Generators Clause Samples

POPULAR SAMPLE Copied 1 times
Generators o The new shelter will be equipped with a 35 KW Generac propane generator. The existing Kohler generator is 12.5 KW with 2484 hours of service. o The existing 250 gallon propane tank will be used, with new gas lines coming off of the existing line. o Cap off the gas lines to the existing generator after cut-over to the new equipment.
Generators. Temporary installation of generators, and permanent installation of generators that are placed inside existing non-residential buildings or that occupy an area under 50 square feet behind the building they serve.
Generators. The analysis shall include all generators with a Winter Capability equal to or greater than 10.0 MW. Multiple generators connected to a single bus with a total Winter Capability equal to or greater than 10.0 MW shall also be included.
Generators. Licensee shall not allow or install generators or back-up generators in the Public Right-of-Way.
Generators. If you choose to use your own generator, the following rules will apply. Do not use generator inside the trailer - it MUST be kept outside. Do not leave the trailer unattended while a generator is running. Do not run a generator overnight or while sleeping due to safety reasons. Your generator must be a minimum of 3500 ▇▇▇▇▇ to run the systems within the RV without causing a power issue. You, the renter, assume all responsibility for any and all damages caused to the trailer & its appliances and systems by the use of a generator.
Generators. Generator/Welder House: one (1) Engineer required.
Generators. Any generators in the Use Areas must be specifically approved by the City. Generators must be equipped with well-maintained mufflers and comply with all federal, state, and local laws and regulations. Exercising a fixed generator must be confined to not more than a single session of one (1) hour or less each calendar month between the hours of 9 a.m. and 6 p.m. on a day that is not a weekend or holiday. No portable generators can be used except when power to the Communications Equipment is down during an emergency. In such case, the portable generator will need to be removed within four (4) hours after the power has been restored.
Generators. (a) Promptly following the date hereof, Landlord shall, at ▇▇▇▇▇▇▇▇’s sole cost and expense, remove the emergency Onan generator Model #12.5-JC-3CR9887AB attached to the Building. Following such removal, Section 12 of the Eighth Amendment to Lease Agreement shall be of no further force or effect. (b) Tenant shall have the right, at its sole cost and expense and subject to the terms of the Lease, to install, operate and maintain a generator (the “Generator”) in close proximity to Tenant’s existing generator, provided that (i) the design and precise location of the Generator is reasonably satisfactory to Landlord, and (ii) Tenant’s installation, operation and maintenance of the Generator is in accordance with all applicable federal, state and local laws and regulations, and the Lease. Tenant shall be solely responsible for obtaining any necessary permits and licenses required for the installation, operation and maintenance of the Generator. Prior to installation of the Generator, Tenant shall, on behalf of the installer, provide Landlord with a certificate of insurance reasonably satisfactory to Landlord. In addition, prior to installation of the Generator, at Landlord’s option, Tenant shall, at Tenant’s sole cost and expense, install screening surrounding the Generator. The size, location, design and manner of the installation of the screening surrounding the Generator shall be subject to the written approval of Landlord, which approval shall not be unreasonably withheld. Tenant shall at all times keep the Generator and the surrounding area in a clean and orderly condition. (c) Tenant shall be responsible for all costs of removal of the Generator and the screening surrounding the Generator. Tenant shall also be responsible for all costs associated with restoring the Building and/or common areas to their original condition after such removal. ▇▇▇▇▇▇ agrees, within thirty (30) days after written notice from Landlord, to remove the Generator and screening surrounding same in the event any governmental entity or applicable law or regulation requires removal thereof or Tenant fails to materially comply with the terms stated herein. Such removal shall be in accordance with all of the terms and conditions set forth herein. If Tenant elects not to remove the Generator and screening surrounding same from the Building or common areas, upon expiration or earlier termination of the Lease, or after expiration of the thirty (30) day notice period provided herein, the Gen...
Generators. No generators are permitted without prior approval. Absolutely no loud generators.
Generators. Use of generators and fireworks in public parks is prohibited.