Common use of Conductors Clause in Contracts

Conductors. Item 44(a) - Furnish and install #12 AWG XLP Copper conductor cable (600V). Item 44(b) - Furnish and install #6 AWG XLP Copper conductor cable (600V). Item 44(c) - Furnish and install #2 AWG XLP Copper conductor cable (600V). Item 44(c)1 - Furnish and install #6 AWG XLP Aluminum conductor cable (600V). Item 44(d) - Furnish and install #2/0 XLP Copper conductor cable (600V). Item 44(d)1- Furnish and install #4/0 XLP Copper conductor cable (600V). Item 44(e) - Furnish and install #2 AWG EPR Copper conductor cable (15KV). Item 44(f) - Furnish and install #2/0 AWG EPR Copper conductor cable (15kV). 4.77.1 The Contractor shall furnish all labor, material, and equipment, necessary to install cross-linked polyethylene covered or EPR high voltage cable in conduit. All conductors run shall be continuous from box to box. The cable and method of installation shall be in accordance with these Specifications. The Work shall include but not be limited to the following: 4.77.1.1 Cleaning out of the conduit by removing all water, dirt, debris and foreign material. 4.77.2 Making of all splices or connections at lampposts, cutouts, boxes, etc., where the new cables are installed or terminated. High voltage splices to be paid for under appropriate item.

Appears in 3 contracts

Sources: Furnish and Install Agreement, Furnish and Install Agreement, Furnish and Install Agreement