CONNECTING TRANSMISSION OWNER INTERCONNECTION FACILITIES. There are no Connecting Transmission Owner Interconnection Facilities required for the Interim Constrained Operation Interconnection. For the Final Interconnection, the Connecting Transmission Owner Interconnection Facilities include: i. Interconnection Facilities for the Small Generating Facility (Steel Winds II) (Sole Use Facilities) One (1) revenue meter; Three (3) single phase metering Potential Transformers (PTs); Three (3) single phase metering Current Transformers (CTs); One (1) EMS RTU; and miscellaneous materials and equipment associated w/ the installation of the metering and RTU. The Connecting Transmission Owner will supply, install, and test and commission all revenue metering equipment. The CTs and PTs will be installed outdoors in the Existing Collection Station on the 13.8kV structure. The Interconnection Customer will provide and install insulated mounting surfaces for all the units. The RTU will be supplied by the Connecting Transmission Owner. The Interconnection Customer will mount the RTU and wire AC and DC power to it in accordance with National Grid’s Electric Service Bulletin 756. The Connecting Transmission Owner will test and commission the RTU. ii. Steel Winds I Interconnection Facilities Modifications (Sole Use Facilities) Due to the addition of the Small Generating Facility (Steel Winds II) and at the Interconnection Customer’s expense, the revenue metering for the Steel Winds I project will be revised. The Interconnection Facilities associated with the modifications include: Two (2) revenue meters;
Appears in 3 contracts
Sources: Standard Small Generator Interconnection Agreement (Sgia), Standard Small Generator Interconnection Agreement (Sgia), Standard Small Generator Interconnection Agreement (Sgia)