversion. Such conversions shall be done in an interval no longer than conversions from a CLEC to BellSouth (i.e., winback). 2.1 8.4 Order Coordination (OC) Order Coordination – Time Specific (OC-TS) Test Points DLR Charge for Dispatch and Testing if No Trouble Found SL-1 (Non- Designed) Chargeable Option Chargeable Option Not available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office UCL-ND (Non- Designed) Chargeable Option Not Available Not Available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office Unbundled Voice Loops - SL-2 (including 2- and 4-wire UVL) (Designed) Included Chargeable Option Included Included Charged for Dispatch outside Central Office Unbundled Digital Loop (Designed) Included Chargeable Option (except on Universal Digital Channel) Included (where appropriate) Included Charged for Dispatch outside Central Office Unbundled Copper Loop (Designed) Chargeable in accordance with Section 2 Not available Included Included Charged for Dispatch outside Central Office For UVL-SL1 and UCLs, Lightyear AT&T AND TC SYSTEMS must order and will be billed for both OC and OC-TS if requesting OC-TS.

Appears in 1 contract

Sources: Interconnection Agreement

CLEC to CLEC Conversions for Unbundled Loops. 2.1.10.1 The CLEC to CLEC conversion process for unbundled Loops may be used by Lightyear Knology when converting an existing unbundled Loop from another CLEC for the same end user. The Loop type being converted must be included in LightyearKnology’s Interconnection Agreement before requesting a conversion. 2.1.10.2 To utilize the CLEC to CLEC conversion process, the Loop being converted must be the same Loop type with no requested changes to the Loop, must serve the same end user location from the same serving wire center, and must not require an outside dispatch to provision. 2.1.10.3 The Loops converted to Lightyear Knology pursuant to the CLEC to CLEC conversion process shall be provisioned in the same manner and with the same functionality and options as described in this Attachment for the specific Loop type. Order Coordination (OC) Order Coordination – Time Specific (OC-TS) Test Points DLR Charge for Dispatch and Testing if No Trouble Found SL-1 (Non- Designed) Chargeable Option Chargeable Option Not available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office Document UCL-ND (Non- Designed) Chargeable Option Not Available Not Available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office Unbundled Voice Loops - SL-2 (including 2- and 4-wire UVL) (Designed) Included Chargeable Option Included Included Charged for Dispatch outside Central Office Unbundled Digital Loop (Designed) Included Chargeable Option (except on Universal Digital Channel) Included (where appropriate) Included Charged for Dispatch outside Central Office Unbundled Copper Loop (Designed) Chargeable in accordance with Section 2 Not available Included Included Charged for Dispatch outside Central Office For UVL-SL1 and UCLs, Lightyear Knology must order and will be billed for both OC and OC-TS if requesting OC-TS.

Appears in 1 contract

Sources: Clec Agreement

CLEC to CLEC Conversions for Unbundled Loops. 2.1.10.1 2.1.8.1 The CLEC to CLEC conversion process for unbundled Loops may be used by Lightyear SC Net when converting an existing unbundled Loop from another CLEC for the same end userEnd User. The Loop type being converted must be included in LightyearSC Net’s Interconnection Agreement before requesting a conversion. 2.1.10.2 2.1.8.2 To utilize the CLEC to CLEC conversion process, the Loop being converted must be the same Loop type with no requested changes to the Loop, must serve the same end user End User location from the same serving wire center, and must not require an outside dispatch to provision. 2.1.10.3 2.1.8.3 The Loops converted to Lightyear SC Net pursuant to the CLEC to CLEC conversion process shall be provisioned in the same manner and with the same functionality and options as described in this Attachment for the specific Loop type. AMENDMENT EXHIBIT 1 2.1.8.4 Order Coordination (OC) Order Coordination – Time Specific (OC-TS) Test Points DLR Charge for Dispatch and Testing if No Trouble Found SL-1 (Non- Designed) Chargeable Option Chargeable Option Not available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office UCL-ND (Non- Designed) Chargeable Option Not Available Not Available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office Unbundled Voice Loops - SL-2 (including 2- and 4-wire UVL) (Designed) Included Chargeable Option Included Included Charged for Dispatch outside Central Office Unbundled Digital Loop (Designed) Included Chargeable Option (except on Universal Digital Channel) Included (where appropriate) Included Charged for Dispatch outside Central Office Unbundled Copper Loop (Designed) Chargeable in accordance with Section 2 Not available Included Included Charged for Dispatch outside Central Office For UVL-SL1 and UCLs, Lightyear SC Net must order and will be billed for both OC and OC-TS if requesting OC-TS.

Appears in 1 contract

Sources: Interconnection Agreement

CLEC to CLEC Conversions for Unbundled Loops. 2.1.10.1 The CLEC to CLEC conversion process for unbundled Loops may be used by Lightyear NTBS when converting an existing unbundled Loop from another CLEC for the same end user. The Loop type being converted must be included in LightyearNTBS’s Interconnection Agreement before requesting a conversion. 2.1.10.2 To utilize the CLEC to CLEC conversion process, the Loop being converted must be the same Loop type with no requested changes to the Loop, must serve the same end user location from the same serving wire center, and must not require an outside dispatch to provision. 2.1.10.3 The Loops converted to Lightyear NTBS pursuant to the CLEC to CLEC conversion process shall be provisioned in the same manner and with the same functionality and options as described in this Attachment for the specific Loop type. Order Coordination (OC) Order Coordination – Time Specific (OC-TS) Test Points DLR Charge for Dispatch and Testing if No Trouble Found SL-1 (Non- Designed) Chargeable Option Chargeable Option Not available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office UCL-ND (Non- Designed) Chargeable Option Not Available Not Available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office Unbundled Voice Loops - SL-2 (including 2- and 4-wire UVL) (Designed) Included Chargeable Option Included Included Charged for Dispatch outside Central Office Unbundled Digital Loop (Designed) Included Chargeable Option (except on Universal Digital Channel) Included (where appropriate) Included Charged for Dispatch outside Central Office Unbundled Copper Loop (Designed) Chargeable in accordance with Section 2 Not available Included Included Charged for Dispatch outside Central Office For UVL-SL1 and UCLs, Lightyear NTBS must order and will be billed for both OC and OC-TS if requesting OC-TS.

Appears in 1 contract

Sources: Clec Agreement

CLEC to CLEC Conversions for Unbundled Loops. 2.1.10.1 2.1.8.1 The CLEC to CLEC conversion process for unbundled Loops may be used by Lightyear VarTec when converting an existing unbundled Loop from another CLEC for the same end userEnd User. The Loop type being converted must be included in LightyearVarTec’s Interconnection Agreement before requesting a conversion. 2.1.10.2 2.1.8.2 To utilize the CLEC to CLEC conversion process, the Loop being converted must be the same Loop type with no requested changes to the Loop, must serve the same end user End User location from the same serving wire center, and must not require an outside dispatch to provision. 2.1.10.3 2.1.8.3 The Loops converted to Lightyear VarTec pursuant to the CLEC to CLEC conversion process shall be provisioned in the same manner and with the same functionality and options as described in this Attachment for the specific Loop type. AMENDMENT EXHIBIT 1 2.1.8.4 Order Coordination (OC) Order Coordination – Time Specific (OC-TS) Test Points DLR Charge for Dispatch and Testing if No Trouble Found SL-1 (Non- Designed) Chargeable Option Chargeable Option Not available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office UCL-ND (Non- Designed) Chargeable Option Not Available Not Available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office Unbundled Voice Loops - SL-2 (including 2- and 4-wire UVL) (Designed) Included Chargeable Option Included Included Charged for Dispatch outside Central Office Unbundled Digital Loop (Designed) Included Chargeable Option (except on Universal Digital Channel) Included (where appropriate) Included Charged for Dispatch outside Central Office Unbundled Copper Loop (Designed) Chargeable in accordance with Section 2 Not available Included Included Charged for Dispatch outside Central Office For UVL-SL1 and UCLs, Lightyear VarTec must order and will be billed for both OC and OC-TS if requesting OC-TS.

Appears in 1 contract

Sources: Interconnection Agreement

CLEC to CLEC Conversions for Unbundled Loops. 2.1.10.1 The CLEC to CLEC conversion process for unbundled Loops may be used by Lightyear Navigator when converting an existing unbundled Loop from another CLEC for the same end user. The Loop type being converted must be included in LightyearNavigator’s Interconnection Agreement before requesting a conversion. 2.1.10.2 To utilize the CLEC to CLEC conversion process, the Loop being converted must be the same Loop type with no requested changes to the Loop, must serve the same end user location from the same serving wire center, and must not require an outside dispatch to provision. 2.1.10.3 The Loops converted to Lightyear Navigator pursuant to the CLEC to CLEC conversion process shall be provisioned in the same manner and with the same functionality and options as described in this Attachment for the specific Loop type. Order Coordination (OC) Order Coordination – Time Specific (OC-TS) Test Points DLR Charge for Dispatch and Testing if No Trouble Found SL-1 (Non- Designed) Chargeable Option Chargeable Option Not available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office UCL-ND (Non- Designed) Chargeable Option Not Available Not Available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office Unbundled Voice Loops - SL-2 (including 2- and 4-wire UVL) (Designed) Included Chargeable Option Included Included Charged for Dispatch outside Central Office Unbundled Digital Loop (Designed) Included Chargeable Option (except on Universal Digital Channel) Included (where appropriate) Included Charged for Dispatch outside Central Office Unbundled Copper Loop (Designed) Chargeable in accordance with Section 2 Not available Included Included Charged for Dispatch outside Central Office For UVL-SL1 and UCLs, Lightyear Navigator must order and will be billed for both OC and OC-TS if requesting OC-TS.

Appears in 1 contract

Sources: Telecommunications

CLEC to CLEC Conversions for Unbundled Loops. 2.1.10.1 2.1.8.1 The CLEC to CLEC conversion process for unbundled Loops may be used by Lightyear TCG when converting an existing unbundled Loop from another CLEC for the same end userEnd User. The Loop type being converted must be included in LightyearTCG’s Interconnection Agreement before requesting a conversion. 2.1.10.2 2.1.8.2 To utilize the CLEC to CLEC conversion process, the Loop being converted must be the same Loop type with no requested changes to the Loop, must serve the same end user End User location from the same serving wire center, and must not require an outside dispatch to provision. 2.1.10.3 2.1.8.3 The Loops converted to Lightyear TCG pursuant to the CLEC to CLEC conversion process shall be provisioned in the same manner and with the same functionality and options as described in this Attachment for the specific Loop type, with the exception of LNP, over which BellSouth has no control in a CLEC to CLEC loop conversion. Such conversions shall be done in an interval no longer than conversions from a CLEC to BellSouth (i.e., winback). 2.1 8.4 Order Coordination (OC) Order Coordination – Time Specific (OC-TS) Test Points DLR Charge for Dispatch and Testing if No Trouble Found SL-1 (Non- Designed) Chargeable Option Chargeable Option Not available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office UCL-ND (Non- Designed) Chargeable Option Not Available Not Available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office Unbundled Voice Loops - SL-2 (including 2- and 4-wire UVL) (Designed) Included Chargeable Option Included Included Charged for Dispatch outside Central Office Unbundled Digital Loop (Designed) Included Chargeable Option (except on Universal Digital Channel) Included (where appropriate) Included Charged for Dispatch outside Central Office Unbundled Copper Loop (Designed) Chargeable in accordance with Section 2 Not available Included Included Charged for Dispatch outside Central Office For UVL-SL1 and UCLs, Lightyear TCG must order and will be billed for both OC and OC-TS if requesting OC-TS.

Appears in 1 contract

Sources: Interconnection Agreement

CLEC to CLEC Conversions for Unbundled Loops. 2.1.10.1 The CLEC to CLEC conversion process for unbundled Loops may be used by Lightyear Micro-Comm when converting an existing unbundled Loop from another CLEC for the same end user. The Loop type being converted must be included in LightyearMicro- Comm’s Interconnection Agreement before requesting a conversion. 2.1.10.2 To utilize the CLEC to CLEC conversion process, the Loop being converted must be the same Loop type with no requested changes to the Loop, must serve the same end user location from the same serving wire center, and must not require an outside dispatch to provision. 2.1.10.3 The Loops converted to Lightyear Micro-Comm pursuant to the CLEC to CLEC conversion process shall be provisioned in the same manner and with the same functionality and options as described in this Attachment for the specific Loop type. Order Coordination (OC) Order Coordination – Time Specific (OC-TS) Test Points DLR Charge for Dispatch and Testing if No Trouble Found SL-1 (Non- Designed) Chargeable Option Chargeable Option Not available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office UCL-ND (Non- Designed) Chargeable Option Not Available Not Available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office Unbundled Voice Loops - SL-2 (including 2- and 4-wire UVL) (Designed) Included Chargeable Option Included Included Charged for Dispatch outside Central Office Unbundled Digital Loop (Designed) Included Chargeable Option (except on Universal Digital Channel) Included (where appropriate) Included Charged for Dispatch outside Central Office Unbundled Copper Loop (Designed) Chargeable in accordance with Section 2 Not available Included Included Charged for Dispatch outside Central Office For UVL-SL1 and UCLs, Lightyear Micro-Comm must order and will be billed for both OC and OC-TS if requesting OC-OC- TS.

Appears in 1 contract

Sources: Clec Agreement

CLEC to CLEC Conversions for Unbundled Loops. 2.1.10.1 The CLEC to CLEC conversion process for unbundled Loops may be used by Lightyear ▇▇▇▇ Communications when converting an existing unbundled Loop from another CLEC for the same end user. The Loop type being converted must be included in Lightyear▇▇▇▇ Communications’s Interconnection Agreement before requesting a conversion. 2.1.10.2 To utilize the CLEC to CLEC conversion process, the Loop being converted must be the same Loop type with no requested changes to the Loop, must serve the same end user location from the same serving wire center, and must not require an outside dispatch to provision. 2.1.10.3 The Loops converted to Lightyear ▇▇▇▇ Communications pursuant to the CLEC to CLEC conversion process shall be provisioned in the same manner and with the same functionality and options as described in this Attachment for the specific Loop type. Order Coordination (OC) Order Coordination – Time Specific (OC-TS) Test Points DLR Charge for Dispatch and Testing if No Trouble Found SL-1 (Non- Designed) Chargeable Option Chargeable Option Not available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office UCL-ND (Non- Designed) Chargeable Option Not Available Not Available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office Unbundled Voice Loops - SL-2 (including 2- and 4-wire UVL) (Designed) Included Chargeable Option Included Included Charged for Dispatch outside Central Office Unbundled Digital Loop (Designed) Included Chargeable Option (except on Universal Digital Channel) Included (where appropriate) Included Charged for Dispatch outside Central Office Unbundled Copper Loop (Designed) Chargeable in accordance with Section 2 Not available Included Included Charged for Dispatch outside Central Office For UVL-SL1 and UCLs, Lightyear ▇▇▇▇ Communications must order and will be billed for both OC and OC-TS if requesting OC-TS.

