Emergency Generator. Tenant shall have the right to tie into and use the emergency generator to be installed by Landlord as part of the Base Building Work for use by tenants of the Unit (the “Unit Generator”). Tenant shall be responsible, at its sole cost and expense, for installing, maintaining, repairing and replacing its connection between the Premises and the Unit Generator, and all associated cabling. Tenant shall be permitted to use up to an average of three (3) ▇▇▇▇▇ per square foot of usable area in the Premises from the Unit Generator, and at no time shall Tenant exceed that use limitation with respect to the Unit Generator. Except to the extent that Tenant ties into the Unit Generator as part of the Initial Tenant Work in accordance with the provisions of the Work Letter, installation of such tie-in and any related cabling, conduit and appurtenances will be governed by the applicable provisions of this Lease relating to Tenant Work. Tenant will submit to Landlord at least thirty (30) days prior to the proposed installation date Tenant’s proposed plans and specifications relating to the tie-in to the Unit Generator and all associated lines. Tenant may not commence any work to tie into the Unit Generator until it has received Landlord’s prior written approval (not to be unreasonably withheld, delayed or conditioned) of such plans and specifications. Tenant, at its sole cost and expense, shall comply with all applicable Legal Requirements and Title Matters and Landlord’s reasonable directives relating to the installation, operation, maintenance and repair of such tie-in, including (i) obtaining and maintaining (or causing to be obtained and maintained) and complying with the provisions of all applicable permits relating to the tie into and use of the Unit Generator. Tenant may not use the Unit Generator for any purpose other than solely in connection with Tenant’s occupancy of the Premises for the Permitted Use and in accordance with any applicable permit(s) pertaining to the Unit Generator. Except for permitted subtenants and assignees. Tenant may not use the Unit Generator to serve other occupant(s) of the Development.
Appears in 2 contracts
Sources: Lease Agreement (Vigil Neuroscience, Inc.), Lease Agreement (Vigil Neuroscience, Inc.)
Emergency Generator. (a) Subject to Landlord’s prior written approval of the design and specifications therefor (which approval shall not be unreasonably withheld, conditioned or delayed), Tenant shall have the right to tie into and use the emergency generator to be installed by Landlord as part of the Base Building Work for use by tenants of the Unit (the “Unit Generator”). Tenant shall be responsibleright, at its sole cost and expenseexpense (except to the extent to which the installation cost thereof is paid through the Landlord’s Allowance), to install, operate, repair, maintain and replace a back-up generator reasonably necessary for installing, maintaining, repairing Tenant’s requirements including natural gas or fuel supply and replacing its connection between the Premises and the Unit Generatortank therefor reasonably necessary for Tenant’s requirements (not to exceed applicable code requirements), and all associated cablingreasonably necessary cabling and related appurtenances (collectively, the “Generator”) to serve the Premises at the location identified on Exhibit A attached hereto or in a location in or around the Building or the Parking Facilities as otherwise agreed upon by the parties, if Tenant elects to install the Generator.
(b) No Rent shall be charged to Tenant for the area to be occupied by the Generator and the areas required to connect the Generator to the appropriate locations within the Premises (but if the Generator occupies any parking spaces in the Parking Facilities, such spaces shall reduce the required Parking Allotment by the number of such occupied spaces). Tenant shall will be permitted to use up to an average of three (3) ▇▇▇▇▇ per square foot of usable area in the Premises from the Unit Generator, and at no time shall Tenant exceed that use limitation solely responsible for all utility charges incurred with respect to the Unit Generator. , as separately metered (at Tenant’s expense).
