Participating TO’s Interconnection Facilities Sample Clauses
Participating TO’s Interconnection Facilities. The Participating TO shall design, procure, construct, install, own and/or control the Participating TO’s Interconnection Facilities described in Appendix A at the sole expense of the Interconnection Customer. Unless the Participating TO elects to fund the capital for the Participating TO’s Interconnection Facilities, they shall be solely funded by the Interconnection Customer.
Participating TO’s Interconnection Facilities. The Participating TO shall design, procure, construct, install, own and/or control the Participating TO’s Interconnection Facilities described in Appendix A at the sole expense of the Interconnection Customer.
Participating TO’s Interconnection Facilities. The Participating TO shall:
Participating TO’s Interconnection Facilities. Those facilities as described in Section 5(b) of this Attachment 2, as such facilities may be modified during the term of this Agreement.
Participating TO’s Interconnection Facilities. The Participating TO’s Interconnection Facilities are composed of the Customer-Financed Interconnection Facilities and the Potential Location Constrained Resource Interconnection Facilities.
Participating TO’s Interconnection Facilities. The Participating TO shall:
(i) Windhub Substation – Line Drop:
(ii) CPC East Project 230 kV Generation Tie-Line:
Participating TO’s Interconnection Facilities. The Participating TO shall:
(i) Transmission: Install one (1) 220 kV dead-end structure, two (2) spansone (1) span of conductors and, OPGW, and twelve (12six (6) dead-end insulators/hardware assemblies between the Last Structure and the dead- end rack at the Ivanpah 220kV Substation.
(ii) Ivanpah 220/115 kV Substation:
A. Terminate the Ivanpah-Stateline 220 kV Transmission Line at a dedicated double breaker line position and install the following facilities:
(1) One (1) dead-end structure (60-foot high and 50-foot wide)
(2) Three (3) 220 kV coupling capacitor voltage transformers
(3) One (1) G.E. D60 current differential relay with telecommunications channel to the Generating Facility via the OPGW on the Ivanpah- Stateline 220 kV Line
(4) One SEL 311L current differential relay with telecommunications channel to the Generating Facility via the OPGW on the Ivanpah- Stateline 220 kV Line
(iii) Telecommunications:
(1) Install approximately 75 feet offiber optic cable and underground duct to install ADSS fiber optic cable as necessary from the fence line of Ivanpah Substation to the Point of Change of Ownership to meet the diverse routing requirements for the Ivanpah-Stateline 220 kV Transmission Line protection and SPS Relays.
(2) Install all required light-wave, channel, and related terminal equipment at each terminal.
(iv) Real Properties, Transmission Project Licensing, and Environmental Health and Safety: Obtain easements and/or acquire land, obtain licensing and permits, and perform all required environmental activities for the installation of the Participating TO’s portion of the Ivanpah-Stateline 220 kV Transmission Line and telecommunication route.
(v) Metering: Install a revenue metering cabinet and revenue meters required to meter the retail load at the Generating Facility. Notwithstanding that the metering cabinet and meters will be located on the Interconnection Customer’s side of the Point of Change of Ownership, the Participating TO shall own, operate and maintain such facilities as part of the Participating TO’s Interconnection Facilities.
Participating TO’s Interconnection Facilities. The Participating TO shall:
(i) Install one (1) 500kV dead-end lattice tower inside the Colorado River Switchyard perimeter fence (ii) Construct two (2) spans of 500kV transmission line between the Point of Change of Ownership and the Point of Interconnection comprised of approximately 6000 ft. of 2-2156KCMIL ACSR conductors, 2000 ft. of OPGW, and nine insulators and hardware dead-end assemblies
Participating TO’s Interconnection Facilities. The Participating TO shall:
(i) Shared Interconnection Facilities between the ▇▇▇▇▇▇▇ West Project, TOT573 (Q746) Project and TOT672 (Q971) Project.
Participating TO’s Interconnection Facilities. SDG&E’s interconnection facilities will consist of the leads from the phase shifting transformers at the fence-line of the SDG&E Case Springs 230 kV substation to the bus work inside the substation. The Point of Interconnection is the bus work inside the SDG&E Case Springs 230 kV substation. .