Appears in 1 contract

Sources: Clec Agreement

CLEC to CLEC Conversions for Unbundled Loops. 2.1.10.1 2.1.8.1 The CLEC to CLEC conversion process for unbundled Loops may be used by Lightyear WorldxChange when converting an existing unbundled Loop from another CLEC for the same end userEnd User. The Loop type being converted must be included in LightyearWorldxChange’s Interconnection Agreement before requesting a conversion. 2.1.10.2 2.1.8.2 To utilize the CLEC to CLEC conversion process, the Loop being converted must be the same Loop type with no requested changes to the Loop, must serve the same end user End User location from the same serving wire center, and must not require an outside dispatch to provision. 2.1.10.3 2.1.8.3 The Loops converted to Lightyear WorldxChange pursuant to the CLEC to CLEC conversion process shall be provisioned in the same manner and with the same functionality and options as described in this Attachment for the specific Loop type. Order Coordination (OC) Order Coordination – Time Specific (OC-TS) Test Points DLR Charge for Dispatch and Testing if No Trouble Found SL-1 (Non- Designed) Chargeable Option Chargeable Option Not available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office UCL-ND (Non- Designed) Chargeable Option Not Available Not Available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office Unbundled Voice Loops - SL-2 SL2 (including 2- and 4-wire 2 & 4W UVL) (Designed) Included Chargeable Option Included Included Charged for Dispatch outside Central Office Unbundled Digital Loop (Designed) Included Chargeable Option (except on Universal Digital Channel) Included (where appropriate) Included Charged for Dispatch outside Central Office Unbundled Copper Loop (Designed) Chargeable in accordance with Section 2 Not available Included Included Charged for Dispatch outside Central Office For UVL-SL1 and UCLs, Lightyear WorldxChange must order and & will be billed for both OC and OC-TS if requesting OC-TS.

Appears in 1 contract

Sources: Clec Agreement

CLEC to CLEC Conversions for Unbundled Loops. 2.1.10.1 2.1.8.1 The CLEC to CLEC conversion process for unbundled Loops may be used by Lightyear AT&T when converting an existing unbundled Loop from another CLEC for the same end user. The Loop type being converted must be included in LightyearAT&T’s Interconnection Agreement before requesting a conversion. 2.1.10.2 2.1.8.2 To utilize the CLEC to CLEC conversion process, the Loop being converted must be the same Loop type with no requested changes to the Loop, must serve the same end user location from the same serving wire center, and must not require an outside dispatch to provision. 2.1.10.3 2.1.8.3 The Loops converted to Lightyear AT&T pursuant to the CLEC to CLEC conversion process shall be provisioned in the same manner and with the same functionality and options as described in this Attachment for the specific Loop type, with the exception of LNP, over which BellSouth has no control in a CLEC to CLEC loop conversion. Such conversions shall be done in an interval no longer than conversions from a CLEC to BellSouth (i.e., winback). 2.1 8.4 Order Coordination (OC) Order Coordination – Time Specific (OC-TS) Test Points DLR Charge for Dispatch and Testing if No Trouble Found SL-1 (Non- Designed) Chargeable Option Chargeable Option Not available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office UCL-ND (Non- Designed) Chargeable Option Not Available Not Available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office Unbundled Voice Loops - SL-2 (including 2- and 4-wire UVL) (Designed) Included Chargeable Option Included Included Charged for Dispatch outside Central Office Unbundled Digital Loop (Designed) Included Chargeable Option (except on Universal Digital Channel) Included (where appropriate) Included Charged for Dispatch outside Central Office Unbundled Copper Loop (Designed) Chargeable in accordance with Section 2 Not available Included Included Charged for Dispatch outside Central Office For UVL-SL1 and UCLs, Lightyear AT&T must order and will be billed for both OC and OC-TS if requesting OC-TS.

Appears in 1 contract

Sources: Clec Agreement

CLEC to CLEC Conversions for Unbundled Loops. 2.1.10.1 The CLEC to CLEC conversion process for unbundled Loops may be used by Lightyear GulfPines when converting an existing unbundled Loop from another CLEC for the same end user. The Loop type being converted must be included in Lightyear’s GulfPines’ Interconnection Agreement before requesting a conversion. 2.1.10.2 To utilize the CLEC to CLEC conversion process, the Loop being converted must be the same Loop type with no requested changes to the Loop, must serve the same end user location from the same serving wire center, and must not require an outside dispatch to provision. 2.1.10.3 The Loops converted to Lightyear GulfPines pursuant to the CLEC to CLEC conversion process shall be provisioned in the same manner and with the same functionality and options as described in this Attachment for the specific Loop type. Order Coordination (OC) Order Coordination – Time Specific (OC-TS) Test Points DLR Charge for Dispatch and Testing if No Trouble Found SL-1 (Non- Designed) Chargeable Option Chargeable Option Not available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office UCL-ND (Non- Designed) Chargeable Option Not Available Not Available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office Unbundled Voice Loops - SL-2 (including 2- and 4-wire UVL) (Designed) Included Chargeable Option Included Included Charged for Dispatch outside Central Office Unbundled Digital Loop (Designed) Included Chargeable Option (except on Universal Digital Channel) Included (where appropriate) Included Charged for Dispatch outside Central Office Unbundled Copper Loop (Designed) Chargeable in accordance with Section 2 Not available Included Included Charged for Dispatch outside Central Office For UVL-SL1 and UCLs, Lightyear GulfPines must order and will be billed for both OC and OC-TS if requesting OC-TS.

Appears in 1 contract

Sources: Interconnection Agreement

CLEC to CLEC Conversions for Unbundled Loops. 2.1.10.1 The CLEC to CLEC conversion process for unbundled Loops may be used by Lightyear NOW when converting an existing unbundled Loop from another CLEC for the same end user. The Loop type being converted must be included in LightyearNOW’s Interconnection Agreement before requesting a conversion. 2.1.10.2 To utilize the CLEC to CLEC conversion process, the Loop being converted must be the same Loop type with no requested changes to the Loop, must serve the same end user location from the same serving wire center, and must not require an outside dispatch to provision. 2.1.10.3 The Loops converted to Lightyear NOW pursuant to the CLEC to CLEC conversion process shall be provisioned in the same manner and with the same functionality and options as described in this Attachment for the specific Loop type. Order Coordination (OC) Order Coordination – Time Specific (OC-TS) Test Points DLR Charge for Dispatch and Testing if No Trouble Found SL-1 (Non- Designed) Chargeable Option Chargeable Option Not available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office Document UCL-ND (Non- Designed) Chargeable Option Not Available Not Available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office Unbundled Voice Loops - SL-2 (including 2- and 4-wire UVL) (Designed) Included Chargeable Option Included Included Charged for Dispatch outside Central Office Unbundled Digital Loop (Designed) Included Chargeable Option (except on Universal Digital Channel) Included (where appropriate) Included Charged for Dispatch outside Central Office Unbundled Copper Loop (Designed) Chargeable in accordance with Section 2 Not available Included Included Charged for Dispatch outside Central Office For UVL-SL1 and UCLs, Lightyear NOW must order and will be billed for both OC and OC-TS if requesting OC-TS.

Appears in 1 contract

Sources: Clec Agreement

CLEC to CLEC Conversions for Unbundled Loops. 2.1.10.1 2.1.8.1 The CLEC to CLEC conversion process for unbundled Loops may be used by Lightyear FLATEL when converting an existing unbundled Loop from another CLEC for the same end userEnd User. The Loop type being converted must be included in LightyearFLATEL’s Interconnection Agreement before requesting a conversion. 2.1.10.2 2.1.8.2 To utilize the CLEC to CLEC conversion process, the Loop being converted must be the same Loop type with no requested changes to the Loop, must serve the same end user End User location from the same serving wire center, and must not require an outside dispatch to provision. 2.1.10.3 2.1.8.3 The Loops converted to Lightyear FLATEL pursuant to the CLEC to CLEC conversion process shall be provisioned in the same manner and with the same functionality and options as described in this Attachment for the specific Loop type. Order Coordination (OC) Order Coordination – Time Specific (OC-TS) Test Points DLR Charge for Dispatch and Testing if No Trouble Found SL-1 (Non- Designed) Chargeable Option Chargeable Option Not available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office UCL-ND (Non- Designed) Chargeable Option Not Available Not Available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office Unbundled Voice Loops - SL-2 (including 2- and 4-wire UVL) (Designed) Included Chargeable Option Included Included Charged for Dispatch outside Central Office Unbundled Digital Loop (Designed) Included Chargeable Option (except on Universal Digital Channel) Included (where appropriate) Included Charged for Dispatch outside Central Office Unbundled Copper Loop (Designed) Chargeable in accordance with Section 2 Not available Included Included Charged for Dispatch outside Central Office For UVL-SL1 and UCLs, Lightyear FLATEL must order and will be billed for both OC and OC-TS if requesting OC-TS.

Appears in 1 contract

Sources: Interconnection Agreement

CLEC to CLEC Conversions for Unbundled Loops. 2.1.10.1 The CLEC to CLEC conversion process for unbundled Loops may be used by Lightyear World Access when converting an existing unbundled Loop from another CLEC for the same end user. The Loop type being converted must be included in LightyearWorld Access’s Interconnection Agreement before requesting a conversion. 2.1.10.2 To utilize the CLEC to CLEC conversion process, the Loop being converted must be the same Loop type with no requested changes to the Loop, must serve the same end user location from the same serving wire center, and must not require an outside dispatch to provision. 2.1.10.3 The Loops converted to Lightyear World Access pursuant to the CLEC to CLEC conversion process shall be provisioned in the same manner and with the same functionality and options as described in this Attachment for the specific Loop type. Order Coordination (OC) Order Coordination – Time Specific (OC-TS) Test Points DLR Charge for Dispatch and Testing if No Trouble Found SL-1 (Non- Designed) Chargeable Option Chargeable Option Not available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office UCL-ND (Non- Designed) Chargeable Option Not Available Not Available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office Unbundled Voice Loops - SL-2 (including 2- and 4-wire UVL) (Designed) Included Chargeable Option Included Included Charged for Dispatch outside Central Office Unbundled Digital Loop (Designed) Included Chargeable Option (except on Universal Digital Channel) Included (where appropriate) Included Charged for Dispatch outside Central Office Unbundled Copper Loop (Designed) Chargeable in accordance with Section 2 Not available Included Included Charged for Dispatch outside Central Office For UVL-SL1 and UCLs, Lightyear World Access must order and will be billed for both OC and OC-TS if requesting OC-TS.

Appears in 1 contract

Sources: Clec Agreement

CLEC to CLEC Conversions for Unbundled Loops. 2.1.10.1 2.1.8.1 The CLEC to CLEC conversion process for unbundled Loops may be used by Lightyear Utility USA when converting an existing unbundled Loop from another CLEC for the same end userEnd User. The Loop type being converted must be included in LightyearUtility USA’s Interconnection Agreement before requesting a conversion. 2.1.10.2 2.1.8.2 To utilize the CLEC to CLEC conversion process, the Loop being converted must be the same Loop type with no requested changes to the Loop, must serve the same end user End User location from the same serving wire center, and must not require an outside dispatch to provision. 2.1.10.3 2.1.8.3 The Loops converted to Lightyear Utility USA pursuant to the CLEC to CLEC conversion process shall be provisioned in the same manner and with the same functionality and options as described in this Attachment for the specific Loop type. Order Coordination (OC) Order Coordination – Time Specific (OC-TS) Test Points DLR Charge for Dispatch and Testing if No Trouble Found SL-1 (Non- Designed) Chargeable Option Chargeable Option Not available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office UCL-ND (Non- Designed) Chargeable Option Not Available Not Available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office Unbundled Voice Loops - SL-2 (including 2- and 4-wire UVL) (Designed) Included Chargeable Option Included Included Charged for Dispatch outside Central Office Unbundled Digital Loop (Designed) Included Chargeable Option (except on Universal Digital Channel) Included (where appropriate) Included Charged for Dispatch outside Central Office Unbundled Copper Loop (Designed) Chargeable in accordance with Section 2 Not available Included Included Charged for Dispatch outside Central Office For UVL-SL1 and UCLs, Lightyear Utility USA must order and will be billed for both OC and OC-TS if requesting OC-TS.

Appears in 1 contract

Sources: Interconnection Agreement

CLEC to CLEC Conversions for Unbundled Loops. 2.1.10.1 2.1.8.1 The CLEC to CLEC conversion process for unbundled Loops may be used by Lightyear Georgia Prepaid when converting an existing unbundled Loop from another CLEC for the same end userEnd User. The Loop type being converted must be included in LightyearGeorgia Prepaid’s Interconnection Agreement before requesting a conversion. 2.1.10.2 2.1.8.2 To utilize the CLEC to CLEC conversion process, the Loop being converted must be the same Loop type with no requested changes to the Loop, must serve the same end user End User location from the same serving wire center, and must not require an outside dispatch to provision. 2.1.10.3 2.1.8.3 The Loops converted to Lightyear Georgia Prepaid pursuant to the CLEC to CLEC conversion process shall be provisioned in the same manner and with the same functionality and options as described in this Attachment for the specific Loop type. AMENDMENT EXHIBIT 1 2.1.8.4 Order Coordination (OC) Order Coordination – Time Specific (OC-TS) Test Points DLR Charge for Dispatch and Testing if No Trouble Found SL-1 (Non- Designed) Chargeable Option Chargeable Option Not available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office UCL-ND (Non- Designed) Chargeable Option Not Available Not Available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office Unbundled Voice Loops - SL-2 (including 2- and 4-wire UVL) (Designed) Included Chargeable Option Included Included Charged for Dispatch outside Central Office Unbundled Digital Loop (Designed) Included Chargeable Option (except on Universal Digital Channel) Included (where appropriate) Included Charged for Dispatch outside Central Office Unbundled Copper Loop (Designed) Chargeable in accordance with Section 2 Not available Included Included Charged for Dispatch outside Central Office For UVL-SL1 and UCLs, Lightyear Georgia Prepaid must order and will be billed for both OC and OC-TS if requesting OC-TS.

Appears in 1 contract

Sources: Interconnection Agreement

CLEC to CLEC Conversions for Unbundled Loops. 2.1.10.1 2.1.8.1 The CLEC to CLEC conversion process for unbundled Loops may be used by Lightyear NTBS when converting an existing unbundled Loop from another CLEC for the same end userEnd User. The Loop type being converted must be included in LightyearNTBS’s Interconnection Agreement before requesting a conversion. 2.1.10.2 2.1.8.2 To utilize the CLEC to CLEC conversion process, the Loop being converted must be the same Loop type with no requested changes to the Loop, must serve the same end user End User location from the same serving wire center, and must not require an outside dispatch to provision. 2.1.10.3 2.1.8.3 The Loops converted to Lightyear NTBS pursuant to the CLEC to CLEC conversion process shall be provisioned in the same manner and with the same functionality and options as described in this Attachment for the specific Loop type. Order Coordination (OC) Order Coordination – Time Specific (OC-TS) Test Points DLR Charge for Dispatch and Testing if No Trouble Found SL-1 (Non- Designed) Chargeable Option Chargeable Option Not available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office UCL-ND (Non- Designed) Chargeable Option Not Available Not Available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office Unbundled Voice Loops - SL-2 (including 2- and 4-wire UVL) (Designed) Included Chargeable Option Included Included Charged for Dispatch outside Central Office Unbundled Digital Loop (Designed) Included Chargeable Option (except on Universal Digital Channel) Included (where appropriate) Included Charged for Dispatch outside Central Office Unbundled Copper Loop (Designed) Chargeable in accordance with Section 2 Not available Included Included Charged for Dispatch outside Central Office For UVL-SL1 and UCLs, Lightyear NTBS must order and will be billed for both OC and OC-TS if requesting OC-TS.

