Completed Work. Weatherization work on homes, including final inspections, must be completed by the last day of this Contract in order that the homes may be charged to this Contract. Only the payment of expenses incurred during this Contract may take place after the last day of this Contract. Expenditures on a home that was started under this contract and ended after the end of this contract must be charged to the weatherization contract that is in effect at the time the home is completed.
Completed Work. The City shall be notified by the Contractor upon completion of work. The City shall inspect and approve completed work before authorizing payment. Work not satisfactorily completed shall be redone by the Contractor at no additional charge to the City.
Completed Work. Upon publication, Writer will be sent, free of charge, the digital edition of the issue in which Work appears and will be given the opportunity to purchase copies of the print edition.
Completed Work. Dredging of impacted sediment in the following areas was completed in 2021: Wire Mill Delta, ▇▇▇▇ Pond, and Unnamed Pond. • Capping was completed in the Wire Mill Delta and ▇▇▇▇ Pond. • Restoration of Unnamed Creek was completed. Hydraulic dredge sits on a barge in the Wire Mill Delta View of the upstream portion of Unnamed Creek following restoration <.. image(A boat in the water Description automatically generated with low confidence) removed ..> <.. image(Qr code Description automatically generated) removed ..>
Completed Work. The Power Block 1 Standby Diesel Generator (1DG-DG-0100) has been partially assembled and installed at the Moapa Energy Facility. Completed work includes: 1. Pouring of the foundation for the Diesel Generator and the Load Bank (separate foundations). 2. Installation of the plant grounding grid and stub-ups around the Diesel Generator foundation. 3. Setting and mounting of the Caterpillar model 3412 Diesel Generator set on the foundation. 4. Installation of platforms, ladders, railing and cable tray around the Diesel Generator set. 5. Installation of a temporary 120/208 VAC power supply to the Diesel Generator for energizing the battery charger, space heater and jacket water heater. No additional cabling, raceway, piping or structural hardware has currently been installed. Photographs 1-4 provide views of the partially assembled and installed Standby Diesel Generator.
Completed Work. 4.15.1 The Contractor, on completion of the Work, shall leave the site of the Work and the abutting land to the site of the Work in a clean and neat condition to the satisfaction of TOARC. 4.15.2 TOARC may, in its discretion, retain from any monies due to the Contractor an amount sufficient to settle any claims for damages from third parties arising out of the execution of the Works by the Contractor of which TOARC becomes aware. 4.15.3 TOARC may retain monies pursuant to section 4.15.2 until the claims, which gave rise to the retention of monies have been settled or the damage has been rectified. TOARC shall not be obliged to pay any interest to the Contractor on the monies retained pursuant to section 4.15.3.
Completed Work. In the event of termination, Consultant shall, at WMA GSA’s request, promptly surrender to WMA GSA all completed work and work in progress and all materials, records and notes developed, procured, or produced pursuant to this Agreement. Consultant may retain copies of such work product as a part of its record of professional activity.
Completed Work. Provide the requested information set forth below for at least five (5) most recent projects of similar size and scope completed during the past five (5) years. a. Project Name: Project Description: Contract Amount: Date Completed: Contact Person: Contact Person’s Phone: Project Name: Project Description: Contract Amount: Date Completed: Contact Person: Contact Person’s Phone: Project Name: Project Description: Contract Amount: Date Completed: Contact Person: Contact Person’s Phone: Project Name: Project Description: Contract Amount: Date Completed: Contact Person: Contact Person’s Phone: Contract Amount: Date Completed: Contact Person: Contact Person’s Phone:
Completed Work. The value of its Work satisfactorily performed as of the date notice of termination is received, based on Contractor’s schedule of values and unpaid costs for items delivered to the Project site that were fabricated for incorporation in the Work;
Completed Work. The Contractor, certifying the work was satisfactorily performed, shall sign completed work authorizations. The Contractor, upon completion of the job, shall leave the work area and premises in a clean, neat condition. The Contractor shall remove water and sewage spilled as a result of a malfunction or repair to leave the area in a sanitary condition. This also includes, but is not limited to, proper disposal of toxic materials such as paint (non-leaded), antifreeze, and Freon. The contractor shall upon completion of maintenance, installation, alterations and repair of systems, equipment, or components thereof, ensure that functional capabilities are completely restored or achieved before work shall be considered to be complete. After completion of all work the Contractor shall provide the Government with a Customer Satisfaction Survey in a savable electronic format. The Contractor shall submit its final signed quality control closeout for each project, maintain a file of all signed certifications, and submit a monthly report of signed certifications. After the completion of each work order, the Contractor shall input into the General Fund Enterprise Business System (GFEBS) Labor & Equipment card data for the individuals who worked on the job, by trade area they worked in, and their total hours. The Contractor shall provide a monthly report from GFEBS or from the Contractor’s work management system all completed work to the DPW BOID and COR within ten (10) business days of the following month. The report shall provide the locations and number of individuals who worked on each job, by trade area they worked in and their total hours, and total hours for the scheduled or unscheduled tasks.