(c) Except to the extent that Tenant ties into the Unit Generator is installed as part of the Initial Tenant Work in accordance with the provisions of the Work Letter, installation of such tie-in the Generator and any related cabling, conduit and appurtenances will be governed by the applicable provisions of this Lease relating to Tenant Work. Tenant will submit to Landlord at least thirty (30) days prior to the proposed installation date date(s) Tenant’s proposed plans and specifications relating to the tie-in to installation, operation and use of the Unit Generator and all associated lines. Except to the extent the Generator is installed as part of the Initial Tenant Work in accordance with the provisions of the Work Letter, Tenant may not commence any work to tie into the Unit install a Generator until it has received Landlord’s prior written approval (not to be unreasonably withheld, delayed or conditioned) of such plans and specifications. Tenant, at its sole cost and expense, shall comply with all applicable Legal Requirements and Title Matters restrictive covenants affecting the Property and Landlord’s reasonable directives relating to the installation, operation, maintenance and repair of such tie-inthe Generator, including including, but not limited to (i) obtaining and maintaining (or causing to be obtained and maintained) and complying with the provisions of all applicable permits required for the installation, operation, maintenance and repair of the Generator, (ii) implementing spill prevention control and countermeasures and containment plan(s) (as required by federal, state, or local regulations) or best management practices plan(s), (iii) providing evidence of insurance covering such facilities, and (iv) maintaining and inspecting such facilities and related equipment and keeping records related thereto. Tenant will maintain and repair the Generator in good operating condition throughout the Term, at Tenant’s sole cost and expense. Any replacement (excluding insured casualty), all maintenance and repair of the Generator and all governmental compliance required in connection with the Generator will be Tenant’s sole responsibility and Tenant’s sole cost and expense; provided, however, if Tenant fails to commence such maintenance and repair within thirty (30) days (unless an emergency exists, in which event Tenant shall promptly commence such curative work and thereafter diligently prosecute the same to completion) after written notice from Landlord and thereafter diligently prosecutes the same to completion, then Landlord may elect to perform such maintenance at Tenant’s sole cost and expense. Upon Landlord’s request, Tenant will promptly provide Landlord with copies of all records relating to the tie into installation, operation, maintenance and use repair of the Unit Generator. .
(d) Tenant may not use the Unit Generator for any purpose other than solely in connection with Tenant’s occupancy of the Premises for the Permitted Use and in accordance with any applicable permit(s) pertaining to the Unit Generator. Except for permitted subtenants and assignees. Tenant may not use the Unit Generator to serve other occupant(s) of the DevelopmentProperty. This provision does not modify Tenant’s permitted use of the Premises, and does not relieve Tenant of any environmental liability under this Lease.
(e) At any time within ninety (90) days prior to the expiration of the Lease, or earlier termination of the Lease, Landlord may, at Tenant’s cost and expense, cause a qualified environmental consultant reasonably acceptable to Landlord and Tenant to perform an environmental investigation to determine whether a release of any Hazardous Materials has occurred during the Term of this Lease with respect to the Generator. Within thirty (30) days following the expiration or earlier termination of this Lease, Tenant may elect (but shall not be required) to remove the Generator, but if Tenant elects to do so, Tenant shall promptly (i) remove the Generator (and any related fuel tanks, conduit, fuel lines, cabling and other appurtenances associated therewith), (ii) restore the affected areas to their original condition prior to the installation of the Generator, in accordance with plans and specifications reasonably acceptable to Landlord and all applicable Legal Requirements, and (iii) repair any damage to the Premises or the Property caused by the removal of the Generator. Tenant shall perform any required environmental remediation for the release of any Hazardous Materials in connection with the Generator caused by Tenant or any Tenant Party during the Term of this Lease in accordance with applicable Legal Requirements, all at Tenant’s sole cost and expense. If the environmental investigation performed by the environmental consultant as provided above confirms the release of any Hazardous Materials caused by Tenant or any Tenant Party in connection with the Generator, Tenant must thereafter perform any clean up or remediation required by applicable Legal Requirements and in accordance with applicable Legal Requirements, and document with a report prepared by a qualified environmental consultant reasonably approved by Landlord, evidencing either no impact to soil and groundwater exceeding state cleanup criteria for the use of the site, or that any impacted soil or groundwater has been remediated in a manner and to a level meeting the applicable state cleanup criteria, together with any applicable state assurance or closure.
(f) Tenant will promptly report to Landlord any spill or release and any written citations or notices of violation of any Legal Requirements received by Tenant in connection with the Generator, and will provide Landlord with copies thereof. Such notification to Landlord will not relieve Tenant from its obligations to notify governmental agencies. Any cleanup or remediation will be completed by Tenant in accordance with applicable Environmental Laws and in a manner and to a level meeting the applicable state cleanup criteria, together with any applicable state assurance or closure.
(g) Tenant shall make annual inspections, at Tenant’s expense, to ensure regulatory compliance and the proper operation, maintenance and repair of the Generator, and will forward copies of such inspection reports to Landlord promptly following receipt of Landlord’s written request(s) therefor.
Appears in 2 contracts
Sources: Lease (C4 Therapeutics, Inc.), Lease (C4 Therapeutics, Inc.)
