CONDUCT OF DREDGING WORK Clause Samples

CONDUCT OF DREDGING WORK. A. Order of Work The PCCA reserves the right to specify order of work. Construction shall be continuous from start to finish with no appreciable shut down periods including movement between for dredging locations and multiple DMPA locations. B. Interference with Navigation The Corpus Christi Ship Channel and La Quinta Channel are highly utilized facilities and Contractor shall be aware of navigational requirements. Dredging operations, equipment, and personnel shall not restrict navigation in the ship channel or impact any PCCA, Federal, or third-party properties. Right of way shall be provided to any and all vessels entering and leaving the Port. Contractor shall keep abreast of the navigation requirements of vessels' ingress and egress through the port and provide appropriate accommodations to move dredging plant and other equipment so as not to interfere with navigation. Contractor shall coordinate with the PCCA to locate dredge pipe and provide proper clearance for all dredge pipe (submerged or floating). Delays caused by shipping shall not be grounds for claims, changed conditions, or time extensions to the contract.

Related to CONDUCT OF DREDGING WORK

  • Conduct of Logging Unless otherwise specifi- cally provided herein, Purchaser shall fell trees desig- nated for cutting and shall remove the portions that meet Utilization Standards, as provided in B2.2, prior to accep- tance of subdivision for completion of logging under B6.36. Forest Service may make exceptions for occa- sional trees inadvertently not cut or trees or pieces not removed for good reason, including possible damage to forest resources or gross economic impracticability at the time of removal of other timber. Logging shall be con- ducted in accordance with the following, unless C6.4 pro- visions set forth requirements to meet special or unusual logging conditions:

  • Construction Activities Please list all major construction activities, both planned and completed, to be performed by Seller or the EPC Contractor. Activity EPC Contractor / Subcontractor Completion Date __/__/____ (expected / actual) __/__/____ (expected / actual)

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • Conduct of Mediation Sessions Mediation hearings will be conducted in an informal manner and discovery will not be allowed. The discussions, statements, writings and admissions will be confidential to the proceedings (pursuant to California Evidence Code sections 1115 through 1128) and will not be used for any other purpose unless otherwise agreed by the parties in writing. The parties may agree to exchange any information they deem necessary. Both parties shall have a representative attend the mediation who is authorized to settle the dispute, though City's recommendation of settlement may be subject to the approval of the Mayor and City Council. Either party may have attorneys, witnesses or experts present.

  • Conduct of the Parties The parties will not engage in behaviour that is, or may reasonably be considered to be intimidating, bullying, or harassing or commit any act or behaviour which is offensive or abusive in connection with this Agreement.