Complexity Factor Sample Clauses

Complexity Factor. The complexity factor for centres is determined in the following manner: • The average staffing attendance figure from the Preschool Staffing Exercise multiplied by a factor of three. • The total enrolment figures for Term 4. • The number of Aboriginal children enrolled in the centre for Term 4 multiplied by a factor of two. • The number of children from non-English speaking background enrolled in the centre for Term 4. • The number of occasional care sessions multiplied by a factor of four. • The notional school card indicator multiplied by a factor of three. The sum of all these figures gives the total complexity factor.
Complexity Factor. Figure 5-5F presents a description for the various levels on the complexity of work. R Value Complexity of Work CPFF = 0.0 DLM = 0.0 Low complexity projects that involve such work as project surveys, routine drafting functions, minor simple span bridges, small rural projects, project reports, and simple environmental assessments. CPFF = 0.035 DLM = 0.003 Complex jobs that involve such work as small urban projects, freeway interchanges, projects on new alignment, freeways, multi- span continuous bridges, complex environmental assessments, and design reports. CPFF = 0.070 DLM = 0.008 Very complex work that involves such work as multi-level interchanges, movable bridges, complex major bridges, major urban freeways, complex design reports, environmental impact statements, and major engineering studies requiring special expertise. 5-5.11 Agreement Processing‌ Once the LPA and the consultant have agreed on scope, terms, and compensation, the engineering agreement shall be submitted to the District BLRS for review.
Complexity Factor. Figure 5-5E presents a description for the various levels on the complexity of work. R Value Complexity of Work CPFF = 0.0 DLM = 0.0 Low complexity projects that involve such work as project surveys, routine drafting functions, minor simple span bridges, small rural projects, project reports, and simple environmental assessments. CPFF = 0.035 DLM = 0.003 Complex jobs that involve such work as small urban projects, freeway interchanges, projects on new alignment, freeways, multi- span continuous bridges, complex environmental assessments, and design reports. CPFF = 0.070 DLM = 0.008 Very complex work that involves such work as multi-level interchanges, movable bridges, complex major bridges, major urban freeways, complex design reports, environmental impact statements, and major engineering studies requiring special expertise.

Related to Complexity Factor

  • Power Factor The Power Producer shall maintain the Power Factor as per the prevailing GERC regulations and as may be stipulated / specified by GETCO from time to time. The Power Producer shall provide suitable protection devices, so that the Electric Generators could be isolated automatically when grid supply fails. Connectivity criteria like short circuit level (for switchgear), neutral Grounding, fault clearance time, current unbalance (including negative and zero sequence currents), limit of harmonics etc. shall be as per Grid Code.

  • Power Factor Design Criteria Developer shall design the Large Generating Facility to maintain an effective power delivery at demonstrated maximum net capability at the Point of Interconnection at a power factor within the range established by the Connecting Transmission Owner on a comparable basis, until NYISO has established different requirements that apply to all generators in the New York Control Area on a comparable basis. The Developer shall design and maintain the plant auxiliary systems to operate safely throughout the entire real and reactive power design range. The Connecting Transmission Owner shall not unreasonably restrict or condition the reactive power production or absorption of the Large Generating Facility in accordance with Good Utility Practice.

  • ADJUSTMENT FACTORS The Contractor will perform any or all Tasks in the Construction Task Catalog for the Unit Price appearing therein multiplied by the following Adjustment Factors. See the General Terms and Conditions for additional information.

  • Service Level Expectations Without limiting any other requirements of the Agreement, the Service Provider shall meet or exceed the following standards, policies, and guidelines:

  • Performance Factors (a) Each party will notify the other party of the existence of a Performance Factor, as soon as reasonably possible after the party becomes aware of the Performance Factor. The Notice will: describe the Performance Factor and its actual or anticipated impact; include a description of any action the party is undertaking, or plans to undertake, to remedy or mitigate the Performance Factor; indicate whether the party is requesting a meeting to discuss the Performance Factor; and address any other issue or matter the party wishes to raise with the other party. (b) The recipient party will provide a written acknowledgment of receipt of the Notice within 7 Days of the date on which the Notice was received (“Date of the Notice”). (c) Where a meeting has been requested under paragraph 7.2(a)(3), the parties agree to meet and discuss the Performance Factors within 14 Days of the Date of the Notice, in accordance with the provisions of section 7.3.