Emergency Generator. Although Landlord is the owner of emergency generator and related automatic transfer switches serving the Building and the 901 Building (collectively, the “Emergency Generator”), prior to the date of this First Amendment, Tenant, as the sole tenant of the Building and the 901 Building, has been operating and maintaining the Emergency Generator. Tenant shall, on the date that is 1 day after the mutual execution and delivery of this First Amendment by the parties (“EG Transfer Date”), (x) deliver the Emergency Generator to Landlord in good working order with a full tank of diesel (y) assign to, transfer and deliver to Landlord all governmental permits and licenses (to the extent such permits and licenses are assignable), if any, warranties (to the extent assignable), operating and maintenance manuals, records and other documents concerning the Emergency Generator, and (y) terminate any service, maintenance or other contracts maintained by Tenant with respect to the Emergency Generator. Tenant has not been obligated to maintain a wastewater permit in connection with the Emergency Generator. With respect to any permit required for the Emergency Generator, Landlord acknowledges and agrees that Tenant has been in the process of obtaining a generator permit in connection with a Tenant permitting process underway with the Bay Area Air Quality Management District (“BAAQMD”) for the 901 Building, that Tenant will remove the generator from its permit application with BAAQMD, and that Landlord will need to obtain a generator permit from BAAQMD in its own name. To the best of Tenant’s knowledge, Tenant does not have any other permits in connection with the Emergency Generator. To the extent Tenant has current contracts with any vendors for the Emergency Generator, Tenant and Landlord shall reasonably cooperate to assign or terminate such contracts in the manner set forth in Section 14 above regarding utilities. To the extent it is not possible for Tenant to remove the request for a generator permit from its BAAQMD application or to assign or terminate any service maintenance or other contracts within 1 day after the mutual execution and delivery of this First Amendment, Tenant shall not be in default hereunder if Tenant promptly commences efforts to do so and diligently performs until such actions have been completed within a reasonable period after such date. Landlord shall, within 5 days of the EG Transfer Date, as part of Expenses, conduct such testing of the Emergency Generator required, in Landlord’s sole and absolute discretion, to determine whether the Emergency Generator is, in fact, in good working order. If such testing discloses that the Emergency Generator is not in good working order, Landlord shall have the right to tie into and use the emergency generator to be installed by Landlord as part of the Base Building Work for use by tenants of the Unit (the “Unit Generator”). Tenant shall be responsibleright, at its Tenant’s sole cost and expense, to perform any maintenance and/or repairs required to put the Emergency Generator in good working order. Following the EG Transfer Date, Landlord’s sole obligation for installingeither providing emergency generators or providing emergency back-up power to Tenant shall be: (i) to provide emergency generators with not less than the current capacity of the Emergency Generator and Tenant shall be entitled to Tenant’s share of the capacity thereof available for use by all tenants of the Building and the 901 Building, maintainingcollectively, repairing and replacing its connection between in accordance with the rentable area of the Premises and the Unit Generator901 Building and the collective rentable areas of the Building and the 901 Building occupied by such other tenants, (ii) to contract with a third party to maintain the emergency generators (“Emergency Generator Servicer”) as per the manufacturer’s standard maintenance guidelines, and all associated cabling(iii) to obtain and maintain licenses for the emergency generators as required by applicable law. Landlord shall have no obligation to provide Tenant with operational emergency generators or back-up power or to supervise, oversee or confirm that the Emergency Generator Servicer or any other third party maintaining the emergency generators is maintaining the generators as per the manufacturer’s standard guidelines or otherwise. Landlord shall provide to Tenant copies of any reports received by Landlord from the Emergency Generator Servicer regarding its maintenance and repairs of the emergency generators; provided, however, that in no event shall Landlord’s failure to deliver such reports constitute a default by Landlord under the Lease. During any period of replacement, repair or maintenance of the emergency generators when the emergency generators are not operational, including any delays thereto due to the inability to obtain parts or replacement equipment, Landlord shall have no obligation to provide Tenant with an alternative back-up generator or generators or alternative sources of back-up power. Tenant expressly acknowledges and agrees that Landlord does not guaranty that such emergency generators will be operational at all times or that emergency power will be available to the Premises when needed. Landlord shall be permitted to use up to an average provide Tenant with not less than five (5) business days’ notice of three (3) ▇▇▇▇▇ per square foot of usable area the scheduled disruption in the Premises from the Unit Generator, and at no time shall Tenant exceed that use limitation with respect to the Unit Generator. Except to the extent that Tenant ties into the Unit Generator as part operation of the Initial emergency generators. In the case of an emergency, Landlord shall provide Tenant Work in accordance with the provisions notice of any emergency disruption as soon as reasonably possible after Landlord becomes aware of the Work Letter, installation of need for such tie-in and any related cabling, conduit and appurtenances will be governed by the applicable provisions of this Lease relating to Tenant Work. Tenant will submit to Landlord at least thirty (30) days prior to the proposed installation date Tenant’s proposed plans and specifications relating to the tie-in to the Unit Generator and all associated lines. Tenant may not commence any work to tie into the Unit Generator until it has received Landlord’s prior written approval (not to be unreasonably withheld, delayed or conditioned) of such plans and specifications. Tenant, at its sole cost and expense, shall comply with all applicable Legal Requirements and Title Matters and Landlord’s reasonable directives relating to the installation, operation, maintenance and repair of such tie-in, including (i) obtaining and maintaining (or causing to be obtained and maintained) and complying with the provisions of all applicable permits relating to the tie into and use of the Unit Generator. Tenant may not use the Unit Generator for any purpose other than solely in connection with Tenant’s occupancy of the Premises for the Permitted Use and in accordance with any applicable permit(s) pertaining to the Unit Generator. Except for permitted subtenants and assignees. Tenant may not use the Unit Generator to serve other occupant(s) of the Developmentemergency disruption.
