The Emergency Generator clause outlines the requirements and responsibilities related to providing backup electrical power in the event of a utility outage. Typically, this clause specifies the type, capacity, and maintenance obligations for the emergency generator, and may detail which areas or systems must remain operational during a power failure, such as life safety systems, elevators, or critical equipment. Its core practical function is to ensure continuity of essential services and safety during power interruptions, thereby minimizing operational disruptions and protecting occupants or assets.
POPULAR SAMPLE Copied 32 times
Emergency Generator. 1) During the Term as it applies to the 9449 Expansion Space, as extended from time to time, Tenant shall have the right to install a supplemental emergency generator (the “Generator”) to provide emergency additional electrical capacity to the 9449 Building. The Generator shall be placed at a location at the 9449 Building designated by Tenant and reasonably approved by Landlord. Notwithstanding the foregoing, Tenant’s right to install the Generator shall be subject to: (i) Landlord’s reasonable approval of the manner in which the Generator is installed, the manner in which any cables are run to and from the Generator to the Premises and the measures that will be taken to eliminate any vibrations or sound disturbances from the operation of the Generator; and (ii) the covenants, conditions and restrictions of record applicable to the Project, architectural review and any necessary approval by the local municipality and county governments or agencies having authority and jurisdiction over such matters. Landlord shall have the right to require Tenant to provide a reasonably acceptable enclosure (e.g. wood fencing and landscaping) to hide or disguise the existence of the Generator and to minimize any adverse effect that the installation of the Generator may have on the appearance of the 9449 Building and Project. Tenant shall be solely responsible for obtaining all necessary governmental and regulatory permits and approvals and for the cost of installing, operating, maintaining, repairing and removing the Generator. Tenant shall also be responsible for the cost of all utilities consumed and utility connections required in the operation of the Generator.
2) Tenant shall be responsible for assuring that the installation, maintenance, repair, operation and removal of the Generator does not damage the 9449 Building or Project and Tenant shall be responsible for any damages caused thereby. For avoidance of doubt, the installation, maintenance, operation, repair or removal of the Generator shall be subject to the indemnity provisions set forth in Section 10.3 of the Lease.
3) Tenant shall be responsible for the installation, operation, repair, cleanliness, maintenance and removal of the Generator and appurtenances, all of which shall remain the personal property of Tenant and shall be removed by Tenant at its own expense as of the 9449 Extended Expiration Date or any earlier expiration or termination of Tenant’s right to possession of the 9449 Expansion Space in acco...
Emergency Generator. (A) Landlord grants to Tenant an exclusive license to access and use Landlord’s 230kw/480v diesel-powered standby generator located outside the rear of the Building and its associated automatic transfer switch located within the main switchgear room in the basement of the Building (the ‘Backup Power System’). The license granted under this Section 16.35 for the Backup Power System shall be referred to herein as the “Generator License”. Landlord represents and warrants that it has full power and authority and all necessary rights to grant the Generator License to Tenant. A drawing depicting the proposed location of Tenant’s Equipment and the connection to the Backup Power System is attached hereto as Exhibit 16.35.
(B) The parties hereby acknowledge that Tenant has installed conduits, wire, panels and transformers (collectively, ‘Tenant’s Equipment’) connecting the Premises to the Backup Power System.
(C) At all times during the term of the Generator License, Tenant shall maintain and repair, at Tenant’s sole cost and expense, Tenant’s Equipment, and the Backup Power System in good, operational working order and condition and in compliance with all Applicable Laws, codes, ordinances, orders, directives, rules and regulations, all insurance requirements, and all reasonable rules and regulations which may be promulgated by Landlord and of which Tenant is notified in writing from time to time. If all or any part of the Backup Power System (including, without limitation, the generator) requires replacement prior to the end of the term of the Generator License, Tenant may elect to (i) replace the Backup Power System at Tenant’s sole cost and expense or (ii) discontinue its use of the Backup Power System and to terminate the Generator License. If Tenant elects to discontinue its use of the Backup Power System and to terminate the Generator License, then Tenant at its sole cost and expense shall remove the Backup Power System prior to the termination or expiration of this Lease and repair any and all damage to the Premises and the Building caused by such removal. If Tenant elects to replace the Backup Power System then Landlord shall have the option to either (i) require Tenant to remove the Backup Power System prior to the termination or expiration of this Lease or (ii) pay Tenant an amount equal to the product of (a) the reasonable out-of-pocket costs incurred by Tenant to replace the Backup Power System multiplied by (b) the percentage based upon the useful lif...
