Conceptual Sanitary Sewer Layouts Clause Samples

Conceptual Sanitary Sewer Layouts. This SOS assumes new 8” sanitary sewer along ▇▇▇▇▇▇▇ ▇▇▇▇ and the future ▇▇▇▇▇▇▇ Avenue.
Conceptual Sanitary Sewer Layouts. Conceptual design will be utilized to identify the reconstruction areas of the existing sanitary sewer system within the project area. This SOS assumes only modifications/repairs to the existing sanitary sewer system are included. New sanitary sewer is not anticipated.

Related to Conceptual Sanitary Sewer Layouts

  • Sanitary Sewer Provide a standard bubble map, as part of the plans, showing locations of numbered points, and a table with point number, northing and easting coordinates, description, and BL station for each point, for the following: ▪ all possible control as established or attained during preliminary survey, including but not limited to – section corners, property irons, intersection center-center irons, other set monuments ▪ benchmarks, including TBM set with preliminary survey ▪ center of manholes ▪ end of manhole stubs (when longer than five feet)

  • Electrical appliance safety The Hirer shall ensure that any electrical appliances brought by them to the premises and used there shall be safe, in good working order, and used in a safe manner in accordance with the Electricity at Work Regulations 1989. Where a residual circuit breaker is provided the hirer must make use of it in the interests of public safety.

  • Sanitary Facilities Construction (a) Closets shall be soundly constructed and roofed with weatherproof material. The floor of each closet shall be well drained and constructed of concrete, bricks and cement, or of other approved materials which shall be impervious to water. Every closet shall be well lighted by natural or artificial light and shall be ventilated. Each closet shall have a hinged door, capable of being fastened on the inside, lift seats/flaps and toilet paper. (b) If closets are of single unit construction (only to be used for the formwork process), not contained within a purpose built ablution block, privacy walls which shield the closet/s from outside view shall be installed. (Privacy walls are not required for purpose built ablution blocks eg ATCO huts). (c) Where practicable, toilets to be connected to sewerage before commencement of the job. (d) Closet/urinal location to be conveniently accessible to Employees, but not so close as to cause a nuisance to those persons. (e) Where necessary, portable water seal toilets of an approved standard are to be provided and regularly serviced.

  • Irrigation An irrigation reduced pressure zone (hereinafter referred to as “RPZ”) is required for any irrigation systems and must be installed by the Developer and/or eventual lot owner and tested in accordance with the Minnesota Department of Health Guidelines for Designing Backflow Prevention Assembly Installations (hereinafter referred to as “Guidelines”). The initial test results and certification shall be submitted to the City of Maple Grove Public Works Department. Subsequently, the RPZ must be tested, per the Guidelines, at least annually by a certified tester with the results reported to the City of Maple Grove Building Department and the RPZ must be rebuilt as needed in accordance with the Guidelines. Test/rebuilt reports shall be mailed or faxed to the City of Maple Grove Building Department at (▇▇▇) ▇▇▇-▇▇▇▇. The irrigation system shall be designed and the Plans shall be modified accordingly, prior to the issuance of any permits for the development of the Property, to accommodate a 1-inch water meter and a maximum flow of 50 gallons per minute.

  • Contract Database Metadata Elements Title: Sayville Union Free School District and Sayville Union Free School Custodial and Maintenance Employees Unit, United Public Service Employees Union (UPSEU), Local 424 (2011) Employer Name: Sayville Union Free School District Union: Sayville Union Free School Custodial and Maintenance Employees Unit, United Public Service Employees Union (UPSEU) Local: 424 Effective Date: 07/01/2011 Expiration Date: 06/30/2015 PERB ID Number: 6131 Unit Size: 55 Number of Pages: 24 For additional research information and assistance, please visit the Research page of the Catherwood website - ▇▇▇▇://▇▇▇.▇▇▇.▇▇▇▇▇▇▇.▇▇▇/library/research/ For additional information on the ILR School - ▇▇▇▇://▇▇▇.▇▇▇.▇▇▇▇▇▇▇.▇▇▇/ 55 People TABLE OF CONTENTS ARTICLE Page XXII ANNUAL LEAVE DAYS 14 XXV BREAKS 18 XXVI CIVIL SERVICE LAW ARTICLE SECTION 75 18 XXVIII DURATION 19 XIV EMERGENCY WORK 11 XXI FOUL WEATHER CLOTHING 14 XI GRIEVANCE PROCEDURE 9 XVI HIGHER JOB CLASSIFICATION 12 XVIII HOLIDAYS 13 XV HOLIDAY AND WEEKEND BUILDING CHECKS 12 V INSURANCE 4 X LAYOFF, DISPLACEMENT AND RECALL ORDER 8 VII MANAGEMENT RIGHTS 7 XXVII MISCELLANEOUS 19 XVII NOTICES OF PROMOTIONS 13 XIII OVERTIME 10 II PAYROLL DEDUCTIONS 1 III PERSONNEL FILES 2 XXIV PHYSICAL EXAMINATIONS 18 XXIII RETIREMENT 16 IX STRIKES AND LOCKOUTS 7 XIX VACATIONS 13 XX VISITATION 14 IV WAGES 3 VI WORKERS' COMPENSATION 6 XII WORKWEEK 10 VIII WRITTEN BOARD POLICY 8 APPENDIX A 20 4/20/2016 AGREEMENT made and entered into this day of November 2013 between the SAYVILLE UNION FREE SCHOOL DISTRICT (hereinafter referred to as the “District”) and United Public Service Employees Union, ▇▇▇▇ ▇▇▇▇▇▇▇▇ ▇▇▇▇▇▇▇▇ ▇▇▇▇▇▇▇, ▇▇▇▇▇▇▇▇▇▇, N.Y. 11779 (hereinafter referred to as the “Union”).