Compatibility of Vessel with other Port Facilities Clause Samples

POPULAR SAMPLE Copied 1 times
Compatibility of Vessel with other Port Facilities. If at any time during the Charter Period the Vessel ceases to be compatible with any Primary Terminal, any Designated Terminal or any other terminal within its trading range in accordance with the provisions of Clause 12, Owner and Charterer shall (if requested by either Party) meet and discuss the steps to be taken, if any, to alter or modify the Vessel to rectify such incompatibility. Except where Clause 5.2(c) applies, Charterer shall be liable for the costs of, and time taken for, any rectification where such incompatibility arises due to any alteration or modification at any such terminal after the Delivery Date, and Owner shall be liable for the costs of, and time taken for, such rectification where such incompatibility arises (either before or after the Delivery Date) due to any modification or alteration to the Vessel required by the Classification Society or Law.

Related to Compatibility of Vessel with other Port Facilities

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • Use of Interconnection Facilities by Third Parties 494950 9.9.1 Purpose of Interconnection Facilities 494950 9.9.2 Third Party Users. 50 9.10 Disturbance Analysis Data Exchange. 50 ARTICLE 10. MAINTENANCE 50 10.1 Participating TO Obligations. 50 10.2 Interconnection Customer Obligations. 50 10.3 Coordination 505051

  • Verizon OSS Facilities Any gateways, interfaces, databases, facilities, equipment, software, or systems, used by Verizon to provide Verizon OSS Services to Covista.

  • System Upgrade Facilities and System Deliverability Upgrades Connecting Transmission Owner shall design, procure, construct, install, and own the System Upgrade Facilities and System Deliverability Upgrades described in Appendix A hereto. The responsibility of the Developer for costs related to System Upgrade Facilities and System Deliverability Upgrades shall be determined in accordance with the provisions of Attachment S to the ISO OATT.

  • Connecting Transmission Owner’s Attachment Facilities Construction The Connecting Transmission Owner’s Attachment Facilities shall be designed and constructed in accordance with Good Utility Practice. Upon request, within one hundred twenty (120) Calendar Days after the Commercial Operation Date, unless the Connecting Transmission Owner and Developer agree on another mutually acceptable deadline, the Connecting Transmission Owner shall deliver to the Developer “as-built” drawings, relay diagrams, information and documents for the Connecting Transmission Owner’s Attachment Facilities set forth in Appendix A. The Connecting Transmission Owner shall not transfer operational control of the Connecting Transmission Owner’s Attachment Facilities and Stand Alone System Upgrade Facilities to the NYISO upon completion of such facilities.