Appears in 2 contracts
Sources: Lease Agreement (Theravance Biopharma, Inc.), Lease Agreement (Theravance Inc)
Emergency Generator. In accordance with, and subject to, (i) reasonable construction rules and regulations promulgated by Landlord, and (ii) the terms and conditions hereof, (iv) applicable Laws, (v) Underlying Documents and (vi) approval from the City of San Mateo, Tenant shall have the right set forth in Article 8 of this Lease and this Article 22, to tie into install, repair, maintain and use the use, at Tenant’s sole cost and expense but without any additional payment to Landlord to install and operate an emergency generator to be installed by Landlord as part of the Base Building Work for use by tenants of the Unit (the “Unit Generator”) in one of the locations depicted on Exhibit J attached hereto, subject to Landlord’s confirmation that such locations may accommodate such Generator, or another area reasonably approved by Landlord (the “Generator Area”), in order to provide emergency electricity service to the Premises. Landlord shall deliver, and Tenant shall accept, the Generator Area in its “as-is”, “where-is” condition. In no event shall Tenant permit the Generator to interfere with normal and customary use or operation of the Project by Landlord or other tenants and/or occupants (including, without limitation, by means of noise or odor). Tenant shall install the Generator in accordance with Article 8 above, including Landlord’s right to review and approve Tenant’s plans and specifications therefor, which approval shall not be responsibleunreasonably withheld, conditioned or delayed. Tenant shall be responsible for all maintenance and repairs in accordance with manufacturer specifications and compliance with applicable Law obligations related to the Generator and acknowledges and agrees that Landlord shall have no responsibility in connection therewith and that Landlord shall not be liable for any damage that may occur with respect to the Generator, except for property damage to the extent caused by the negligence or willful misconduct of any Landlord Party (but subject to the waiver in Section 10.5). The Generator shall be used by Tenant only during (i) testing and regular maintenance, and (ii) the period of any electrical power outage in the Building. Tenant shall be entitled to operate the Generator, and such connections to the Building, for testing and regular maintenance at times approved by Landlord, which approval shall not be unreasonably withheld, conditioned or delayed. Tenant shall comply with all reasonable requirements imposed by Landlord so that the Building Systems or other components of the Project are not adversely affected by the operation of the Generator. Landlord makes no representations or warranties, and shall have no responsibility or liability to any Tenant Party for any losses, damages, injury to persons or property caused by, related to, arising out of or in connection with, to the condition of the Generator Area, or the fitness or suitability of the Generator Area for the installation, maintenance and operation of the Generator. For all purposes under this Lease, the Generator shall be deemed to be included within the definition of Tenant’s Off-Premises Equipment. In the event that Tenant shall fail to comply with the requirements set forth herein within ten (10) business days following its receipt of Landlord’s notice of such failure, without limitation of Landlord’s other remedies, (i) Landlord shall have the right to terminate Tenant’s rights with respect to the Generator, and/or (ii) Landlord shall have the right, at its Tenant’s sole cost and expense, for installingto cure such breach, maintaining, repairing and replacing its connection between the Premises and the Unit Generator, and all associated cabling. in which event Tenant shall be permitted obligated to use up pay to an average of three Landlord, within ten (310) ▇▇▇▇▇ per square foot of usable area in business days following demand by Landlord, the Premises from the Unit Generator, and at no time shall Tenant exceed that use limitation with respect to the Unit Generator. Except to the extent that Tenant ties into the Unit Generator as part of the Initial Tenant Work in accordance with the provisions of the Work Letter, installation of such tie-in and any related cabling, conduit and appurtenances will be governed amount reasonably expended by the applicable provisions of this Lease relating to Tenant Work. Tenant will