Appears in 1 contract

Sources: Interconnection Agreement

CLEC to CLEC Conversions for Unbundled Loops. 2.1.10.1 The CLEC to CLEC conversion process for unbundled Loops may be used by Lightyear Creative Telecom when converting an existing unbundled Loop from another CLEC for the same end user. The Loop type being converted must be included in LightyearCreative Telecom’s Interconnection Agreement before requesting a conversion. 2.1.10.2 To utilize the CLEC to CLEC conversion process, the Loop being converted must be the same Loop type with no requested changes to the Loop, must serve the same end user location from the same serving wire center, and must not require an outside dispatch to provision. 2.1.10.3 The Loops converted to Lightyear Creative Telecom pursuant to the CLEC to CLEC conversion process shall be provisioned in the same manner and with the same functionality and options as described in this Attachment for the specific Loop type. Order Coordination (OC) Order Coordination – Time Specific (OC-TS) Test Points DLR Charge for Dispatch and Testing if No Trouble Found SL-1 (Non- Non-Designed) Chargeable Option Chargeable Option Not available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office UCL-ND (Non- Non-Designed) Chargeable Option Not Available Not Available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office Unbundled Voice Loops - SL-2 (including 2- and 4-wire UVL) (Designed) Included Chargeable Option Included Included Charged for Dispatch outside Central Office Unbundled Digital Loop (Designed) Included Chargeable Option (except on Universal Digital Channel) Included (where appropriate) Included Charged for Dispatch outside Central Office Unbundled Copper Loop (Designed) Chargeable in accordance with Section 2 Not available Included Included Charged for Dispatch outside Central Office For UVL-SL1 and UCLs, Lightyear Creative Telecom must order and will be billed for both OC and OC-TS if requesting OC-OC- TS.

Appears in 1 contract

Sources: Bellsouth® / Clec Agreement

CLEC to CLEC Conversions for Unbundled Loops. 2.1.10.1 2.1.8.1 The CLEC to CLEC conversion process for unbundled Loops may be used by Lightyear Micro-Comm when converting an existing unbundled Loop from another CLEC for the same end userEnd User. The Loop type being converted must be included in LightyearMicro-Comm’s Interconnection Agreement before requesting a conversion. 2.1.10.2 2.1.8.2 To utilize the CLEC to CLEC conversion process, the Loop being converted must be the same Loop type with no requested changes to the Loop, must serve the same end user End User location from the same serving wire center, and must not require an outside dispatch to provision. 2.1.10.3 2.1.8.3 The Loops converted to Lightyear Micro-Comm pursuant to the CLEC to CLEC conversion process shall be provisioned in the same manner and with the same functionality and options as described in this Attachment for the specific Loop type. Order Coordination (OC) Order Coordination – Time Specific (OC-TS) Test Points DLR Charge for Dispatch and Testing if No Trouble Found SL-1 SL1 (Non- Designed) Chargeable Option Chargeable Option Not available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office UCL-ND (Non- Designed) Chargeable Option Not Available Not Available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office Unbundled Voice Loops - SL-2 Loops- SL2 (including 2- and 4-wire & 4W UVL) (Designed) Included Chargeable Option Included Included Charged for Dispatch outside Central Office Unbundled Digital Loop (Designed) Included Chargeable Option (except on Universal Digital Channel) Included (where appropriate) Included Charged for Dispatch outside Central Office Unbundled Copper Loop (Designed) Chargeable in accordance with Section 2 Not available Included Included Charged for Dispatch outside Central Office For UVL-SL1 and UCLs, Lightyear Micro-Comm must order and will be billed for both OC and OC-TS if requesting OC-TS.

Appears in 1 contract

Sources: Interconnection Agreement

CLEC to CLEC Conversions for Unbundled Loops. 2.1.10.1 2.1.8.1 The CLEC to CLEC conversion process for unbundled Loops may be used by Lightyear ABC Telcom when converting an existing unbundled Loop from another CLEC for the same end userEnd User. The Loop type being converted must be included in LightyearABC Telcom’s Interconnection Agreement before requesting a conversion. 2.1.10.2 2.1.8.2 To utilize the CLEC to CLEC conversion process, the Loop being converted must be the same Loop type with no requested changes to the Loop, must serve the same end user End User location from the same serving wire center, and must not require an outside dispatch to provision. 2.1.10.3 2.1.8.3 The Loops converted to Lightyear ABC Telcom pursuant to the CLEC to CLEC conversion process shall be provisioned in the same manner and with the same functionality and options as described in this Attachment for the specific Loop type. Order Order Coordination Test Points DLR Charge for Dispatch Coordination (OC) Order Coordination – Time Specific (OC-TS) Test Points DLR Charge for Dispatch and Testing if No Trouble Found SL-1 (Non- Designed) Chargeable Option Chargeable Option Not available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office UCL-ND (Non- Designed) Chargeable Option Not Available Not Available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office Unbundled Voice Loops - SL-2 (including 2- and 4-wire UVL) (Designed) Included Chargeable Option Included Included Charged for Dispatch outside Central Office Unbundled Digital Loop (Designed) Included Chargeable Option (except on Universal Digital Channel) Included (where appropriate) Included Charged for Dispatch outside Central Office Unbundled Copper Loop (Designed) Chargeable in accordance with Section 2 Not available Included Included Charged for Dispatch outside Central Office For UVL-SL1 and UCLs, Lightyear ABC Telcom must order and will be billed for both OC and OC-TS if requesting OC-TS.

Appears in 1 contract

Sources: Interconnection Agreement

CLEC to CLEC Conversions for Unbundled Loops. 2.1.10.1 The CLEC to CLEC conversion process for unbundled Loops may be used by Lightyear Hopkinsville when converting an existing unbundled Loop from another CLEC for the same end user. The Loop type being converted must be included in LightyearHopkinsville’s Interconnection Agreement before requesting a conversion. 2.1.10.2 To utilize the CLEC to CLEC conversion process, the Loop being converted must be the same Loop type with no requested changes to the Loop, must serve the same end user location from the same serving wire center, and must not require an outside dispatch to provision. 2.1.10.3 The Loops converted to Lightyear Hopkinsville pursuant to the CLEC to CLEC conversion process shall be provisioned in the same manner and with the same functionality and options as described in this Attachment for the specific Loop type. Order Coordination (OC) Order Coordination – Time Specific (OC-TS) Test Points DLR Charge for Dispatch and Testing if No Trouble Found SL-1 (Non- Designed) Chargeable Option Chargeable Option Not available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office UCL-ND (Non- Designed) Chargeable Option Not Available Not Available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office Unbundled Voice Loops - SL-2 (including 2- and 4-wire UVL) (Designed) Included Chargeable Option Included Included Charged for Dispatch outside Central Office Unbundled Digital Loop (Designed) Included Chargeable Option (except on Universal Digital Channel) Included (where appropriate) Included Charged for Dispatch outside Central Office Unbundled Copper Loop (Designed) Chargeable in accordance with Section 2 Not available Included Included Charged for Dispatch outside Central Office For UVL-SL1 and UCLs, Lightyear Hopkinsville must order and will be billed for both OC and OC-TS if requesting OC-TS.

Appears in 1 contract

Sources: Clec Agreement

CLEC to CLEC Conversions for Unbundled Loops. 2.1.10.1 2.1.8.1 The CLEC to CLEC conversion process for unbundled Loops may be used by Lightyear AT&T when converting an existing unbundled Loop from another CLEC for the same end userEnd User. The Loop type being converted must be included in LightyearAT&T’s Interconnection Agreement before requesting a conversion. 2.1.10.2 2.1.8.2 To utilize the CLEC to CLEC conversion process, the Loop being converted must be the same Loop type with no requested changes to the Loop, must serve the same end user End User location from the same serving wire center, and must not require an outside dispatch to provision. 2.1.10.3 2.1.8.3 The Loops converted to Lightyear AT&T pursuant to the CLEC to CLEC conversion process shall be provisioned in the same manner and with the same functionality and options as described in this Attachment for the specific Loop type, with the exception of LNP, over which BellSouth has no control in a CLEC to CLEC loop conversion. Such conversions shall be done in an interval no longer than conversions from a CLEC to BellSouth (i.e., winback). 2.1 8.4 Order Coordination (OC) Order Coordination – Time Specific (OC-TS) Test Points DLR Charge for Dispatch and Testing if No Trouble Found SL-1 (Non- Designed) Chargeable Option Chargeable Option Not available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office UCL-ND (Non- Designed) Chargeable Option Not Available Not Available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office Unbundled Voice Loops - SL-2 (including 2- and 4-wire UVL) (Designed) Included Chargeable Option Included Included Charged for Dispatch outside Central Office Unbundled Digital Loop (Designed) Included Chargeable Option (except on Universal Digital Channel) Included (where appropriate) Included Charged for Dispatch outside Central Office Unbundled Copper Loop (Designed) Chargeable in accordance with Section 2 Not available Included Included Charged for Dispatch outside Central Office For UVL-SL1 and UCLs, Lightyear AT&T must order and will be billed for both OC and OC-TS if requesting OC-TS.

Appears in 1 contract

Sources: Interconnection Agreement

CLEC to CLEC Conversions for Unbundled Loops. 2.1.10.1 2.1.8.1 The CLEC to CLEC conversion process for unbundled Loops may be used by Lightyear NOW when converting an existing unbundled Loop from another CLEC for the same end userEnd User. The Loop type being converted must be included in LightyearNOW’s Interconnection Agreement before requesting a conversion. 2.1.10.2 2.1.8.2 To utilize the CLEC to CLEC conversion process, the Loop being converted must be the same Loop type with no requested changes to the Loop, must serve the same end user End User location from the same serving wire center, and must not require an outside dispatch to provision. 2.1.10.3 2.1.8.3 The Loops converted to Lightyear NOW pursuant to the CLEC to CLEC conversion process shall be provisioned in the same manner and with the same functionality and options as described in this Attachment for the specific Loop type. Order Coordination (OC) Order Coordination – Time Specific (OC-TS) Test Points DLR Charge for Dispatch and Testing if No Trouble Found SL-1 (Non- Designed) Chargeable Option Chargeable Option Not available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office UCL-ND (Non- Designed) Chargeable Option Not Available Not Available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office Unbundled Voice Loops - SL-2 (including 2- and 4-wire UVL) (Designed) Included Chargeable Option Included Included Charged for Dispatch outside Central Office Unbundled Digital Loop (Designed) Included Chargeable Option (except on Universal Digital Channel) Included (where appropriate) Included Charged for Dispatch outside Central Office Unbundled Copper Loop (Designed) Chargeable in accordance with Section 2 Not available Included Included Charged for Dispatch outside Central Office For UVL-SL1 and UCLs, Lightyear NOW must order and will be billed for both OC and OC-TS if requesting OC-TS.

Appears in 1 contract

Sources: Interconnection Agreement

CLEC to CLEC Conversions for Unbundled Loops. 2.1.10.1 The CLEC to CLEC conversion process for unbundled Loops may be used by Lightyear FLATEL when converting an existing unbundled Loop from another CLEC for the same end user. The Loop type being converted must be included in LightyearFLATEL’s Interconnection Agreement before requesting a conversion. 2.1.10.2 To utilize the CLEC to CLEC conversion process, the Loop being converted must be the same Loop type with no requested changes to the Loop, must serve the same end user location from the same serving wire center, and must not require an outside dispatch to provision. 2.1.10.3 The Loops converted to Lightyear FLATEL pursuant to the CLEC to CLEC conversion process shall be provisioned in the same manner and with the same functionality and options as described in this Attachment for the specific Loop type. Order Coordination (OC) Order Coordination – Time Specific (OC-TS) Test Points DLR Charge for Dispatch and Testing if No Trouble Found SL-1 (Non- Designed) Chargeable Option Chargeable Option Not available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office UCL-ND (Non- Designed) Chargeable Option Not Available Not Available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office Unbundled Voice Loops - SL-2 (including 2- and 4-wire UVL) (Designed) Included Chargeable Option Included Included Charged for Dispatch outside Central Office Unbundled Digital Loop (Designed) Included Chargeable Option (except on Universal Digital Channel) Included (where appropriate) Included Charged for Dispatch outside Central Office Unbundled Copper Loop (Designed) Chargeable in accordance with Section 2 Not available Included Included Charged for Dispatch outside Central Office For UVL-SL1 and UCLs, Lightyear FLATEL must order and will be billed for both OC and OC-TS if requesting OC-TS.

Appears in 1 contract

Sources: Clec Agreement

CLEC to CLEC Conversions for Unbundled Loops. 2.1.10.1 The CLEC to CLEC conversion process for unbundled Loops may be used by Lightyear Preferred when converting an existing unbundled Loop from another CLEC for the same end user. The Loop type being converted must be included in LightyearPreferred’s Interconnection Agreement before requesting a conversion. 2.1.10.2 To utilize the CLEC to CLEC conversion process, the Loop being converted must be the same Loop type with no requested changes to the Loop, must serve the same end user location from the same serving wire center, and must not require an outside dispatch to provision. 2.1.10.3 The Loops converted to Lightyear Preferred pursuant to the CLEC to CLEC conversion process shall be provisioned in the same manner and with the same functionality and options as described in this Attachment for the specific Loop type. Order Coordination (OC) Order Coordination – Time Specific (OC-TS) Test Points DLR Charge for Dispatch and Testing if No Trouble Found SL-1 (Non- Designed) Chargeable Option Chargeable Option Not available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office Document UCL-ND (Non- Designed) Chargeable Option Not Available Not Available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office Unbundled Voice Loops - SL-2 (including 2- and 4-wire UVL) (Designed) Included Chargeable Option Included Included Charged for Dispatch outside Central Office Unbundled Digital Loop (Designed) Included Chargeable Option (except on Universal Digital Channel) Included (where appropriate) Included Charged for Dispatch outside Central Office Unbundled Copper Loop (Designed) Chargeable in accordance with Section 2 Not available Included Included Charged for Dispatch outside Central Office For UVL-SL1 and UCLs, Lightyear Preferred must order and will be billed for both OC and OC-TS if requesting OC-TS.