Emergency Generator. Subject to the terms of this Section 16.8, Tenant may during the Term, install as an Alteration in accordance with Section 12.3, maintain, operate and use an emergency generator and associated equipment, connections and Cabling (collectively, the “Generator Facilities”) for the sole purpose of providing back-up power for the Premises (and not for the use of any other tenant in the Building) during a power outage in the Premises; provided that (a) Landlord and Tenant execute a license agreement (“License Agreement (Generator)”) in substantially the form of the License Agreement (Rooftop Installations), with mutually acceptable modifications consistent with this Section 16.8; (b) Tenant complies with, and performs and completes any work performed pursuant to the License Agreement (Generator) in accordance with the License Agreement (Generator) and this Lease, including, without limitation, Article XII; (c) Tenant pays associated Additional Rent as provided in Section 16.2 of this Lease for any excess electricity use; and (d) such Generator Facilities are installed in the location identified on Exhibit J. Notwithstanding anything to the contrary in this Section 16.8, Landlord and Tenant shall cooperate to agree to modifications to the License Agreement (Rooftop Installations) reasonably requested by the other party and as necessary to take into account the type of Generator Facilities to be installed pursuant to such License Agreement (Generator) and the location thereof; provided that the License Agreement (Generator) shall provide, in any event, that (i) the installation of the Generator Facilities pursuant thereto shall be at Tenant’s sole cost and expense and shall be subject to Landlord’s reasonable approval of plans, specifications, location, method of installation, shielding, type of generator to be installed, manner of placement and manner of connection to the electrical system serving the Premises; (ii) Tenant shall be responsible for restoring and repairing any damage caused by the installation, use, maintenance or removal of such Generator Facilities (or reimbursing Landlord for the cost thereof); and (iii) if the Landlord requires the removal of the Generator Facilities, the Generator Facilities shall be removed by Tenant, at its sole cost and expense, before the expiration of the Term or earlier termination of the License in accordance with Section 12.3
Emergency Generator. (a) Tenant, at its sole cost and expense and subject to the terms of this Lease, shall have the right to operate and maintain life safety, emergency, and business sustainability generators and related equipment (collectively, the "Generators") located in the Leased Premises. Tenant shall operate and maintain the Generators in accordance with all federal, state and local laws and regulations and with any protective covenants. Tenant shall be solely responsible for obtaining any necessary permits and licenses required to operate and maintain the Generators and shall provide copies thereof to Landlord. Tenant shall at all times keep the Generators and the surrounding area in a clean and orderly condition.
(b) Tenant, at its sole cost and expense, shall be responsible for removing non-life safety generators and the screening surrounding non-life safety generators and for restoring the Building and/or Common Areas affected by non-life safety generators and screening to their original condition after such removal. Tenant agrees, within thirty (30) days after written notice from Landlord, to remove the non-life safety generators and screening surrounding same in the event any governmental entity or applicable law or regulation requires removal thereof or Tenant fails to materially comply with the terms stated herein. Such removal shall be in accordance with all of the terms and conditions set forth herein. If Tenant fails to remove non-life safety generators and screening surrounding same from the Building or Common Areas upon expiration or earlier termination of the Lease, or after expiration of the thirty (30) day notice period provided above, non-life safety generators and screening surrounding same shall be deemed abandoned by Tenant and shall become the property of Landlord, or Landlord may remove the same at Tenant's expense.
Emergency Generator. Landlord’s sole obligation for either providing emergency generators or providing emergency back-up power to Tenant shall be: (i) to provide emergency generators with not less than the capacity of the emergency generators located in the Building as of the Commencement Date, and (ii) to contract with a third party to maintain the emergency generators as per the manufacturer’s standard maintenance guidelines. Except as otherwise provided in the immediately preceding sentence, Landlord shall have no obligation to provide Tenant with operational emergency generators or back-up power or to supervise, oversee or confirm that the third party maintaining the emergency generators is maintaining the generators as per the manufacturer’s standard guidelines or otherwise. Notwithstanding anything to the contrary contained herein, Landlord shall, at least once per calendar quarter as part of the maintenance of the Building, run the emergency generator for a period reasonably determined by Landlord for the purpose of determining whether it operates when started. Landlord shall, upon written request from Tenant (not more frequently than once per calendar year), make available for Tenant’s inspection the maintenance contract and maintenance records for the emergency generators for the 12 month period immediately preceding Landlord’s receipt of Tenant’s written request. During any period of replacement, repair or maintenance of the emergency generators when the emergency generators are not operational, including any delays thereto due to the inability to obtain parts or replacement equipment, Landlord shall have no obligation to provide Tenant with an alternative back-up generator or generators or alternative sources of back-up power. Tenant expressly acknowledges and agrees that Landlord does not guaranty that such emergency generators will be operational at all times or that emergency power will be available to the Premises when needed.
