Common use of Completion Drawings Clause in Contracts

Completion Drawings. 18.1 Completion drawings of all the completed works for showing the layout of the area with dimensions, slopes and details of building, reinforcements used, pavement, drain, cable trenches, machine foundations, etc, shall be prepared by the contractor at his own cost. 18.2 Contractor will supply three copies of completion drawings along with soft copy in CD / Pen-drive with the final bill. In case contractor does not submit the completion drawing within 30 days of completion of the work or alongwith submission of final bill (whichever is later), he shall be liable to pay a sum as prescribed in Schedule F and in this respect the decision of the Engineer-in-charge shall be final and binding on the contractor.

Appears in 2 contracts

Sources: Annual Maintenance Contract, Annual Maintenance Contract