Appears in 1 contract

Sources: Clec Agreement

CLEC to CLEC Conversions for Unbundled Loops. 2.1.10.1 The CLEC to CLEC conversion process for unbundled Loops may be used by Lightyear ▇▇▇.▇▇▇ when converting an existing unbundled Loop from another CLEC for the same end user. The Loop type being converted must be included in Lightyear▇▇▇.▇▇▇’s Interconnection Agreement before requesting a conversion. 2.1.10.2 To utilize the CLEC to CLEC conversion process, the Loop being converted must be the same Loop type with no requested changes to the Loop, must serve the same end user location from the same serving wire center, and must not require an outside dispatch to provision. 2.1.10.3 The Loops converted to Lightyear ▇▇▇.▇▇▇ pursuant to the CLEC to CLEC conversion process shall be provisioned in the same manner and with the same functionality and options as described in this Attachment for the specific Loop type. Order Coordination (OC) Order Coordination – Time Specific (OC-TS) Test Points DLR Charge for Dispatch and Testing if No Trouble Found SL-1 (Non- Designed) Chargeable Option Chargeable Option Not available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office UCL-ND (Non- Designed) Chargeable Option Not Available Not Available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office Unbundled Voice Loops - SL-2 (including 2- and 4-wire UVL) (Designed) Included Chargeable Option Included Included Charged for Dispatch outside Central Office Unbundled Digital Loop (Designed) Included Chargeable Option (except on Universal Digital Channel) Included (where appropriate) Included Charged for Dispatch outside Central Office Unbundled Copper Loop (Designed) Chargeable in accordance with Section 2 Not available Included Included Charged for Dispatch outside Central Office For UVL-SL1 and UCLs, Lightyear ▇▇▇.▇▇▇ must order and will be billed for both OC and OC-TS if requesting OC-TS.

Appears in 1 contract

Sources: Clec Agreement

CLEC to CLEC Conversions for Unbundled Loops. 2.1.10.1 2.1.8.1 The CLEC to CLEC conversion process for unbundled Loops may be used by Lightyear Southern Light when converting an existing unbundled Loop from another CLEC for the same end userEnd User. The Loop type being converted must be included in LightyearSouthern Light’s Interconnection Agreement before requesting a conversion. 2.1.10.2 2.1.8.2 To utilize the CLEC to CLEC conversion process, the Loop being converted must be the same Loop type with no requested changes to the Loop, must serve the same end user End User location from the same serving wire center, and must not require an outside dispatch to provision. 2.1.10.3 2.1.8.3 The Loops converted to Lightyear Southern Light pursuant to the CLEC to CLEC conversion process shall be provisioned in the same manner and with the same functionality and options as described in this Attachment for the specific Loop type. Order Coordination (OC) Order Coordination – Time Specific (OC-TS) Test Points DLR Charge for Dispatch and Testing if No Trouble Found SL-1 (Non- Designed) Chargeable Option Chargeable Option Not available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office UCL-ND (Non- Designed) Chargeable Option Not Available Not Available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office Unbundled Voice Loops - SL-2 (including 2- and 4-wire UVL) (Designed) Included Chargeable Option Included Included Charged for Dispatch outside Central Office Unbundled Digital Loop (Designed) Included Chargeable Option (except on Universal Digital Channel) Included (where appropriate) Included Charged for Dispatch outside Central Office Unbundled Copper Loop (Designed) Chargeable in accordance with Section 2 Not available Included Included Charged for Dispatch outside Central Office For UVL-SL1 and UCLs, Lightyear Southern Light must order and will be billed for both OC and OC-TS if requesting OC-TS.

Appears in 1 contract

Sources: Interconnection Agreement

CLEC to CLEC Conversions for Unbundled Loops. 2.1.10.1 2.1.8.1 The CLEC to CLEC conversion process for unbundled Loops may be used by Lightyear BSE when converting an existing unbundled Loop from another CLEC for the same end userEnd User. The Loop type being converted must be included in LightyearBSE’s Interconnection Agreement before requesting a conversion. 2.1.10.2 2.1.8.2 To utilize the CLEC to CLEC conversion process, the Loop being converted must be the same Loop type with no requested changes to the Loop, must serve the same end user End User location from the same serving wire center, and must not require an outside dispatch to provision. 2.1.10.3 2.1.8.3 The Loops converted to Lightyear BSE pursuant to the CLEC to CLEC conversion process shall be provisioned in the same manner and with the same functionality and options as described in this Attachment for the specific Loop type. Order Coordination (OC) Order Coordination – Time Specific (OC-TS) Test Points DLR Charge for Dispatch and Testing if No Trouble Found SL-1 (Non- Designed) Chargeable Option Chargeable Option Not available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office UCL-ND (Non- Designed) Chargeable Option Not Available Not Available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office Unbundled Voice Loops - SL-2 (including 2- and 4-wire UVL) (Designed) Included Chargeable Option Included Included Charged for Dispatch outside Central Office Unbundled Digital Loop (Designed) Included Chargeable Option (except on Universal Digital Channel) Included (where appropriate) Included Charged for Dispatch outside Central Office Unbundled Copper Loop (Designed) Chargeable in accordance with Section 2 Not available Included Included Charged for Dispatch outside Central Office For UVL-SL1 and UCLs, Lightyear BSE must order and will be billed for both OC and OC-TS if requesting OC-TS.

Appears in 1 contract

Sources: Interconnection Agreement

CLEC to CLEC Conversions for Unbundled Loops. 2.1.10.1 2.1.8.1 The CLEC to CLEC conversion process for unbundled Loops may be used by Lightyear ▇▇▇▇▇▇▇▇.▇▇▇ when converting an existing unbundled Loop from another CLEC for the same end userEnd User. The Loop type being converted must be included in Lightyear▇▇▇▇▇▇▇▇.▇▇▇’s Interconnection Agreement before requesting a conversion. 2.1.10.2 2.1.8.2 To utilize the CLEC to CLEC conversion process, the Loop being converted must be the same Loop type with no requested changes to the Loop, must serve the same end user End User location from the same serving wire center, and must not require an outside dispatch to provision. 2.1.10.3 2.1.8.3 The Loops converted to Lightyear ▇▇▇▇▇▇▇▇.▇▇▇ pursuant to the CLEC to CLEC conversion process shall be provisioned in the same manner and with the same functionality and options as described in this Attachment for the specific Loop type. Order Coordination (OC) Order Coordination – Time Specific (OC-TS) Test Points DLR Charge for Dispatch and Testing if No Trouble Found SL-1 (Non- Designed) Chargeable Option Chargeable Option Not available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office UCL-ND (Non- Designed) Chargeable Option Not Available Not Available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office Unbundled Voice Loops - SL-2 (including 2- and 4-wire UVL) (Designed) Included Chargeable Option Included Included Charged for Dispatch outside Central Office Unbundled Digital Loop (Designed) Included Chargeable Option (except on Universal Digital Channel) Included (where appropriate) Included Charged for Dispatch outside Central Office Unbundled Copper Loop (Designed) Chargeable in accordance with Section 2 Not available Included Included Charged for Dispatch outside Central Office For UVL-SL1 and UCLs, Lightyear ▇▇▇▇▇▇▇▇.▇▇▇ must order and will be billed for both OC and OC-TS if requesting OC-TS.

Appears in 1 contract

Sources: Interconnection Agreement

CLEC to CLEC Conversions for Unbundled Loops. 2.1.10.1 The CLEC to CLEC conversion process for unbundled Loops may be used by Lightyear North Star Telecom when converting an existing unbundled Loop from another CLEC for the same end user. The Loop type being converted must be included in LightyearNorth Star Telecom’s Interconnection Agreement before requesting a conversion. 2.1.10.2 To utilize the CLEC to CLEC conversion process, the Loop being converted must be the same Loop type with no requested changes to the Loop, must serve the same end user location from the same serving wire center, and must not require an outside dispatch to provision. 2.1.10.3 The Loops converted to Lightyear North Star Telecom pursuant to the CLEC to CLEC conversion process shall be provisioned in the same manner and with the same functionality and options as described in this Attachment for the specific Loop type. Order Coordination (OC) Order Coordination – Time Specific (OC-TS) Test Points DLR Charge for Dispatch and Testing if No Trouble Found SL-1 (Non- Designed) Chargeable Option Chargeable Option Not available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office UCL-ND (Non- Designed) Chargeable Option Not Available Not Available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office Unbundled Voice Loops - SL-2 (including 2- and 4-wire UVL) (Designed) Included Chargeable Option Included Included Charged for Dispatch outside Central Office Unbundled Digital Loop (Designed) Included Chargeable Option (except on Universal Digital Channel) Included (where appropriate) Included Charged for Dispatch outside Central Office Unbundled Copper Loop (Designed) Chargeable in accordance with Section 2 Not available Included Included Charged for Dispatch outside Central Office For UVL-SL1 and UCLs, Lightyear North Star Telecom must order and will be billed for both OC and OC-OC- TS if requesting OC-TS.

Appears in 1 contract

Sources: Clec Agreement

CLEC to CLEC Conversions for Unbundled Loops. 2.1.10.1 The CLEC to CLEC conversion process for unbundled Loops may be used by Lightyear NAS when converting an existing unbundled Loop from another CLEC for the same end user. The Loop type being converted must be included in Lightyear’s NAS’ Interconnection Agreement before requesting a conversion. 2.1.10.2 To utilize the CLEC to CLEC conversion process, the Loop being converted must be the same Loop type with no requested changes to the Loop, must serve the same end user location from the same serving wire center, and must not require an outside dispatch to provision. 2.1.10.3 The Loops converted to Lightyear NAS pursuant to the CLEC to CLEC conversion process shall be provisioned in the same manner and with the same functionality and options as described in this Attachment for the specific Loop type. Order Coordination (OC) Order Coordination – Time Specific (OC-TS) Test Points DLR Charge for Dispatch and Testing if No Trouble Found SL-1 (Non- Designed) Chargeable Option Chargeable Option Not available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office UCL-ND (Non- Designed) Chargeable Option Not Available Not Available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office Unbundled Voice Loops - SL-2 (including 2- and 4-wire UVL) (Designed) Included Chargeable Option Included Included Charged for Dispatch outside Central Office Unbundled Digital Loop (Designed) Included Chargeable Option (except on Universal Digital Channel) Included (where appropriate) Included Charged for Dispatch outside Central Office Unbundled Copper Loop (Designed) Chargeable in accordance with Section 2 Not available Included Included Charged for Dispatch outside Central Office For UVL-SL1 and UCLs, Lightyear NAS must order and will be billed for both OC and OC-TS if requesting OC-TS.

Appears in 1 contract

Sources: Clec Agreement

CLEC to CLEC Conversions for Unbundled Loops. 2.1.10.1 2.1.8.1 The CLEC to CLEC conversion process for unbundled Loops may be used by Lightyear Victory when converting an existing unbundled Loop from another CLEC for the same end userEnd User. The Loop type being converted must be included in LightyearVictory’s Interconnection Agreement before requesting a conversion. 2.1.10.2 2.1.8.2 To utilize the CLEC to CLEC conversion process, the Loop being converted must be the same Loop type with no requested changes to the Loop, must serve the same end user End User location from the same serving wire center, and must not require an outside dispatch to provision. 2.1.10.3 2.1.8.3 The Loops converted to Lightyear Victory pursuant to the CLEC to CLEC conversion process shall be provisioned in the same manner and with the same functionality and options as described in this Attachment for the specific Loop type. Order Coordination (OC) Order Coordination – Time Specific (OC-TS) Test Points DLR Charge for Dispatch and Testing if No Trouble Found SL-1 SL1 (Non- Designed) Chargeable Option Chargeable Option Not available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office UCL-ND (Non- Designed) Chargeable Option Not Available Not Available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office Unbundled Voice Loops - SL-2 Loops- SL2 (including 2- and 4-wire & 4W UVL) (Designed) Included Chargeable Option Included Included Charged for Dispatch outside Central Office Unbundled Digital Loop (Designed) Included Chargeable Option (except on Universal Digital Channel) Included (where appropriate) Included Charged for Dispatch outside Central Office Unbundled Copper Loop (Designed) Chargeable in accordance with Section 2 Not available Included Included Charged for Dispatch outside Central Office For UVL-SL1 and UCLs, Lightyear Victory must order and will be billed for both OC and OC-TS if requesting OC-TS.

Appears in 1 contract

Sources: Interconnection Agreement

CLEC to CLEC Conversions for Unbundled Loops. 2.1.10.1 2.1.8.1 The CLEC to CLEC conversion process for unbundled Loops may be used by Lightyear Deland Actel when converting an existing unbundled Loop from another CLEC for the same end userEnd User. The Loop type being converted must be included in LightyearDeland Actel’s Interconnection Agreement before requesting a conversion. 2.1.10.2 2.1.8.2 To utilize the CLEC to CLEC conversion process, the Loop being converted must be the same Loop type with no requested changes to the Loop, must serve the same end user End User location from the same serving wire center, and must not require an outside dispatch to provision. 2.1.10.3 2.1.8.3 The Loops converted to Lightyear Deland Actel pursuant to the CLEC to CLEC conversion process shall be provisioned in the same manner and with the same functionality and options as described in this Attachment for the specific Loop type. Order Coordination (OC) Order Coordination – Time Specific (OC-TS) Test Points DLR Charge for Dispatch and Testing if No Trouble Found SL-1 (Non- Designed) Chargeable Option Chargeable Option Not available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office UCL-ND (Non- Designed) Chargeable Option Not Available Not Available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office Unbundled Voice Loops - SL-2 (including 2- and 4-wire UVL) (Designed) Included Chargeable Option Included Included Charged for Dispatch outside Central Office Unbundled Digital Loop (Designed) Included Chargeable Option (except on Universal Digital Channel) Included (where appropriate) Included Charged for Dispatch outside Central Office Unbundled Copper Loop (Designed) Chargeable in accordance with Section 2 Not available Included Included Charged for Dispatch outside Central Office For UVL-SL1 and UCLs, Lightyear Deland Actel must order and will be billed for both OC and OC-TS if requesting OC-TS.

Appears in 1 contract

Sources: Interconnection Agreement

CLEC to CLEC Conversions for Unbundled Loops. 2.1.10.1 The CLEC to CLEC conversion process for unbundled Loops may be used by Lightyear ▇▇▇▇▇▇▇.▇▇▇ when converting an existing unbundled Loop from another CLEC for the same end user. The Loop type being converted must be included in Lightyear▇▇▇▇▇▇▇.▇▇▇’s Interconnection Agreement before requesting a conversion. 2.1.10.2 To utilize the CLEC to CLEC conversion process, the Loop being converted must be the same Loop type with no requested changes to the Loop, must serve the same end user location from the same serving wire center, and must not require an outside dispatch to provision. 2.1.10.3 The Loops converted to Lightyear ▇▇▇▇▇▇▇.▇▇▇ pursuant to the CLEC to CLEC conversion process shall be provisioned in the same manner and with the same functionality and options as described in this Attachment for the specific Loop type. Order Coordination (OC) Order Coordination – Time Specific (OC-TS) Test Points DLR Charge for Dispatch and Testing if No Trouble Found SL-1 (Non- Designed) Chargeable Option Chargeable Option Not available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office UCL-ND (Non- Designed) Chargeable Option Not Available Not Available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office Unbundled Voice Loops - SL-2 (including 2- and 4-wire UVL) (Designed) Included Chargeable Option Included Included Charged for Dispatch outside Central Office Unbundled Digital Loop (Designed) Included Chargeable Option (except on Universal Digital Channel) Included (where appropriate) Included Charged for Dispatch outside Central Office Unbundled Copper Loop (Designed) Chargeable in accordance with Section 2 Not available Included Included Charged for Dispatch outside Central Office For UVL-SL1 and UCLs, Lightyear ▇▇▇▇▇▇▇.▇▇▇ must order and will be billed for both OC and OC-TS if requesting OC-TS.