Emergency Generator. Tenant shall have the right to tie into and use the emergency generator to be installed by Landlord as part of the Base Building Work for use by tenants of the Unit (the “Unit Generator”). Tenant shall be responsible, at its sole cost and expense, for installing, maintaining, repairing and replacing its connection between the Premises and the Unit Generator, and all associated cabling. Tenant shall be permitted to use up to an average of three (3) ▇▇▇▇▇ per square foot of usable area in the Premises from the Unit Generator, and at no time shall Tenant exceed that use limitation with respect to the Unit Generator. Except to the extent that Tenant ties into the Unit Generator as part of the Initial Tenant Work in accordance with the provisions of the Work Letter, installation of such tie-in and any related cabling, conduit and appurtenances will be governed by the applicable provisions of this Lease relating to Tenant Work. Tenant will submit to Landlord at least thirty (30) days prior to the proposed installation date Tenant’s proposed plans and specifications relating to the tie-in to the Unit Generator and all associated lines. Tenant may not commence any work to tie into the Unit Generator until it has received Landlord’s prior written approval (not to be unreasonably withheld, delayed or conditioned) of such plans and specifications. Tenant, at its sole cost and expense, shall comply with all applicable Legal Requirements and Title Matters and Landlord’s reasonable directives relating to the installation, operation, maintenance and repair of such tie-in, including (i) obtaining and maintaining (or causing to be obtained and maintained) and complying with the provisions of all applicable permits relating to the tie into and use of the Unit Generator. Tenant may not use the Unit Generator for any purpose other than solely in connection with Tenant’s occupancy of the Premises for the Permitted Use and in accordance with any applicable permit(s) pertaining to the Unit Generator. Except for permitted subtenants and assignees. Tenant may not use the Unit Generator to serve other occupant(s) of the Development.
Emergency Generator. Landlord and Tenant hereby acknowledge that there is an existing generator currently serving the Building (“Emergency Generator”), and Tenant shall have the right to connect to the Emergency Generator for up to Tenant’s Share of the electrical capacity available to tenants which is provided by such Emergency Generator. Tenant’s use of the Emergency Generator shall be at Tenant’s sole risk. Landlord represents that the Emergency Generator is currently in place and shall be in good operating condition on the Lease Commencement Date, and during the Lease Term Landlord shall maintain the Generator in good condition and repair, and Tenant shall be responsible for a share of the costs of such maintenance and repair based on the proportion of the Generator capacity allocated to the Premises. Tenant hereby waives any claims against Landlord or any Landlord Parties resulting from Tenant’s use of the Emergency Generator, or any failure of the Emergency Generator to operate as designed, and agrees that Landlord shall not be liable for any damages resulting from any failure in operation of the Emergency Generator, including, without limitation any injury or damage to, or interference with, Tenant’s business, including but not limited to, loss of profits, loss of rents or other revenues, loss of business opportunity, loss of goodwill or loss of use, or loss to equipment, inventory, scientific research, scientific experiments, laboratory animals, products, specimens, samples, and/or scientific, business, accounting and other records of every kind and description kept at the Premises and any and all income derived or derivable therefrom. Tenant acknowledges that Operating Expenses shall include Landlord’s costs incurred in maintaining and operating the Emergency Generator (including all permit costs and fees).