submit to Landlord at least thirty (30) days prior to the proposed installation date Tenant’s proposed plans and specifications relating to the tie-in to the Unit Generator and all associated lines. Tenant may not commence any work to tie into the Unit Generator until it has received Landlord’s prior written approval (not to be unreasonably withheld, delayed or conditioned) of such plans and specifications. Tenant, at its sole cost and expense, shall comply with all applicable Legal Requirements and Title Matters and Landlord’s reasonable directives relating to the installation, operation, maintenance and repair of such tie-in, including (i) obtaining and maintaining (or causing to be obtained and maintained) and complying with the provisions of all applicable permits relating to the tie into and use of the Unit Generator. Tenant may not use the Unit Generator for any purpose other than solely in connection with Tenant’s occupancy of the Premises for the Permitted Use and in accordance with any applicable permit(s) pertaining to the Unit Generator. Except for permitted subtenants and assignees. Tenant may not use the Unit Generator to serve other occupant(s) of the Development.
Appears in 1 contract
Sources: Sublease Agreement (Snowflake Inc.)
Emergency Generator. (a) Tenant shall have the right to tie into and use the emergency generator to be installed by Landlord as part of the Base Building Work for use by tenants of the Unit (the “Unit Generator”). Tenant shall be responsible, at its sole cost and expense, for installing, maintaining, repairing and replacing its connection between the Premises and the Unit Generator, and all associated cabling. Tenant shall be permitted to use up to an average of three five (35) ▇▇▇▇▇ per square foot of usable area Rentable Area in the Premises from the Unit Generator, and at no time shall Tenant exceed that use limitation with respect to the Unit Generator. Except to the extent that Tenant ties into the Unit Generator as part of the Initial Tenant Work in accordance with the provisions of the Work Letter, installation of such tietine-in and any related cabling, conduit and appurtenances will be governed by the applicable provisions of this Lease relating to Tenant Work. Tenant will submit to Landlord at least thirty (30) days prior to the proposed installation date Tenant’s proposed plans and specifications relating to the tie-in to the Unit Generator and all associated lines. Tenant may not commence any work to tie into the Unit Generator until it has received Landlord’s prior written approval (not to be unreasonably withheld, delayed or conditioned) of such plans and specifications. Tenant, at its sole cost and expense, shall comply with all applicable Legal Requirements and Title Matters and Landlord’s reasonable directives relating to the installation, operation, maintenance and repair of such tie-in, including (i) obtaining and maintaining (or causing to be obtained and maintained) and complying with the provisions of all applicable permits relating to the tie into and use of the Unit Generator. Tenant may not use the Unit Generator for any purpose other than solely in connection with Tenant’s occupancy of the Premises for the Permitted Use and in accordance with any applicable permit(s) pertaining to the Unit Generator. Except for permitted subtenants and assignees. Tenant may not use the Unit Generator to serve other occupant(s) of the Development.
(b) Subject to Landlord’s prior written approval of the location, design and specifications therefor (which approval shall not be unreasonably withheld, conditioned or delayed), Tenant shall have the right, at its sole cost and expense (except to the extent to which the installation cost thereof is paid through the Landlord’s Allowance), to install, operate, repair, maintain and replace one or more back-up generators reasonably necessary for Tenant’s use (and the use of any permitted subtenants) of the Premises for the Permitted Use, including all reasonably necessary cabling and related appurtenances (collectively, the “Tenant Generators”), within the Premises. The Tenant Generators shall be tested and operated so as not to cause any odor, noise or vibration to escape the Premises, or otherwise to create any nuisance, and shall not in any way adversely affect the function of the Unit Generator. Tenant will be solely responsible for all utility charges incurred with respect to the Tenant Generators, as separately metered (at Tenant’s expense).