Appears in 1 contract

Sources: Clec Agreement

CLEC to CLEC Conversions for Unbundled Loops. 2.1.10.1 2.1.8.1 The CLEC to CLEC conversion process for unbundled Loops may be used by Lightyear Symtelco when converting an existing unbundled Loop from another CLEC for the same end userEnd User. The Loop type being converted must be included in LightyearSymtelco’s Interconnection Agreement before requesting a conversion. 2.1.10.2 2.1.8.2 To utilize the CLEC to CLEC conversion process, the Loop being converted must be the same Loop type with no requested changes to the Loop, must serve the same end user End User location from the same serving wire center, and must not require an outside dispatch to provision. 2.1.10.3 2.1.8.3 The Loops converted to Lightyear Symtelco pursuant to the CLEC to CLEC conversion process shall be provisioned in the same manner and with the same functionality and options as described in this Attachment for the specific Loop type. Order Coordination (OC) Order Coordination – Time Specific (OC-TS) Test Points DLR Charge for Dispatch and Testing if No Trouble Found SL-1 (Non- Designed) Chargeable Option Chargeable Option Not available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office UCL-ND (Non- Designed) Chargeable Option Not Available Not Available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office Unbundled Voice Loops - SL-2 (including 2- and 4-wire UVL) (Designed) Included Chargeable Option Included Included Charged for Dispatch outside Central Office Unbundled Digital Loop (Designed) Included Chargeable Option (except on Universal Digital Channel) Included (where appropriate) Included Charged for Dispatch outside Central Office Unbundled Copper Loop (Designed) Chargeable in accordance with Section 2 Not available Included Included Charged for Dispatch outside Central Office For UVL-SL1 and UCLs, Lightyear Symtelco must order and will be billed for both OC and OC-TS if requesting OC-TS.

Appears in 1 contract

Sources: Interconnection Agreement

CLEC to CLEC Conversions for Unbundled Loops. 2.1.10.1 The CLEC to CLEC conversion process for unbundled Loops may be used by Lightyear EPICUS when converting an existing unbundled Loop from another CLEC for the same end user. The Loop type being converted must be included in Lightyear’s EPICUS’ Interconnection Agreement before requesting a conversion. 2.1.10.2 To utilize the CLEC to CLEC conversion process, the Loop being converted must be the same Loop type with no requested changes to the Loop, must serve the same end user location from the same serving wire center, and must not require an outside dispatch to provision. 2.1.10.3 The Loops converted to Lightyear EPICUS pursuant to the CLEC to CLEC conversion process shall be provisioned in the same manner and with the same functionality and options as described in this Attachment for the specific Loop type. Order Coordination (OC) Order Coordination – Time Specific (OC-TS) Test Points DLR Charge for Dispatch and Testing if No Trouble Found SL-1 (Non- Designed) Chargeable Option Chargeable Option Not available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office UCL-ND (Non- Designed) Chargeable Option Not Available Not Available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office Unbundled Voice Loops - SL-2 (including 2- and 4-wire UVL) (Designed) Included Chargeable Option Included Included Charged for Dispatch outside Central Office Unbundled Digital Loop (Designed) Included Chargeable Option (except on Universal Digital Channel) Included (where appropriate) Included Charged for Dispatch outside Central Office Unbundled Copper Loop (Designed) Chargeable in accordance with Section 2 Not available Included Included Charged for Dispatch outside Central Office For UVL-SL1 and UCLs, Lightyear EPICUS must order and will be billed for both OC and OC-TS if requesting OC-TS.

Appears in 1 contract

Sources: Clec Agreement

CLEC to CLEC Conversions for Unbundled Loops. 2.1.10.1 The CLEC to CLEC conversion process for unbundled Loops may be used by Lightyear GSC when converting an existing unbundled Loop from another CLEC for the same end user. The Loop type being converted must be included in LightyearGSC’s Interconnection Agreement before requesting a conversion. 2.1.10.2 To utilize the CLEC to CLEC conversion process, the Loop being converted must be the same Loop type with no requested changes to the Loop, must serve the same end user location from the same serving wire center, and must not require an outside dispatch to provision. 2.1.10.3 The Loops converted to Lightyear GSC pursuant to the CLEC to CLEC conversion process shall be provisioned in the same manner and with the same functionality and options as described in this Attachment for the specific Loop type. Order Coordination (OC) Order Coordination – Time Specific (OC-TS) Test Points DLR Charge for Dispatch and Testing if No Trouble Found SL-1 (Non- Designed) Chargeable Option Chargeable Option Not available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office Document UCL-ND (Non- Designed) Chargeable Option Not Available Not Available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office Unbundled Voice Loops - SL-2 (including 2- and 4-wire UVL) (Designed) Included Chargeable Option Included Included Charged for Dispatch outside Central Office Unbundled Digital Loop (Designed) Included Chargeable Option (except on Universal Digital Channel) Included (where appropriate) Included Charged for Dispatch outside Central Office Unbundled Copper Loop (Designed) Chargeable in accordance with Section 2 Not available Included Included Charged for Dispatch outside Central Office For UVL-SL1 and UCLs, Lightyear GSC must order and will be billed for both OC and OC-TS if requesting OC-TS.

Appears in 1 contract

Sources: Clec Agreement

CLEC to CLEC Conversions for Unbundled Loops. 2.1.10.1 2.1.8.1 The CLEC to CLEC conversion process for unbundled Loops may be used by Lightyear Advantage Group when converting an existing unbundled Loop from another CLEC for the same end userEnd User. The Loop type being converted must be included in LightyearAdvantage Group’s Interconnection Agreement before requesting a conversion. 2.1.10.2 2.1.8.2 To utilize the CLEC to CLEC conversion process, the Loop being converted must be the same Loop type with no requested changes to the Loop, must serve the same end user End User location from the same serving wire center, and must not require an outside dispatch to provision. 2.1.10.3 2.1.8.3 The Loops converted to Lightyear Advantage Group pursuant to the CLEC to CLEC conversion process shall be provisioned in the same manner and with the same functionality and options as described in this Attachment for the specific Loop type. Order Coordination (OC) Order Coordination – Time Specific (OC-TS) Test Points DLR Charge for Dispatch and Testing if No Trouble Found SL-1 (Non- Designed) Chargeable Option Chargeable Option Not available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office UCL-ND (Non- Designed) Chargeable Option Not Available Not Available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office Unbundled Voice Loops - SL-2 (including 2- and 4-wire UVL) (Designed) Included Chargeable Option Included Included Charged for Dispatch outside Central Office Unbundled Digital Loop (Designed) Included Chargeable Option (except on Universal Digital Channel) Included (where appropriate) Included Charged for Dispatch (Designed) Digital Channel) appropriate) outside Central Office Unbundled Copper Loop (Designed) Chargeable in accordance with Section 2 Not available Included Included Charged for Dispatch outside Central Office For UVL-SL1 and UCLs, Lightyear Advantage Group must order and will be billed for both OC and OC-TS if requesting OC-OC- TS.

Appears in 1 contract

Sources: Interconnection Agreement

CLEC to CLEC Conversions for Unbundled Loops. 2.1.10.1 The CLEC to CLEC conversion process for unbundled Loops may be used by Lightyear IDS Telcom when converting an existing unbundled Loop from another CLEC for the same end user. The Loop type being converted must be included in LightyearIDS Telcom’s Interconnection Agreement before requesting a conversion. 2.1.10.2 To utilize the CLEC to CLEC conversion process, the Loop being converted must be the same Loop type with no requested changes to the Loop, must serve the same end user location from the same serving wire center, and must not require an outside dispatch to provision. 2.1.10.3 The Loops converted to Lightyear IDS Telcom pursuant to the CLEC to CLEC conversion process shall be provisioned in the same manner and with the same functionality and options as described in this Attachment for the specific Loop type. Order Coordination (OC) Order Coordination – Time Specific (OC-TS) Test Points DLR Charge for Dispatch and Testing if No Trouble Found SL-1 (Non- Designed) Chargeable Option Chargeable Option Not available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office UCL-ND (Non- Designed) Chargeable Option Not Available Not Available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office Unbundled Voice Loops - SL-2 (including 2- and 4-wire UVL) (Designed) Included Chargeable Option Included Included Charged for Dispatch outside Central Office Unbundled Digital Loop (Designed) Included Chargeable Option (except on Universal Digital Channel) Included (where appropriate) Included Charged for Dispatch outside Central Office Unbundled Copper Loop (Designed) Chargeable in accordance with Section 2 Not available Included Included Charged for Dispatch outside Central Office For UVL-SL1 and UCLs, Lightyear IDS Telcom must order and will be billed for both OC and OC-TS if requesting OC-TS.

Appears in 1 contract

Sources: Clec Agreement

CLEC to CLEC Conversions for Unbundled Loops. 2.1.10.1 The CLEC to CLEC conversion process for unbundled Loops may be used by Lightyear Globe when converting an existing unbundled Loop from another CLEC for the same end user. The Loop type being converted must be included in LightyearGlobe’s Interconnection Agreement before requesting a conversion. 2.1.10.2 To utilize the CLEC to CLEC conversion process, the Loop being converted must be the same Loop type with no requested changes to the Loop, must serve the same end user location from the same serving wire center, and must not require an outside dispatch to provision. 2.1.10.3 The Loops converted to Lightyear Globe pursuant to the CLEC to CLEC conversion process shall be provisioned in the same manner and with the same functionality and options as described in this Attachment for the specific Loop type. Order Coordination (OC) Order Coordination – Time Specific (OC-TS) Test Points DLR Charge for Dispatch and Testing if No Trouble Found SL-1 (Non- Designed) Chargeable Option Chargeable Option Not available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office Document UCL-ND (Non- Designed) Chargeable Option Not Available Not Available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office Unbundled Voice Loops - SL-2 (including 2- and 4-wire UVL) (Designed) Included Chargeable Option Included Included Charged for Dispatch outside Central Office Unbundled Digital Loop (Designed) Included Chargeable Option (except on Universal Digital Channel) Included (where appropriate) Included Charged for Dispatch outside Central Office Unbundled Copper Loop (Designed) Chargeable in accordance with Section 2 Not available Included Included Charged for Dispatch outside Central Office For UVL-SL1 and UCLs, Lightyear Globe must order and will be billed for both OC and OC-TS if requesting OC-TS.

Appears in 1 contract

Sources: Clec Agreement

CLEC to CLEC Conversions for Unbundled Loops. 2.1.10.1 The CLEC to CLEC conversion process for unbundled Loops may be used by Lightyear Oronoco when converting an existing unbundled Loop from another CLEC for the same end user. The Loop type being converted must be included in LightyearOronoco’s Interconnection Agreement before requesting a conversion. 2.1.10.2 To utilize the CLEC to CLEC conversion process, the Loop being converted must be the same Loop type with no requested changes to the Loop, must serve the same end user location from the same serving wire center, and must not require an outside dispatch to provision. 2.1.10.3 The Loops converted to Lightyear Oronoco pursuant to the CLEC to CLEC conversion process shall be provisioned in the same manner and with the same functionality and options as described in this Attachment for the specific Loop type. Order Coordination (OC) Order Coordination – Time Specific (OC-TS) Test Points DLR Charge for Dispatch and Testing if No Trouble Found SL-1 (Non- Designed) Chargeable Option Chargeable Option Not available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office UCL-ND (Non- Designed) Chargeable Option Not Available Not Available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office Unbundled Voice Loops - SL-2 (including 2- and 4-wire UVL) (Designed) Included Chargeable Option Included Included Charged for Dispatch outside Central Office Unbundled Digital Loop (Designed) Included Chargeable Option (except on Universal Digital Channel) Included (where appropriate) Included Charged for Dispatch outside Central Office Unbundled Copper Loop (Designed) Chargeable in accordance with Section 2 Not available Included Included Charged for Dispatch outside Central Office For UVL-SL1 and UCLs, Lightyear Oronoco must order and will be billed for both OC and OC-TS if requesting OC-TS.

Appears in 1 contract

Sources: Clec Agreement

CLEC to CLEC Conversions for Unbundled Loops. 2.1.10.1 2.1.8.1 The CLEC to CLEC conversion process for unbundled Loops may be used by Lightyear FPB when converting an existing unbundled Loop from another CLEC for the same end userEnd User. The Loop type being converted must be included in LightyearFPB’s Interconnection Agreement before requesting a conversion. 2.1.10.2 2.1.8.2 To utilize the CLEC to CLEC conversion process, the Loop being converted must be the same Loop type with no requested changes to the Loop, must serve the same end user End User location from the same serving wire center, and must not require an outside dispatch to provision. 2.1.10.3 2.1.8.3 The Loops converted to Lightyear FPB pursuant to the CLEC to CLEC conversion process shall be provisioned in the same manner and with the same functionality and options as described in this Attachment for the specific Loop type. Order Coordination (OC) Order Coordination – Time Specific (OC-TS) Test Points DLR Charge for Dispatch and Testing if No Trouble Found SL-1 SL1 (Non- Designed) Chargeable Option Chargeable Option Not available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office UCL-ND (Non- Designed) Chargeable Option Not Available Not Available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office Unbundled Voice Loops - SL-2 Loops- SL2 (including 2- and 4-wire & 4W UVL) (Designed) Included Chargeable Option Included Included Charged for Dispatch outside Central Office Unbundled Digital Loop (Designed) Included Chargeable Option (except on Universal Digital Channel) Included (where appropriate) Included Charged for Dispatch outside Central Office Unbundled Copper Loop (Designed) Chargeable in accordance with Section 2 Not available Included Included Charged for Dispatch outside Central Office For UVL-SL1 and UCLs, Lightyear FPB must order and will be billed for both OC and OC-TS if requesting OC-TS.