Emergency Generator. Subject to Tenant's compliance with all Applicable Laws and Landlord's prior approval of all plans and specifications, which approval shall not be unreasonably withheld, Landlord shall permit Tenant to install, at Tenant's sole cost and expense, an above-ground emergency generator (as a Miscellaneous Common Area Item) for Tenant's use in the Building. Such emergency generator shall be used by Tenant only during (i) testing and regular maintenance, and (ii) any period of electrical power outage in the Building. Tenant shall be entitled to operate the emergency generator for testing and regular maintenance only upon notice to Landlord and at times reasonably approved by Landlord. Landlord's consent to Tenant's plans for the emergency generator may be conditioned on Tenant complying with such reasonable requirements imposed by Landlord, based on the advice of Landlord's engineers, so that the systems and equipment of the Building are not adversely affected. Any repairs and maintenance of such generator shall be the sole responsibility of Tenant. Upon the expiration or earlier termination of the Lease, Tenant shall, at Tenant's sole cost and expense, remove the emergency generator and all associated cabling and wiring and repair all damage resulting from such removal. Landlord makes no representation or warranty with respect to the emergency generator or its suitability for use by Tenant and Article 10 of the Lease shall apply with respect to Tenant's use, maintenance, repair and operation of the emergency generator.
Emergency Generator. Landlord’s sole obligation for either providing emergency generators or providing emergency back-up power to Tenant shall be: (i) to provide emergency generators with not less than the capacity to provide 4 ▇▇▇▇▇ of electricity per rentable square foot of the Premises, and (ii) to contract with a third party deemed by Landlord to be reputable to maintain the emergency generators as per the manufacturer’s standard maintenance guidelines. Notwithstanding anything to the contrary contained herein, Landlord shall, at least once per month as part of the maintenance of the Building, run the emergency generator for a period reasonably determined by Landlord for the purpose of determining whether it operates when started. Landlord shall, upon written request from Tenant, make available the maintenance contract and maintenance records for the emergency generators for the 12 month period immediately preceding Landlord’s receipt of Tenant’s written request. Landlord shall have no obligation to supervise, oversee or confirm that the third party maintaining the emergency generators is maintaining the generators as per the manufacturer’s standard guidelines or otherwise. During any period of replacement, repair or maintenance of the emergency generators when the emergency generators are not operational, including any delays thereto due to the inability to obtain parts or replacement equipment, Landlord shall have no obligation to provide Tenant with an alternative back-up generator or generators or alternative sources of back-up power. Tenant expressly acknowledges and agrees that Landlord does not guaranty that such emergency generators will be operational at all times or that emergency power will be available to the Premises when needed.
Emergency Generator. (a) Landlord shall provide 800 amperes of emergency electric power service “EPS”) to Tenant for use in the Premises from the Building emergency electric generator (the “Generator”) as provided in this Section 9.6. Landlord shall install, within sixty (60) days after the complete execution and delivery of this Lease by Landlord and Tenant, at Tenant’s sole cost and expense (i) an automatic transfer switch (the “Transfer Switch”), in the Premises at a location to be designated by Landlord, sufficient to supply a total connected load of up to 800 amperes of EPS at 460 volts to the Premises, and (ii) a connection from the Generator to the Transfer Switch. Tenant shall pay to Landlord the actual out-of-pocket costs incurred by Landlord for the installation of the Transfer Switch and the connection from the Generator to the Transfer Switch.
(b) Tenant shall pay to Landlord an annual fee (the “EPS fee”) for the period commencing on the date on which Landlord makes EPS available to the Premises through the Expiration Date of this Lease, irrespective of whether or not emergency power is ever required or used by Tenant, in the amount of $100.00 per ampere per year, subject to increase pursuant to Section 9.6(c) below. The EPS Fee shall be payable by Tenant to Landlord as Additional Rent in advance in equal monthly installments on the first day of each month during the Term. Tenant shall be responsible for the payment of any occupancy tax, or any other tax (other than Landlord’s income tax) imposed upon the Additional Rent paid by Tenant pursuant to this Section 9.6.
(c) For purposes of this Lease, (i) the term “CPI” means the Consumer Price Index for All Urban Consumers, New York, N.Y. - Northeastern, N.J., 1982-84=100; provided, however, that if the CPI or any successor index shall cease to be published, Landlord shall substitute therefor such other comparable index as Landlord shall reasonably determine, and (ii) the term “CPI Fraction” means, as of each January 1st during the Term (an “Adjustment Date”), a fraction (A) the numerator of which is the sum of (I) the CPI in effect on the immediately previous Adjustment Date (the “Base Index”) plus (2) the amount by which the CPI in effect on the Adjustment Date exceeds the Base Index, and (B) the denominator of which is the Base Index. If, as of each Adjustment Date, the CPI then in effect is greater than the Base Index, then the EPS Fee shall be increased as of such Adjustment Date to an amount equal to the product ...