(c) Except to the extent a Tenant Generator is installed as part of the Initial Tenant Work in accordance with the provisions of the Work Letter, installation of a Tenant Generator and any related cabling, conduit and appurtenances will be governed by the applicable provisions of this Lease relating to Tenant Work. Tenant will submit to Landlord at least thirty (30) days prior to the proposed installation date(s) Tenant’s proposed plans and specifications relating to the installation, operation and use of each Tenant Generator and all associated lines. Tenant may not commence any work to install a Tenant Generator until it has received Landlord’s prior written approval (not to be unreasonably withheld, delayed or conditioned) of such plans and specifications. Tenant, at its sole cost and expense, shall comply with all applicable Legal Requirements and Title Matters and Landlord’s reasonable directives relating to the installation, operation, maintenance and repair of the Tenant Generators, including, but not limited to (i) obtaining and maintaining (or causing to be obtained and maintained) and complying with the provisions of all applicable permits required for the installation, operation, maintenance and repair of the Tenant Generators, (ii) implementing spill prevention control and countermeasures and containment plan(s) (as required by federal, state, or local regulations) or best management practices plan(s), (iii) providing evidence of insurance covering such facilities, and (iv) maintaining and inspecting such facilities and related equipment and keeping records related thereto. Tenant will maintain and repair the Tenant Generators in good operating condition throughout the Term, at Tenant’s sole cost and expense. All maintenance, repair and replacement of the Tenant Generators and all governmental compliance required in connection with the Tenant Generators will be Tenant’s sole responsibility and Tenant’s sole cost and expense; provided, however, if Tenant fails to commence such maintenance and repair within thirty (30) days (unless an emergency exists, in which event Tenant shall promptly commence such curative work and thereafter diligently prosecute the same to completion) after written notice from Landlord and thereafter diligently prosecutes the same to completion, then Landlord may elect to perform such maintenance at Tenant’s sole cost and expense. Upon Landlord’s request, Tenant will promptly provide Landlord with copies of all records relating to (i) the installation, operation, maintenance and repair of the Tenant Generators, and (ii) the compliance of the Tenant Generators with any applicable Legal Requirements.
(d) Tenant may not use a Tenant Generator for any purpose other than solely in connection with Tenant’s occupancy of the Premises for the Permitted Use and in accordance with any applicable permit(s) pertaining to the Tenant Generators. Tenant may not use a Tenant Generator to serve other occupant(s) of the Unit or the Building. This provision does not modify Tenant’s permitted use of the Premises, and does not relieve Tenant of any environmental liability under this Lease.
(e) Tenant will promptly report to Landlord any spill or release and any written citations or notices of violation of any Legal Requirements received by Tenant in connection with a Tenant Generator, and will provide Landlord with copies thereof. Such notification to Landlord will not relieve Tenant from its obligations to notify governmental agencies. Any cleanup or remediation will be completed by Tenant in accordance with applicable Environmental Laws and in a manner and to a level meeting the applicable state cleanup criteria, together with any applicable state assurance or closure. Tenant shall make annual inspections, at Tenant’s expense, to ensure regulatory compliance and the proper operation, maintenance and repair of the Tenant Generators, and will forward copies of such inspection reports to Landlord promptly following receipt of Landlord’s written request(s) therefor.
(f) At any time within ninety (90) days prior to the expiration of the Term, or earlier termination of this Lease, Landlord may, at Tenant’s cost and expense, cause a qualified environmental consultant reasonably acceptable to Landlord and Tenant to perform an environmental investigation to determine whether a release of any Hazardous Materials has occurred during the Term of this Lease with respect to the Tenant Generators. Upon the expiration of the Term or the earlier termination of this Lease, Tenant shall be required to remove the Tenant Generators (and any related fuel tanks, conduit, fuel lines, cabling and other appurtenances associated therewith), which work shall include (i) restoring the affected areas to their original condition prior to the installation of the Tenant Generators, and (ii) repairing any damage to the Premises or the Unit or the Building caused by the removal of the Tenant Generators. Tenant shall perform any required environmental remediation for the release of any Hazardous Materials in connection with the Tenant Generators caused by Tenant or any Tenant Party during the Term of this Lease in accordance with applicable Legal Requirements, all at Tenant’s sole cost and expense. If the environmental investigation performed by the environmental consultant as provided above confirms the release of any Hazardous Materials caused by Tenant or any Tenant Party in connection with the Tenant Generators, Tenant must thereafter perform any clean up or remediation required by applicable Legal Requirements and in accordance with applicable Legal Requirements, and document with a report prepared by a qualified environmental consultant reasonably approved by Landlord evidencing no impact to soil and groundwater exceeding state cleanup criteria for the use of the site, or that any impacted soil or groundwater has been remediated in a manner and to a level meeting the applicable state cleanup criteria, together with any applicable state assurance or closure.
Appears in 1 contract