Appears in 1 contract

Sources: Interconnection Agreement

CLEC to CLEC Conversions for Unbundled Loops. 2.1.10.1 2.1.8.1 The CLEC to CLEC conversion process for unbundled Loops may be used by Lightyear Excel when converting an existing unbundled Loop from another CLEC for the same end userEnd User. The Loop type being converted must be included in LightyearExcel’s Interconnection Agreement before requesting a conversion. 2.1.10.2 2.1.8.2 To utilize the CLEC to CLEC conversion process, the Loop being converted must be the same Loop type with no requested changes to the Loop, must serve the same end user End User location from the same serving wire center, and must not require an outside dispatch to provision. 2.1.10.3 2.1.8.3 The Loops converted to Lightyear Excel pursuant to the CLEC to CLEC conversion process shall be provisioned in the same manner and with the same functionality and options as described in this Attachment for the specific Loop type. AMENDMENT EXHIBIT 1 2.1.8.4 Order Coordination (OC) Order Coordination – Time Specific (OC-TS) Test Points DLR Charge for Dispatch and Testing if No Trouble Found SL-1 (Non- Designed) Chargeable Option Chargeable Option Not available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office UCL-ND (Non- Designed) Chargeable Option Not Available Not Available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office Unbundled Voice Loops - SL-2 (including 2- and 4-wire UVL) (Designed) Included Chargeable Option Included Included Charged for Dispatch outside Central Office Unbundled Digital Loop (Designed) Included Chargeable Option (except on Universal Digital Channel) Included (where appropriate) Included Charged for Dispatch outside Central Office Unbundled Copper Loop (Designed) Chargeable in accordance with Section 2 Not available Included Included Charged for Dispatch outside Central Office For UVL-SL1 and UCLs, Lightyear Excel must order and will be billed for both OC and OC-TS if requesting OC-TS.

Appears in 1 contract

Sources: Interconnection Agreement

CLEC to CLEC Conversions for Unbundled Loops. 2.1.10.1 The CLEC to CLEC conversion process for unbundled Loops may be used by Lightyear Speedy Reconnect when converting an existing unbundled Loop from another CLEC for the same end user. The Loop type being converted must be included in LightyearSpeedy Reconnect’s Interconnection Agreement before requesting a conversion. 2.1.10.2 To utilize the CLEC to CLEC conversion process, the Loop being converted must be the same Loop type with no requested changes to the Loop, must serve the same end user location from the same serving wire center, and must not require an outside dispatch to provision. 2.1.10.3 The Loops converted to Lightyear Speedy Reconnect pursuant to the CLEC to CLEC conversion process shall be provisioned in the same manner and with the same functionality and options as described in this Attachment for the specific Loop type. Order Coordination (OC) Order Coordination – Time Specific (OC-TS) Test Points DLR Charge for Dispatch and Testing if No Trouble Found SL-1 Chargeable Chargeable Option Not Chargeable Charged for Dispatch (Non- Designed) Chargeable Option Chargeable Option Not available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office UCL-ND (Non- Designed) Chargeable Option Not Available Not Available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office Unbundled Voice Loops - SL-2 (including 2- and 4-wire UVL) (Designed) Included Chargeable Option Included Included Charged for Dispatch outside Central Office Unbundled Digital Loop (Designed) Included Chargeable Option (except on Universal Digital Channel) Included (where appropriate) Included Charged for Dispatch outside Central Office Unbundled Copper Loop (Designed) Chargeable in accordance with Section 2 Not available Included Included Charged for Dispatch outside Central Office For UVL-SL1 and UCLs, Lightyear Speedy Reconnect must order and will be billed for both OC and OC-OC- TS if requesting OC-TS.

Appears in 1 contract

Sources: Bellsouth® / Clec Agreement

CLEC to CLEC Conversions for Unbundled Loops. 2.1.10.1 2.1.8.1 The CLEC to CLEC conversion process for unbundled Loops may be used by Lightyear Freedom when converting an existing unbundled Loop from another CLEC for the same end userEnd User. The Loop type being converted must be included in LightyearFreedom’s Interconnection Agreement before requesting a conversion. 2.1.10.2 2.1.8.2 To utilize the CLEC to CLEC conversion process, the Loop being converted must be the same Loop type with no requested changes to the Loop, must serve the same end user End User location from the same serving wire center, and must not require an outside dispatch to provision. 2.1.10.3 2.1.8.3 The Loops converted to Lightyear Freedom pursuant to the CLEC to CLEC conversion process shall be provisioned in the same manner and with the same functionality and options as described in this Attachment for the specific Loop type. 2.1.8.4 Order Coordination (OC) Order Coordination – Time Specific (OC-TS) Test Points DLR Charge for Dispatch and Testing if No Trouble Found SL-1 (Non- Designed) Chargeable Option Chargeable Option Not available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office UCL-ND (Non- Designed) Chargeable Option Not Available Not Available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office Unbundled Voice Loops - SL-2 (including 2- and 4-wire UVL) (Designed) Included Chargeable Option Included Included Charged for Dispatch outside Central Office Unbundled Digital Loop (Designed) Included Chargeable Option (except on Universal Digital Channel) Included (where appropriate) Included Charged for Dispatch outside Central Office Unbundled Copper Loop (Designed) Chargeable in accordance with Section 2 Not available Included Included Charged for Dispatch outside Central Office For UVL-SL1 and UCLs, Lightyear Freedom must order and will be billed for both OC and OC-TS if requesting OC-TS.

Appears in 1 contract

Sources: Bellsouth® / Clec Agreement

CLEC to CLEC Conversions for Unbundled Loops. 2.1.10.1 2.1.8.1 The CLEC to CLEC conversion process for unbundled Loops may be used by Lightyear PLI when converting an existing unbundled Loop from another CLEC for the same end userEnd User. The Loop type being converted must be included in LightyearPLI’s Interconnection Agreement before requesting a conversion. 2.1.10.2 2.1.8.2 To utilize the CLEC to CLEC conversion process, the Loop being converted must be the same Loop type with no requested changes to the Loop, must serve the same end user End User location from the same serving wire center, and must not require an outside dispatch to provision. 2.1.10.3 2.1.8.3 The Loops converted to Lightyear PLI pursuant to the CLEC to CLEC conversion process shall be provisioned in the same manner and with the same functionality and options as described in this Attachment for the specific Loop type. Order Coordination (OC) Order Coordination – Time Specific (OC-TS) Test Points DLR Charge for Dispatch and Testing if No Trouble Found SL-1 (Non- Designed) Chargeable Option Chargeable Option Not available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office UCL-ND (Non- Designed) Chargeable Option Not Available Not Available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office Unbundled Voice Loops - SL-2 (including 2- and 4-wire UVL) (Designed) Included Chargeable Option Included Included Charged for Dispatch outside Central Office Unbundled Digital Loop (Designed) Included Chargeable Option (except on Universal Digital Channel) Included (where appropriate) Included Charged for Dispatch outside Central Office Unbundled Copper Loop (Designed) Chargeable in accordance with Section 2 Not available Included Included Charged for Dispatch outside Central Office For UVL-SL1 and UCLs, Lightyear PLI must order and will be billed for both OC and OC-TS if requesting OC-TS.

Appears in 1 contract

Sources: Interconnection Agreement

CLEC to CLEC Conversions for Unbundled Loops. 2.1.10.1 2.1.8.1 The CLEC to CLEC conversion process for unbundled Loops may be used by Lightyear Starlink when converting an existing unbundled Loop from another CLEC for the same end userEnd User. The Loop type being converted must be included in LightyearStarlink’s Interconnection Agreement before requesting a conversion. 2.1.10.2 2.1.8.2 To utilize the CLEC to CLEC conversion process, the Loop being converted must be the same Loop type with no requested changes to the Loop, must serve the same end user End User location from the same serving wire center, and must not require an outside dispatch to provision. 2.1.10.3 2.1.8.3 The Loops converted to Lightyear Starlink pursuant to the CLEC to CLEC conversion process shall be provisioned in the same manner and with the same functionality and options as described in this Attachment for the specific Loop type. Order Coordination (OC) Order Coordination – Time Specific (OC-TS) Test Points DLR Charge for Dispatch and Testing if No Trouble Found SL-1 (Non- Designed) Chargeable Option Chargeable Option Not available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office UCL-ND (Non- Designed) Chargeable Option Not Available Not Available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office Unbundled Voice Loops - SL-2 (including 2- and 4-wire UVL) (Designed) Included Chargeable Option Included Included Charged for Dispatch outside Central Office Unbundled Digital Loop (Designed) Included Chargeable Option (except on Universal Digital Channel) Included (where appropriate) Included Charged for Dispatch outside Central Office Unbundled Copper Loop (Designed) Chargeable in accordance with Section 2 Not available Included Included Charged for Dispatch outside Central Office For UVL-SL1 and UCLs, Lightyear Starlink must order and will be billed for both OC and OC-TS if requesting OC-TS.

Appears in 1 contract

Sources: Interconnection Agreement

CLEC to CLEC Conversions for Unbundled Loops. 2.1.10.1 2.1.8.1 The CLEC to CLEC conversion process for unbundled Loops may be used by Lightyear Seven Bridges when converting an existing unbundled Loop from another CLEC for the same end userEnd User. The Loop type being converted must be included in LightyearSeven Bridges’s Interconnection Agreement before requesting a conversion. 2.1.10.2 2.1.8.2 To utilize the CLEC to CLEC conversion process, the Loop being converted must be the same Loop type with no requested changes to the Loop, must serve the same end user End User location from the same serving wire center, and must not require an outside dispatch to provision. 2.1.10.3 2.1.8.3 The Loops converted to Lightyear Seven Bridges pursuant to the CLEC to CLEC conversion process shall be provisioned in the same manner and with the same functionality and options as described in this Attachment for the specific Loop type. AMENDMENT EXHIBIT 1 2.1.8.4 Order Coordination (OC) Order Coordination – Time Specific (OC-TS) Test Points DLR Charge for Dispatch and Testing if No Trouble Found SL-1 (Non- Designed) Chargeable Option Chargeable Option Not available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office UCL-ND (Non- Designed) Chargeable Option Not Available Not Available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office Unbundled Voice Loops - SL-2 (including 2- and 4-wire UVL) (Designed) Included Chargeable Option Included Included Charged for Dispatch outside Central Office Unbundled Digital Loop (Designed) Included Chargeable Option (except on Universal Digital Channel) Included (where appropriate) Included Charged for Dispatch outside Central Office Unbundled Copper Loop (Designed) Chargeable in accordance with Section 2 Not available Included Included Charged for Dispatch outside Central Office For UVL-SL1 and UCLs, Lightyear Seven Bridges must order and will be billed for both OC and OC-TS if requesting OC-TS.

Appears in 1 contract

Sources: Interconnection Agreement

CLEC to CLEC Conversions for Unbundled Loops. 2.1.10.1 2.1.8.1 The CLEC to CLEC conversion process for unbundled Loops may be used by Lightyear BroadRiver when converting an existing unbundled Loop from another CLEC for the same end userEnd User. The Loop type being converted must be included in LightyearBroadRiver’s Interconnection Agreement before requesting a conversion. 2.1.10.2 2.1.8.2 To utilize the CLEC to CLEC conversion process, the Loop being converted must be the same Loop type with no requested changes to the Loop, must serve the same end user End User location from the same serving wire center, and must not require an outside dispatch to provision. 2.1.10.3 2.1.8.3 The Loops converted to Lightyear BroadRiver pursuant to the CLEC to CLEC conversion process shall be provisioned in the same manner and with the same functionality and options as described in this Attachment for the specific Loop type. AMENDMENT EXHIBIT 1 2.1.8.4 Order Coordination (OC) Order Coordination – Time Specific (OC-TS) Test Points DLR Charge for Dispatch and Testing if No Trouble Found SL-1 (Non- Designed) Chargeable Option Chargeable Option Not available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office UCL-ND (Non- Designed) Chargeable Option Not Available Not Available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office Unbundled Voice Loops - SL-2 (including 2- and 4-wire UVL) (Designed) Included Chargeable Option Included Included Charged for Dispatch outside Central Office Unbundled Digital Loop (Designed) Included Chargeable Option (except on Universal Digital Channel) Included (where appropriate) Included Charged for Dispatch outside Central Office Unbundled Copper Loop (Designed) Chargeable in accordance with Section 2 Not available Included Included Charged for Dispatch outside Central Office For UVL-SL1 and UCLs, Lightyear BroadRiver must order and will be billed for both OC and OC-TS if requesting OC-TS.

Appears in 1 contract

Sources: Interconnection Agreement

CLEC to CLEC Conversions for Unbundled Loops. 2.1.10.1 The CLEC to CLEC conversion process for unbundled Loops may be used by Lightyear FPB when converting an existing unbundled Loop from another CLEC for the same end user. The Loop type being converted must be included in LightyearFPB’s Interconnection Agreement before requesting a conversion. 2.1.10.2 To utilize the CLEC to CLEC conversion process, the Loop being converted must be the same Loop type with no requested changes to the Loop, must serve the same end user location from the same serving wire center, and must not require an outside dispatch to provision. 2.1.10.3 The Loops converted to Lightyear FPB pursuant to the CLEC to CLEC conversion process shall be provisioned in the same manner and with the same functionality and options as described in this Attachment for the specific Loop type. Order Coordination (OC) Order Coordination – Time Specific (OC-TS) Test Points DLR Charge for Dispatch and Testing if No Trouble Found SL-1 (Non- Designed) Chargeable Option Chargeable Option Not available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office UCL-ND (Non- Designed) Chargeable Option Not Available Not Available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office Unbundled Voice Loops - SL-2 (including 2- and 4-wire UVL) (Designed) Included Chargeable Option Included Included Charged for Dispatch outside Central Office Unbundled Digital Loop (Designed) Included Chargeable Option (except on Universal Digital Channel) Included (where appropriate) Included Charged for Dispatch outside Central Office Unbundled Copper Loop (Designed) Chargeable in accordance with Section 2 Not available Included Included Charged for Dispatch outside Central Office For UVL-SL1 and UCLs, Lightyear FPB must order and will be billed for both OC and OC-TS if requesting OC-TS.

Appears in 1 contract

Sources: Clec Agreement

CLEC to CLEC Conversions for Unbundled Loops. 2.1.10.1 2.1.8.1 The CLEC to CLEC conversion process for unbundled Loops may be used by Lightyear EZ Phone when converting an existing unbundled Loop from another CLEC for the same end userEnd User. The Loop type being converted must be included in LightyearEZ Phone’s Interconnection Agreement before requesting a conversion. 2.1.10.2 2.1.8.2 To utilize the CLEC to CLEC conversion process, the Loop being converted must be the same Loop type with no requested changes to the Loop, must serve the same end user End User location from the same serving wire center, and must not require an outside dispatch to provision. 2.1.10.3 2.1.8.3 The Loops converted to Lightyear EZ Phone pursuant to the CLEC to CLEC conversion process shall be provisioned in the same manner and with the same functionality and options as described in this Attachment for the specific Loop type. Order Coordination (OC) Order Coordination – Time Specific (OC-TS) Test Points DLR Charge for Dispatch and Testing if No Trouble Found SL-1 (Non- Designed) Chargeable Option Chargeable Option Not available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office UCL-ND (Non- Designed) Chargeable Option Not Available Not Available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office Unbundled Voice Loops - SL-2 (including 2- and 4-wire UVL) (Designed) Included Chargeable Option Included Included Charged for Dispatch outside Central Office Unbundled Digital Loop (Designed) Included Chargeable Option (except on Universal Digital Channel) Included (where appropriate) Included Charged for Dispatch outside Central Office Unbundled Copper Loop (Designed) Chargeable in accordance with Section 2 Not available Included Included Charged for Dispatch outside Central Office For UVL-SL1 and UCLs, Lightyear EZ Phone must order and will be billed for both OC and OC-TS if requesting OC-TS.

Appears in 1 contract

Sources: Interconnection Agreement

CLEC to CLEC Conversions for Unbundled Loops. 2.1.10.1 2.1.8.1 The CLEC to CLEC conversion process for unbundled Loops may be used by Lightyear AmeriMex when converting an existing unbundled Loop from another CLEC for the same end userEnd User. The Loop type being converted must be included in LightyearAmeriMex’s Interconnection Agreement before requesting a conversion. 2.1.10.2 2.1.8.2 To utilize the CLEC to CLEC conversion process, the Loop being converted must be the same Loop type with no requested changes to the Loop, must serve the same end user End User location from the same serving wire center, and must not require an outside dispatch to provision. 2.1.10.3 2.1.8.3 The Loops converted to Lightyear AmeriMex pursuant to the CLEC to CLEC conversion process shall be provisioned in the same manner and with the same functionality and options as described in this Attachment for the specific Loop type. Order Coordination (OC) Order Coordination – Time Specific (OC-TS) Test Points DLR Charge for Dispatch and Testing if No Trouble Found SL-1 (Non- Designed) Chargeable Option Chargeable Option Not available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office UCL-ND (Non- Designed) Chargeable Option Not Available Not Available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office Unbundled Voice Loops - SL-2 (including 2- and 4-wire UVL) (Designed) Included Chargeable Option Included Included Charged for Dispatch outside Central Office Unbundled Digital Loop (Designed) Included Chargeable Option (except on Universal Digital Channel) Included (where appropriate) Included Charged for Dispatch outside Central Office Unbundled Copper Loop (Designed) Chargeable in accordance with Section 2 Not available Included Included Charged for Dispatch outside Central Office For UVL-SL1 and UCLs, Lightyear AmeriMex must order and will be billed for both OC and OC-TS if requesting OC-TS.

Appears in 1 contract

Sources: Interconnection Agreement

CLEC to CLEC Conversions for Unbundled Loops. 2.1.10.1 The CLEC to CLEC conversion process for unbundled Loops may be used by Lightyear Southern Digital when converting an existing unbundled Loop from another CLEC for the same end user. The Loop type being converted must be included in LightyearSouthern Digital’s Interconnection Agreement before requesting a conversion. 2.1.10.2 To utilize the CLEC to CLEC conversion process, the Loop being converted must be the same Loop type with no requested changes to the Loop, must serve the same end user location from the same serving wire center, and must not require an outside dispatch to provision. 2.1.10.3 The Loops converted to Lightyear Southern Digital pursuant to the CLEC to CLEC conversion process shall be provisioned in the same manner and with the same functionality and options as described in this Attachment for the specific Loop type. 2.1.10.4 For the conversion process, Order Coordination comes standard on 2 Wire Unbundled Voice Loop-SL2, 4 Wire Unbundled Voice Loop, 2 Wire ADSL Compatible Loop, 2 and 4 Wire HDSL Compatible Loop, 2 Wire Unbundled ISDN Loop, 2 Wire Unbundled Universal Digital Channel Loop, 4 Wire Unbundled Digital/DSO (19.2/56/64 kbps), and 4 Unbundled DS1/ISDN Loop. 2.1.10.5 Order Coordination is available as a chargeable option on Unbundled Voice Loop- SL1, Unbundled Copper Loop-Non Designed, and Unbundled Copper Loop- Designed. Order Coordination (OC) Order Coordination – Time Specific (OC-TS) Test Points DLR Charge for Dispatch and Testing if No Trouble Found SL-1 (Non- Designed) Chargeable Option Chargeable Option Not available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office UCL-ND (Non- Designed) Chargeable Option Not Available Not Available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office Unbundled Voice Loops - SL-2 (including 2- and 4-wire UVL) (Designed) Included Chargeable Option Included Included Charged for Dispatch outside Central Office Unbundled Digital Loop (Designed) Included Chargeable Option (except on Universal Digital Channel) Included (where appropriate) Included Charged for Dispatch outside Central Office Unbundled Copper Loop (Designed) Chargeable in accordance with Section 2 Not available Included Included Charged for Dispatch outside Central Office For UVL-SL1 and UCLs, Lightyear Southern Digital must order and will be billed for both OC and OC-TS if requesting OC-TS.

Appears in 1 contract

Sources: Bellsouth® / Clec Agreement

CLEC to CLEC Conversions for Unbundled Loops. 2.1.10.1 The CLEC to CLEC conversion process for unbundled Loops may be used by Lightyear Money To Go when converting an existing unbundled Loop from another CLEC for the same end user. The Loop type being converted must be included in LightyearMoney To Go’s Interconnection Agreement before requesting a conversion. 2.1.10.2 To utilize the CLEC to CLEC conversion process, the Loop being converted must be the same Loop type with no requested changes to the Loop, must serve the same end user location from the same serving wire center, and must not require an outside dispatch to provision. 2.1.10.3 The Loops converted to Lightyear Money To Go pursuant to the CLEC to CLEC conversion process shall be provisioned in the same manner and with the same functionality and options as described in this Attachment for the specific Loop type. Order Coordination (OC) Order Coordination – Time Specific (OC-TS) Test Points DLR Charge for Dispatch and Testing if No Trouble Found SL-1 (Non- Designed) Chargeable Option Chargeable Option Not available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office UCL-ND (Non- Designed) Chargeable Option Not Available Not Available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office Unbundled Voice Loops - SL-2 (including 2- and 4-wire UVL) (Designed) Included Chargeable Option Included Included Charged for Dispatch outside Central Office Unbundled Digital Loop (Designed) Included Chargeable Option (except on Universal Digital Channel) Included (where appropriate) Included Charged for Dispatch outside Central Office Unbundled Copper Loop (Designed) Chargeable in accordance with Section 2 Not available Included Included Charged for Dispatch outside Central Office For UVL-SL1 and UCLs, Lightyear Money To Go must order and will be billed for both OC and OC-TS if requesting OC-OC- TS.

Appears in 1 contract

Sources: Clec Agreement

CLEC to CLEC Conversions for Unbundled Loops. 2.1.10.1 The CLEC to CLEC conversion process for unbundled Loops may be used by Lightyear Nexus when converting an existing unbundled Loop from another CLEC for the same end user. The Loop type being converted must be included in LightyearNexus’s Interconnection Agreement before requesting a conversion. 2.1.10.2 To utilize the CLEC to CLEC conversion process, the Loop being converted must be the same Loop type with no requested changes to the Loop, must serve the same end user location from the same serving wire center, and must not require an outside dispatch to provision. 2.1.10.3 The Loops converted to Lightyear Nexus pursuant to the CLEC to CLEC conversion process shall be provisioned in the same manner and with the same functionality and options as described in this Attachment for the specific Loop type. Order Coordination (OC) Order Coordination – Time Specific (OC-TS) Test Points DLR Charge for Dispatch and Testing if No Trouble Found SL-1 (Non- Designed) Chargeable Option Chargeable Option Not available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office UCL-ND (Non- Designed) Chargeable Option Not Available Not Available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office Unbundled Voice Loops - SL-2 (including 2- and 4-wire UVL) (Designed) Included Chargeable Option Included Included Charged for Dispatch outside Central Office Unbundled Digital Loop (Designed) Included Chargeable Option (except on Universal Digital Channel) Included (where appropriate) Included Charged for Dispatch outside Central Office Unbundled Copper Loop (Designed) Chargeable in accordance with Section 2 Not available Included Included Charged for Dispatch outside Central Office For UVL-SL1 and UCLs, Lightyear Nexus must order and will be billed for both OC and OC-TS if requesting OC-TS.

Appears in 1 contract

Sources: Bellsouth® / Clec Agreement

CLEC to CLEC Conversions for Unbundled Loops. 2.1.10.1 The CLEC to CLEC conversion process for unbundled Loops may be used by Lightyear ABC Telcom when converting an existing unbundled Loop from another CLEC for the same end user. The Loop type being converted must be included in LightyearABC Telcom’s Interconnection Agreement before requesting a conversion. 2.1.10.2 To utilize the CLEC to CLEC conversion process, the Loop being converted must be the same Loop type with no requested changes to the Loop, must serve the same end user location from the same serving wire center, and must not require an outside dispatch to provision. 2.1.10.3 The Loops converted to Lightyear ABC Telcom pursuant to the CLEC to CLEC conversion process shall be provisioned in the same manner and with the same functionality and options as described in this Attachment for the specific Loop type. Order Coordination (OC) Order Coordination – Time Specific (OC-TS) Test Points DLR Charge for Dispatch and Testing if No Trouble Found SL-1 (Non- Designed) Chargeable Option Chargeable Option Not available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office UCL-ND (Non- Designed) Chargeable Option Not Available Not Available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office Unbundled Voice Loops - SL-2 (including 2- and 4-wire UVL) (Designed) Included Chargeable Option Included Included Charged for Dispatch outside Central Office Unbundled Digital Loop (Designed) Included Chargeable Option (except on Universal Digital Channel) Included (where appropriate) Included Charged for Dispatch outside Central Office Unbundled Copper Loop (Designed) Chargeable in accordance with Section 2 Not available Included Included Charged for Dispatch outside Central Office For UVL-SL1 and UCLs, Lightyear ABC Telcom must order and will be billed for both OC and OC-TS if requesting OC-TS.

Appears in 1 contract

Sources: Clec Agreement

CLEC to CLEC Conversions for Unbundled Loops. 2.1.10.1 2.1.8.1 The CLEC to CLEC conversion process for unbundled Loops may be used by Lightyear Tel West when converting an existing unbundled Loop from another CLEC for the same end userEnd User. The Loop type being converted must be included in LightyearTel West’s Interconnection Agreement before requesting a conversion. 2.1.10.2 2.1.8.2 To utilize the CLEC to CLEC conversion process, the Loop being converted must be the same Loop type with no requested changes to the Loop, must serve the same end user End User location from the same serving wire center, and must not require an outside dispatch to provision. 2.1.10.3 2.1.8.3 The Loops converted to Lightyear Tel West pursuant to the CLEC to CLEC conversion process shall be provisioned in the same manner and with the same functionality and options as described in this Attachment for the specific Loop type. Order Coordination (OC) Order Coordination – Time Specific (OC-TS) Test Points DLR Charge for Dispatch and Testing if No Trouble Found SL-1 (Non- Designed) Chargeable Option Chargeable Option Not available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office UCL-ND (Non- Designed) Chargeable Option Not Available Not Available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office Unbundled Voice Loops - SL-2 (including 2- and 4-wire UVL) (Designed) Included Chargeable Option Included Included Charged for Dispatch outside Central Office Unbundled Digital Loop (Designed) Included Chargeable Option (except on Universal Digital Channel) Included (where appropriate) Included Charged for Dispatch outside Central Office Unbundled Copper Loop (Designed) Chargeable in accordance with Section 2 Not available Included Included Charged for Dispatch outside Central Office For UVL-SL1 and UCLs, Lightyear Tel West must order and will be billed for both OC and OC-TS if requesting OC-TS.

Appears in 1 contract

Sources: Interconnection Agreement

CLEC to CLEC Conversions for Unbundled Loops. 2.1.10.1 The CLEC to CLEC conversion process for unbundled Loops may be used by Lightyear Tristar when converting an existing unbundled Loop from another CLEC for the same end user. The Loop type being converted must be included in LightyearTristar’s Interconnection Agreement before requesting a conversion. 2.1.10.2 To utilize the CLEC to CLEC conversion process, the Loop being converted must be the same Loop type with no requested changes to the Loop, must serve the same end user location from the same serving wire center, and must not require an outside dispatch to provision. 2.1.10.3 The Loops converted to Lightyear Tristar pursuant to the CLEC to CLEC conversion process shall be provisioned in the same manner and with the same functionality and options as described in this Attachment for the specific Loop type. Order Coordination (OC) Order Coordination – Time Specific (OC-TS) Test Points DLR Charge for Dispatch and Testing if No Trouble Found SL-1 (Non- Designed) Chargeable Option Chargeable Option Not available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office Document UCL-ND (Non- Designed) Chargeable Option Not Available Not Available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office Unbundled Voice Loops - SL-2 (including 2- and 4-wire UVL) (Designed) Included Chargeable Option Included Included Charged for Dispatch outside Central Office Unbundled Digital Loop (Designed) Included Chargeable Option (except on Universal Digital Channel) Included (where appropriate) Included Charged for Dispatch outside Central Office Unbundled Copper Loop (Designed) Chargeable in accordance with Section 2 Not available Included Included Charged for Dispatch outside Central Office For UVL-SL1 and UCLs, Lightyear Tristar must order and will be billed for both OC and OC-TS if requesting OC-TS.

Appears in 1 contract

Sources: Clec Agreement

CLEC to CLEC Conversions for Unbundled Loops. 2.1.10.1 The CLEC to CLEC conversion process for unbundled Loops may be used by Lightyear PLI when converting an existing unbundled Loop from another CLEC for the same end user. The Loop type being converted must be included in LightyearPLI’s Interconnection Agreement before requesting a conversion. 2.1.10.2 To utilize the CLEC to CLEC conversion process, the Loop being converted must be the same Loop type with no requested changes to the Loop, must serve the same end user location from the same serving wire center, and must not require an outside dispatch to provision. 2.1.10.3 The Loops converted to Lightyear PLI pursuant to the CLEC to CLEC conversion process shall be provisioned in the same manner and with the same functionality and options as described in this Attachment for the specific Loop type. Order Coordination (OC) Order Coordination – Time Specific (OC-TS) Test Points DLR Charge for Dispatch and Testing if No Trouble Found SL-1 (Non- Designed) Chargeable Option Chargeable Option Not available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office UCL-ND (Non- Designed) Chargeable Option Not Available Not Available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office Unbundled Voice Loops - SL-2 (including 2- and 4-wire UVL) (Designed) Included Chargeable Option Included Included Charged for Dispatch outside Central Office Unbundled Digital Loop (Designed) Included Chargeable Option (except on Universal Digital Channel) Included (where appropriate) Included Charged for Dispatch outside Central Office Unbundled Copper Loop (Designed) Chargeable in accordance with Section 2 Not available Included Included Charged for Dispatch outside Central Office For UVL-SL1 and UCLs, Lightyear PLI must order and will be billed for both OC and OC-TS if requesting OC-TS.

Appears in 1 contract

Sources: Clec Agreement

CLEC to CLEC Conversions for Unbundled Loops. 2.1.10.1 2.1.8.1 The CLEC to CLEC conversion process for unbundled Loops may be used by Lightyear ONS when converting an existing unbundled Loop from another CLEC for the same end userEnd User. The Loop type being converted must be included in Lightyear’s Interconnection ONS’ Agreement before requesting a conversion. 2.1.10.2 2.1.8.2 To utilize the CLEC to CLEC conversion process, the Loop being converted must be the same Loop type with no requested changes to the Loop, must serve the same end user End User location from the same serving wire center, and must not require an outside dispatch to provision. 2.1.10.3 2.1.8.3 The Loops converted to Lightyear ONS pursuant to the CLEC to CLEC conversion process shall be provisioned in the same manner and with the same functionality and options as described in this Attachment for the specific Loop type. Order Coordination (OC) Order Coordination – Time Specific (OC-TS) Test Points DLR Charge for Dispatch and Testing if No Trouble Found SL-1 (Non- Designed) Chargeable Option Chargeable Option Not available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office UCL-ND (Non- Designed) Chargeable Option Not Available Not Available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office Unbundled Voice Loops - SL-2 (including 2- and 4-wire UVL) (Designed) Included Chargeable Option Included Included Charged for Dispatch outside Central Office Unbundled Digital Loop (Designed) Included Chargeable Option (except on Universal Digital Channel) Included (where appropriate) Included Charged for Dispatch outside Central Office Unbundled Copper Loop (Designed) Chargeable in accordance with Section 2 Not available Included Included Charged for Dispatch outside Central Office For UVL-SL1 and UCLs, Lightyear ONS must order and will be billed for both OC and OC-TS if requesting OC-TS.

Appears in 1 contract

Sources: Interconnection Agreement

CLEC to CLEC Conversions for Unbundled Loops. 2.1.10.1 The CLEC to CLEC conversion process for unbundled Loops may be used by Lightyear ATI when converting an existing unbundled Loop from another CLEC for the same end user. The Loop type being converted must be included in LightyearATI’s Interconnection Agreement before requesting a conversion. 2.1.10.2 To utilize the CLEC to CLEC conversion process, the Loop being converted must be the same Loop type with no requested changes to the Loop, must serve the same end user location from the same serving wire center, and must not require an outside dispatch to provision. 2.1.10.3 The Loops converted to Lightyear ATI pursuant to the CLEC to CLEC conversion process shall be provisioned in the same manner and with the same functionality and options as described in this Attachment for the specific Loop type. Order Coordination (OC) Order Coordination – Time Specific (OC-TS) Test Points DLR Charge for Dispatch and Testing if No Trouble Found SL-1 (Non- Designed) Chargeable Option Chargeable Option Not available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office UCL-ND (Non- Designed) Chargeable Option Not Available Not Available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office Unbundled Voice Loops - SL-2 (including 2- and 4-wire UVL) (Designed) Included Chargeable Option Included Included Charged for Dispatch outside Central Office Unbundled Digital Loop (Designed) Included Chargeable Option (except on Universal Digital Channel) Included (where appropriate) Included Charged for Dispatch outside Central Office Unbundled Copper Loop (Designed) Chargeable in accordance with Section 2 Not available Included Included Charged for Dispatch outside Central Office For UVL-SL1 and UCLs, Lightyear ATI must order and will be billed for both OC and OC-TS if requesting OC-TS.

Appears in 1 contract

Sources: Clec Agreement

CLEC to CLEC Conversions for Unbundled Loops. 2.1.10.1 2.1.8.1 The CLEC to CLEC conversion process for unbundled Loops may be used by Lightyear Sail Networks when converting an existing unbundled Loop from another CLEC for the same end userEnd User. The Loop type being converted must be included in LightyearSail Networks’s Interconnection Agreement before requesting a conversion. 2.1.10.2 2.1.8.2 To utilize the CLEC to CLEC conversion process, the Loop being converted must be the same Loop type with no requested changes to the Loop, must serve the same end user End User location from the same serving wire center, and must not require an outside dispatch to provision. 2.1.10.3 2.1.8.3 The Loops converted to Lightyear Sail Networks pursuant to the CLEC to CLEC conversion process shall be provisioned in the same manner and with the same functionality and options as described in this Attachment for the specific Loop type. Order Coordination (OC) Order Coordination – Time Specific (OC-TS) Test Points DLR Charge for Dispatch and Testing if No Trouble Found SL-1 (Non- Designed) Chargeable Option Chargeable Option Not available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office UCL-ND (Non- Designed) Chargeable Option Not Available Not Available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office Unbundled Voice Loops - SL-2 (including 2- and 4-wire UVL) (Designed) Included Chargeable Option Included Included Charged for Dispatch outside Central Office Unbundled Digital Loop (Designed) Included Chargeable Option (except on Universal Digital Channel) Included (where appropriate) Included Charged for Dispatch outside Central Office Unbundled Copper Loop (Designed) Chargeable in accordance with Section 2 Not available Included Included Charged for Dispatch outside Central Office For UVL-SL1 and UCLs, Lightyear Sail Networks must order and will be billed for both OC and OC-TS if requesting OC-TS.

Appears in 1 contract

Sources: Interconnection Agreement

CLEC to CLEC Conversions for Unbundled Loops. 2.1.10.1 The CLEC to CLEC conversion process for unbundled Loops may be used by Lightyear ACI when converting an existing unbundled Loop from another CLEC for the same end user. The Loop type being converted must be included in LightyearACI’s Interconnection Agreement before requesting a conversion. 2.1.10.2 To utilize the CLEC to CLEC conversion process, the Loop being converted must be the same Loop type with no requested changes to the Loop, must serve the same end user location from the same serving wire center, and must not require an outside dispatch to provision. 2.1.10.3 The Loops converted to Lightyear ACI pursuant to the CLEC to CLEC conversion process shall be provisioned in the same manner and with the same functionality and options as described in this Attachment for the specific Loop type. Order Coordination (OC) Order Coordination – Time Specific (OC-TS) Test Points DLR Charge for Dispatch and Testing if No Trouble Found SL-1 (Non- Designed) Chargeable Option Chargeable Option Not available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office UCL-ND (Non- Designed) Chargeable Option Not Available Not Available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office Unbundled Voice Loops - SL-2 (including 2- and 4-wire UVL) (Designed) Included Chargeable Option Included Included Charged for Dispatch outside Central Office Unbundled Digital Loop (Designed) Included Chargeable Option (except on Universal Digital Channel) Included (where appropriate) Included Charged for Dispatch outside Central Office Unbundled Copper Loop (Designed) Chargeable in accordance with Section 2 Not available Included Included Charged for Dispatch outside Central Office For UVL-SL1 and UCLs, Lightyear ACI must order and will be billed for both OC and OC-TS if requesting OC-TS.

Appears in 1 contract

Sources: Clec Agreement

CLEC to CLEC Conversions for Unbundled Loops. 2.1.10.1 The CLEC to CLEC conversion process for unbundled Loops may be used by Lightyear Delta Phones when converting an existing unbundled Loop from another CLEC for the same end user. The Loop type being converted must be included in LightyearDelta Phones’s Interconnection Agreement before requesting a conversion. 2.1.10.2 To utilize the CLEC to CLEC conversion process, the Loop being converted must be the same Loop type with no requested changes to the Loop, must serve the same end user location from the same serving wire center, and must not require an outside dispatch to provision. 2.1.10.3 The Loops converted to Lightyear Delta Phones pursuant to the CLEC to CLEC conversion process shall be provisioned in the same manner and with the same functionality and options as described in this Attachment for the specific Loop type. Order Coordination (OC) Order Coordination – Time Specific (OC-TS) Test Points DLR Charge for Dispatch and Testing if No Trouble Found SL-1 (Non- Designed) Chargeable Option Chargeable Option Not available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office UCL-ND (Non- Designed) Chargeable Option Not Available Not Available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office Unbundled Voice Loops - SL-2 (including 2- and 4-wire UVL) (Designed) Included Chargeable Option Included Included Charged for Dispatch outside Central Office Unbundled Digital Loop (Designed) Included Chargeable Option (except on Universal Digital Channel) Included (where appropriate) Included Charged for Dispatch outside Central Office Unbundled Copper Loop (Designed) Chargeable in accordance with Section 2 Not available Included Included Charged for Dispatch outside Central Office For UVL-SL1 and UCLs, Lightyear Delta Phones must order and will be billed for both OC and OC-TS if requesting OC-TS.

Appears in 1 contract

Sources: Clec Agreement

CLEC to CLEC Conversions for Unbundled Loops. 2.1.10.1 The CLEC to CLEC conversion process for unbundled Loops may be used by Lightyear e- Tel when converting an existing unbundled Loop from another CLEC for the same end user. The Loop type being converted must be included in Lightyeare-Tel’s Interconnection Agreement before requesting a conversion. 2.1.10.2 To utilize the CLEC to CLEC conversion process, the Loop being converted must be the same Loop type with no requested changes to the Loop, must serve the same end user location from the same serving wire center, and must not require an outside dispatch to provision. 2.1.10.3 The Loops converted to Lightyear e-Tel pursuant to the CLEC to CLEC conversion process shall be provisioned in the same manner and with the same functionality and options as described in this Attachment for the specific Loop type. Order Coordination (OC) Order Coordination – Time Specific (OC-TS) Test Points DLR Charge for Dispatch and Testing if No Trouble Found SL-1 (Non- Designed) Chargeable Option Chargeable Option Not available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office UCL-ND (Non- Designed) Chargeable Option Not Available Not Available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office Unbundled Voice Loops - SL-2 (including 2- and 4-wire UVL) (Designed) Included Chargeable Option Included Included Charged for Dispatch outside Central Office Unbundled Digital Loop (Designed) Included Chargeable Option (except on Universal Digital Channel) Included (where appropriate) Included Charged for Dispatch outside Central Office Unbundled Copper Loop (Designed) Chargeable in accordance with Section 2 Not available Included Included Charged for Dispatch outside Central Office For UVL-SL1 and UCLs, Lightyear e-Tel must order and will be billed for both OC and OC-TS if requesting OC-TS.

Appears in 1 contract

Sources: Clec Agreement

CLEC to CLEC Conversions for Unbundled Loops. 2.1.10.1 The CLEC to CLEC conversion process for unbundled Loops may be used by Lightyear Dialogica when converting an existing unbundled Loop from another CLEC for the same end user. The Loop type being converted must be included in LightyearDialogica’s Interconnection Agreement before requesting a conversion. 2.1.10.2 To utilize the CLEC to CLEC conversion process, the Loop being converted must be the same Loop type with no requested changes to the Loop, must serve the same end user location from the same serving wire center, and must not require an outside dispatch to provision. 2.1.10.3 The Loops converted to Lightyear Dialogica pursuant to the CLEC to CLEC conversion process shall be provisioned in the same manner and with the same functionality and options as described in this Attachment for the specific Loop type. Order Coordination (OC) Order Coordination – Time Specific (OC-TS) Test Points DLR Charge for Dispatch and Testing if No Trouble Found SL-1 (Non- Designed) Chargeable Option Chargeable Option Not available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office Document UCL-ND (Non- Designed) Chargeable Option Not Available Not Available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office Unbundled Voice Loops - SL-2 (including 2- and 4-wire UVL) (Designed) Included Chargeable Option Included Included Charged for Dispatch outside Central Office Unbundled Digital Loop (Designed) Included Chargeable Option (except on Universal Digital Channel) Included (where appropriate) Included Charged for Dispatch outside Central Office Unbundled Copper Loop (Designed) Chargeable in accordance with Section 2 Not available Included Included Charged for Dispatch outside Central Office For UVL-SL1 and UCLs, Lightyear Dialogica must order and will be billed for both OC and OC-TS if requesting OC-TS.

Appears in 1 contract

Sources: Clec Agreement

CLEC to CLEC Conversions for Unbundled Loops. 2.1.10.1 2.1.8.1 The CLEC to CLEC conversion process for unbundled Loops may be used by Lightyear NationsLink when converting an existing unbundled Loop from another CLEC for the same end userEnd User. The Loop type being converted must be included in LightyearNationsLink’s Interconnection Agreement before requesting a conversion. 2.1.10.2 2.1.8.2 To utilize the CLEC to CLEC conversion process, the Loop being converted must be the same Loop type with no requested changes to the Loop, must serve the same end user End User location from the same serving wire center, and must not require an outside dispatch to provision. 2.1.10.3 2.1.8.3 The Loops converted to Lightyear NationsLink pursuant to the CLEC to CLEC conversion process shall be provisioned in the same manner and with the same functionality and options as described in this Attachment for the specific Loop type. Order Coordination (OC) Order Coordination – Time Specific (OC-TS) Test Points DLR Charge for Dispatch and Testing if No Trouble Found SL-1 (Non- Designed) Chargeable Option Chargeable Option Not available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office UCL-ND (Non- Designed) Chargeable Option Not Available Not Available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office Unbundled Voice Loops - SL-2 (including 2- and 4-wire UVL) (Designed) Included Chargeable Option Included Included Charged for Dispatch outside Central Office Unbundled Digital Loop (Designed) Included Chargeable Option (except on Universal Digital Channel) Included (where appropriate) Included Charged for Dispatch outside Central Office Unbundled Copper Loop (Designed) Chargeable in accordance with Section 2 Not available Included Included Charged for Dispatch outside Central Office For UVL-SL1 and UCLs, Lightyear NationsLink must order and will be billed for both OC and OC-TS if requesting OC-TS.

Appears in 1 contract

Sources: Interconnection Agreement

CLEC to CLEC Conversions for Unbundled Loops. 2.1.10.1 2.1.8.1 The CLEC to CLEC conversion process for unbundled Loops may be used by Lightyear TWTC when converting an existing unbundled Loop from another CLEC for the same end userEnd User. The Loop type being converted must be included in LightyearTWTC’s Interconnection Agreement before requesting a conversion. 2.1.10.2 2.1.8.2 To utilize the CLEC to CLEC conversion process, the Loop being converted must be the same Loop type with no requested changes to the Loop, must serve the same end user End User location from the same serving wire center, and must not require an outside dispatch to provision. 2.1.10.3 2.1.8.3 The Loops converted to Lightyear TWTC pursuant to the CLEC to CLEC conversion process shall be provisioned in the same manner and with the same functionality and options as described in this Attachment for the specific Loop type. Order Coordination (OC) Order Coordination – Time Specific (OC-TS) Test Points DLR Charge for Dispatch and Testing if No Trouble Found SL-1 (Non- Designed) Chargeable Option Chargeable Option Not available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office UCL-ND (Non- Designed) Chargeable Option Not Available Not Available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office Unbundled Voice Loops - SL-2 (including 2- and 4-wire UVL) (Designed) Included Chargeable Option Included Included Charged for Dispatch outside Central Office Unbundled Digital Loop (Designed) Included Chargeable Option (except on Universal Digital Channel) Included (where appropriate) Included Charged for Dispatch outside Central Office Unbundled Copper Loop (Designed) Chargeable in accordance with Section 2 Not available Included Included Charged for Dispatch outside Central Office For UVL-SL1 and UCLs, Lightyear TWTC must order and will be billed for both OC and OC-TS if requesting OC-TS.

Appears in 1 contract

Sources: Interconnection Agreement